Posted Mar 20, 2024, 2:33 AM
|
Registered User
|
|
Join Date: Dec 2015
Posts: 9,595
|
|
Quote:
This latest phase will consist of four buildings, which are expected to be constructed in two phases.
The first phase will include a 36-storey high-rise concrete condo tower called Jade 1 and a six-storey wood-frame rental building. Jade 1 will consist of 35 studio units, 120 one-bedrooms, 150 two-bedrooms, and 18 three-bedrooms, for a total of 323 units. The rental building will then consist of 18 studio units, 46 one-bedrooms, 46 two-bedrooms, and five three-bedrooms, for a total of 115 units.
This phase will provide a total of 371 vehicle parking spaces and 441 bicycle parking spaces across a shared four-level underground parkade.
The second phase will see the construction of a 44-storey high-rise concrete tower called Jade 2 and a six-storey woodframe condo building. Jade 2 will consist of 50 studio units, 138 one-bedrooms, 190 two-bedrooms, and 23 three-bedrooms, for a total of 401 units, while the wood-frame building will then consist of 23 one-bedrooms, 60 two-bedrooms, and 12 three-bedrooms, for a total of 95 units.
|
https://storeys.com/ledmac-burnaby-southgate-city-jade/
|