HomeDiagramsDatabaseMapsForum About
     

Go Back   SkyscraperPage Forum > Discussion Forums > Buildings & Architecture


Reply

 
Thread Tools Display Modes
     
     
  #2521  
Old Posted Apr 29, 2013, 2:07 PM
Busy Bee's Avatar
Busy Bee Busy Bee is online now
Show me the blueprints
 
Join Date: Feb 2006
Location: on the artistic spectrum
Posts: 10,356
Kind of a dirty work site. How hard is it to pick up a broom and sweep those steps, jeez?
__________________
Everything new is old again

There is no goodness in him, and his power to convince people otherwise is beyond understanding
Reply With Quote
     
     
  #2522  
Old Posted Apr 29, 2013, 6:06 PM
fimiak's Avatar
fimiak fimiak is offline
Build Baby Build
 
Join Date: Sep 2010
Location: San Francisco
Posts: 965
That Jersey City website said those steps are the 'grand staircase' to One World Trade Center....all of my NJ suspicions confirmed.
__________________
San Francisco Projects List ∞ The city that knows how ∞ 2017 ∞ 884,363 ∞ ~2030 ∞ 1,000,000
San Francisco Projects ThreadOakland Projects ThreadOceanwide Center - 275M/901'
Reply With Quote
     
     
  #2523  
Old Posted Apr 29, 2013, 8:17 PM
uakoops uakoops is offline
Registered User
 
Join Date: Jul 2009
Posts: 201
That's an amazing picture and we can see just how huge this thing will look when it's done. We can also see why the lower portal pieces at the ends are different than the rest of them, they connect to beams already in place under the semicircular "balcony". Once they are done it probably won't be noticeable after they finish welding and painting them.

I hope they leave as much of that steel as possible exposed, it will look awesome!

BTW I think a while back there was a render posted from almost that exact spot. It would be interesting to compare to the real thing.
Reply With Quote
     
     
  #2524  
Old Posted Apr 29, 2013, 9:24 PM
eleven=11 eleven=11 is offline
Registered User
 
Join Date: Aug 2012
Posts: 1,053
did anybody get a picture of the new escalators inside ???
Reply With Quote
     
     
  #2525  
Old Posted May 3, 2013, 12:15 AM
NYC GUY's Avatar
NYC GUY NYC GUY is offline
Registered User
 
Join Date: Nov 2011
Posts: 575
Is the transit Hub going to look like that pure white we see in the renderings or will it look like a steel silvery color?
Reply With Quote
     
     
  #2526  
Old Posted May 6, 2013, 8:40 PM
NYC4Life's Avatar
NYC4Life NYC4Life is offline
The Time To Build Is Now
 
Join Date: May 2008
Location: Bronx, NYC
Posts: 3,004
The Transit hub has reached above street level!


https://www.facebook.com/photo.php?f...type=1&theater
__________________
"I want to wake up in the city that never sleeps"
Reply With Quote
     
     
  #2527  
Old Posted May 7, 2013, 1:28 PM
JACKinBeantown's Avatar
JACKinBeantown JACKinBeantown is offline
JACKinBeantown
 
Join Date: Jun 2003
Location: Location: Location:
Posts: 8,846
We're going vertical!

You can see several pieces on the lower part of the webcam.
http://archives.earthcam.com/archive...gzmpr288_4.jpg
__________________
Hi.
Reply With Quote
     
     
  #2528  
Old Posted May 8, 2013, 7:57 PM
jking24 jking24 is offline
Registered User
 
Join Date: Apr 2013
Posts: 5
Portal Rib Construction

Does anyone have any details on the internal construction of the individual portal ribs (assuming they're not solid)?
Reply With Quote
     
     
  #2529  
Old Posted May 9, 2013, 7:36 PM
Traynor's Avatar
Traynor Traynor is offline
Back to Basics
 
Join Date: Oct 2009
Posts: 1,226
They don't look like much yet... But it's finally above ground anyway.


(screen capture from Earthcam found HERE )
__________________
_______________________________________
This is the Internet and is only the place for huge egos, narcissistic belief structures, imflamitory opinions, jumping to conclusions and knee-jerk reactionary thinking.
Any clear-headed, rational comments or balanced viewpoints will be considered Trolling and you will be reprimanded.
Reply With Quote
     
     
  #2530  
Old Posted May 12, 2013, 1:23 PM
jking24 jking24 is offline
Registered User
 
Join Date: Apr 2013
Posts: 5
I noticed this morning that the portal ribs in place (at least the three on the north side) have guy wires attached for support. I'm curious about the construction sequence - will they start attaching the arch segments as more ribs are put in place, building outwards from the entrance structures, or will all of the ribs go in before working on the arches?
Reply With Quote
     
     
  #2531  
Old Posted May 12, 2013, 3:42 PM
Otie's Avatar
Otie Otie is offline
Registered User
 
Join Date: Apr 2011
Posts: 700
No, there's a sequence involved.

