2 Canal St, Four Seasons Hotel·Driveway/ Curb Cut and Restoration
· Ref Code:1ACXD1
Print Summary
Add to Watch List
Type
riveway/ Curb Cut and RestorationApplicant:Justin CainStatus:Application SubmittedDate Filed:8/22/2019Closed:NoDescription:
Median cut on Convention Center Blvd. for traffic exiting the Four Seasons Hotel heading southbound toward Poydras St.
MSY CONRAC Bus Turn-Around
Durr Heavy Construction’s work on the $1.9M Louis Armstrong New Orleans International Airport (MSY) project involved the creation of a bus turn-around located at the existing MSY Airport Rental Car facility in Kenner, LA. The 6,000 sq ft facility includes an overhead canopy shelter with two large bus drop off / pick up lanes and queuing areas for transferring passengers. The facility has over 15,000 sq yds of new concrete paving and 8,000 sq yds of asphalt paving mill and overlay. A large stone detention pond was installed for assisting with rainwater collection for distribution into the City of Kenner’s underground drainage system.
The MSY CONRAC Bus Turn-Around will provide service to the new $1 billion, 35-gate MSY North Terminal which is set to open in fall of 201
2730 Banks St·Design Review · Project #DR158-19 · Ref Code:5MW08Z
Download (5) Print Summary Submit Add to Watch List
Type:
Design Review
Applicant:
Twiggy & Scout Properties LLC
Status:
Completeness Review
Date Filed:
8/23/2019
Closed:
No
Description:
Design review for stray cafe