  #641  
Old Posted Oct 2, 2011, 5:43 PM
Uhuniau Uhuniau is offline
Registered User
 
Join Date: Jan 2010
Posts: 8,014
Quote:
Originally Posted by DarkArconio View Post
In other words, cameras are installed that allow faster emergency service response and electronic sign boards are placed over the highway. Doesn't seem that advanced...
For Ottawa that's warp drive.
Reply With Quote
     
     
  #642  
Old Posted Oct 3, 2011, 2:59 PM
Lakche's Avatar
Lakche Lakche is offline
Registered User
 
Join Date: Jul 2009
Location: Orleans
Posts: 80
Yea, Ottawa doesn't have any overhead LED signs yet... we do have those temporary trailer-based construction LED signs that have been "permanently" mounted at the sides of the highway. Maybe they'll just add more of those...
Reply With Quote
     
     
  #643  
Old Posted Oct 4, 2011, 11:44 AM
DubberDom DubberDom is offline
Registered User
 
Join Date: Dec 2007
Location: Ottawa
Posts: 201
Quote:
Originally Posted by MaxHeadroom View Post
I've seen a possible plan of that interchange and the entire Frank Kenny realignment on some obscure Ottawa base-map somewhere in past years, and it didn't look like that. The transitway was shown extending east underneath Trim and running along the north side of the park and ride.

An interchange could be placed there, even a proper A4 since the maintenance yard in the northwest and the park-and-ride is city-owned, but with doubts as to the ability to extend the freeway anywhere past that point, why bother?
Here are the official plans for this area, construction will begin in 2012
- Trim will be 4-lanes from174 all the way up the hill, will eventually connect to Frank Kenny in phase 2 (2016). Expect New Trim to be approx 30m to the east of its currently location as it goes up the Hill.
- Park & Ride will be expanded by approx 380 spots, and access will be opened to Old Montreal Rd through extension of Dairy Rd (no more left turn issues coming out of the Park&Ride at night)
- Old Montreal/St-Joseph will be 4 lanes from Cardinal Creek (east of Trim) to 10th Line
- RR174 4-lane section will be extended approx 500m further east (after the corner)
- No interchange planned for Trim Rd, will be part of the EA for the widening of 174 beyond Trim (due in 2014). Don't expect anything concrete for construction for at least another 10 years.
- New Intersection on 174 east of Trim, to serve new OMB approved Tamarack Development on VandenHam farm (ie. where Laporte Garden is located). Probably 2015-ish
Reply With Quote
     
     
  #644  
Old Posted Oct 11, 2011, 1:58 AM
waterloowarrior's Avatar
waterloowarrior waterloowarrior is offline
National Capital Region
 
Join Date: Nov 2005
Location: Eastern Ontario
Posts: 9,244
pic of cyrville bridge (9 oct 2011 by southfacing @ flickr)
http://www.flickr.com/photos/2357560...in/photostream
Reply With Quote
     
     
  #645  
Old Posted Oct 26, 2011, 5:13 PM
Cre47's Avatar
Cre47 Cre47 is offline
Awesome!
 
Join Date: Mar 2006
Location: Orleans, ON
Posts: 1,971
__________________
"However, the Leafs have not won the Cup since 1967, giving them the longest-active Cup drought in the NHL, and thus are the only Original Six team that has not won the Cup since the 1967 NHL expansion." Favorite phrase on the Toronto Maple Leafs Wikipedia page.
Reply With Quote
     
     
  #646  
Old Posted Oct 26, 2011, 8:52 PM
Cre47's Avatar
Cre47 Cre47 is offline
Awesome!
 
Join Date: Mar 2006
Location: Orleans, ON
Posts: 1,971
On the 2012 budget, while not mention in the media (not a surprise so they want to give the impression to motorists they are left out which is not the case), there are some road expansion/widening planned for this year. Although at least they slowed down the pace for this year. $30 million for suburplosion projects.

$6.5 million for St-Joseph from Tenth Line and Trim
$24.3 million for Trim between North Service and Innes (currently underway south of Innes to Millenium Blvd)

Edit: The mayor's speech also mentionned widening of Eagleson and Stonehaven in the Bridlewood area.

They also mentionned about the 174 as well, but not indicating which part. They mention safety issues so I would presume it has to do with the section east of Trim Road.