First, 8 upper portal frames get bolted and guyed to their respective place,4 north and 4 south, following an outward-in installation. Each of them get guyed and temporary bracing is held between north and south (on skylight opening).

Then, 8 transition segments (4 north and 4 south) will arrive, each piece has its respective arch piece that will connect the portal frame to an adjacent one.

Bolting and welding begins, load is transfer to abutments and guy wires get removed.

Repeat.
__________________
"We must not believe too much in praise. The criticism is sometimes very necessary" -Dalai Lama.
Reply With Quote
     
     
  #2532  
Old Posted May 12, 2013, 4:50 PM
jking24 jking24 is offline
Registered User
 
Join Date: Apr 2013
Posts: 5
Quote:
Originally Posted by Otie View Post
No, there's a sequence involved.

First, 8 upper portal frames get bolted and guyed to their respective place,4 north and 4 south, following an outward-in installation. Each of them get guyed and temporary bracing is held between north and south (on skylight opening).

Then, 8 transition segments (4 north and 4 south) will arrive, each piece has its respective arch piece that will connect the portal frame to an adjacent one.

Bolting and welding begins, load is transfer to abutments and guy wires get removed.

Repeat.
Thanks for the information - much appreciated!
Reply With Quote
     
     
  #2533  
Old Posted May 13, 2013, 10:02 PM
NYC GUY's Avatar
NYC GUY NYC GUY is offline
Registered User
 
Join Date: Nov 2011
Posts: 575
Did this go on hold?
Reply With Quote
     
     
  #2534  
Old Posted May 13, 2013, 10:58 PM
Fishman92 Fishman92 is offline
Registered User
 
Join Date: Mar 2011
Posts: 236
Quote:
Originally Posted by NYC GUY View Post
Did this go on hold?
Did you not read any of the above posts?
Construction is now above-grade.
Reply With Quote
     
     
  #2535  
Old Posted May 14, 2013, 12:25 AM
NYC GUY's Avatar
NYC GUY NYC GUY is offline
Registered User
 
Join Date: Nov 2011
Posts: 575
Sorry Sorry I was just reading in ssc and someone said something about it costing too much. my bad.
Reply With Quote
     
     
  #2536  
Old Posted May 15, 2013, 6:14 PM
eleven=11 eleven=11 is offline
Registered User
 
Join Date: Aug 2012
Posts: 1,053
new trees

new Trees !!!

whats the deal with the garage thing
it looks like nothing is going on......
Reply With Quote
     
     
  #2537  
Old Posted May 16, 2013, 4:05 PM
jking24 jking24 is offline
Registered User
 
Join Date: Apr 2013
Posts: 5
A total of 8 ribs have been installed at the east end (4 north, 4 south). It looks like they've installed some temporary bracing between them - possibly to help with alignment pending installation of the transition segments and rib segments?

Fascinated by the large number of unique pieces of steel that will go into this project. I'm guessing that other than possibly the ends, no two pieces of the above ground steel will be alike, unless the north and south counterparts might be mirror images of each other....
Reply With Quote
     
     
  #2538  
Old Posted May 16, 2013, 7:38 PM
NYC4Life's Avatar
NYC4Life NYC4Life is offline
The Time To Build Is Now
 
Join Date: May 2008
Location: Bronx, NYC
Posts: 3,004
__________________
"I want to wake up in the city that never sleeps"
Reply With Quote
     
     
  #2539  
Old Posted May 16, 2013, 8:01 PM
Fishman92 Fishman92 is offline
Registered User
 
Join Date: Mar 2011
Posts: 236
Quote:
Originally Posted by NYC4Life View Post
That one's been going around a while. It's a good view though.
Reply With Quote
     
     
  #2540  
Old Posted May 16, 2013, 8:18 PM
PMadFlyer's Avatar
PMadFlyer PMadFlyer is offline
Registered User
 
Join Date: Jul 2012
Posts: 166
Quote:
Originally Posted by jking24 View Post
A total of 8 ribs have been installed at the east end (4 north, 4 south). It looks like they've installed some temporary bracing between them - possibly to help with alignment pending installation of the transition segments and rib segments?

Fascinated by the large number of unique pieces of steel that will go into this project. I'm guessing that other than possibly the ends, no two pieces of the above ground steel will be alike, unless the north and south counterparts might be mirror images of each other....
I pondered this. I think that because of the ribs being different lengths on either side, even portals that look identical from the outside are probably structured differently internally.
__________________
Reply With Quote
     
     
This discussion thread continues

Use the page links to the lower-right to go to the next page for additional posts
 
 
Reply

Go Back   SkyscraperPage Forum > Discussion Forums > Buildings & Architecture
Forum Jump



Forum Jump


All times are GMT. The time now is 1:17 AM.

     
SkyscraperPage.com - Archive - Privacy Statement - Top

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2024, vBulletin Solutions, Inc.