In the south the mayor cited Cambrian Road in Half Moon Bayas well as River Road in Riverside South and Albion Road in Findlay Creek (are they talking about widening projects here?)

http://ottawa.ca/city_hall/mayor_cou...t_2012_en.html
__________________
"However, the Leafs have not won the Cup since 1967, giving them the longest-active Cup drought in the NHL, and thus are the only Original Six team that has not won the Cup since the 1967 NHL expansion." Favorite phrase on the Toronto Maple Leafs Wikipedia page.

Last edited by Cre47; Oct 27, 2011 at 6:30 PM.
Reply With Quote
     
     
  #647  
Old Posted Oct 27, 2011, 6:35 PM
Cre47's Avatar
Cre47 Cre47 is offline
Awesome!
 
Join Date: Mar 2006
Location: Orleans, ON
Posts: 1,971
Inquiry by Councillor Thompson regarding congestion on Bank Street due a traffic light at Findlay Creek. Issue will be discussed at next week's Transportation Committee

http://ottawa.ca/calendar/ottawa/cit...20Widening.pdf
__________________
"However, the Leafs have not won the Cup since 1967, giving them the longest-active Cup drought in the NHL, and thus are the only Original Six team that has not won the Cup since the 1967 NHL expansion." Favorite phrase on the Toronto Maple Leafs Wikipedia page.
Reply With Quote
     
     
  #648  
Old Posted Nov 8, 2011, 4:12 AM
waterloowarrior's Avatar
waterloowarrior waterloowarrior is offline
National Capital Region
 
Join Date: Nov 2005
Location: Eastern Ontario
Posts: 9,244
bronson avenue renewal open house nov 24th
http://ottawa.ca/residents/public_co.../index_en.html
Reply With Quote
     
     
  #649  
Old Posted Nov 9, 2011, 4:37 PM
eternallyme eternallyme is offline
Registered User
 
Join Date: Mar 2009
Posts: 5,243
Quote:
Originally Posted by waterloowarrior View Post
bronson avenue renewal open house nov 24th
http://ottawa.ca/residents/public_co.../index_en.html
North of the Queensway: narrow to 2 lanes, ban trucks, limited parking bays on alternating sides, reduce speed to 40 km/h

South of the Queensway: pretty hard to do much without gridlock or some expropriation
Reply With Quote
     
     
  #650  
Old Posted Nov 25, 2011, 6:40 PM
adam-machiavelli adam-machiavelli is offline
Registered User
 
Join Date: Jun 2005
Posts: 1,244
http://www.cbc.ca/news/canada/ottawa...-slimming.html

City engineers have concluded Bronson -NORTH OF THE QUEENSWAY, can't be narrowed because it's too busy when in fact the purpose of a road diet is to reduce traffic. It's like engineers can't see past the ends of their noses.
Reply With Quote
     
     
  #651  
Old Posted Dec 3, 2011, 2:48 PM
Richard Eade Richard Eade is offline
Registered User
 
Join Date: Mar 2008
Location: Nepean
Posts: 1,952
Thursday evening (Dec. 1, after 22:00), the west-bound traffic was again using the north Heron Road Bridge. It looks like it was re-opened ahead of the Dec. 3 estimate.

It seems as if there is a Jersey barrier along the south side of the north bridge, but the railing on the north side looks to be a mass of steel beams pretending to be an open railing. It is a shame that the beautiful views need to be blocked out in the name of safety. I don't recall any accidents along that bridge when the old (more 'transparent') railings were there. I have the same issue with the Hunt Club (Sheflin) Bridge with its walls.

Next year, the south bridge will under go the same treatment.
Reply With Quote
     
     
  #652  
Old Posted Dec 3, 2011, 5:08 PM
Richard Eade Richard Eade is offline
Registered User
 
Join Date: Mar 2008
Location: Nepean
Posts: 1,952
It seems that they are building the Strandherd-Armstrong Bridge on the east bank of the Rideau River and then they will move it into position.

There are a few pictures from Dec. 1, 2011:

View from the Armstrong/River Road intersection of the west-bound half of the bridge


Detail of the construction of the ribs under the west-bound running way (one 'box' per lane)


The curve for the 'out-rigger' sidewalk is taking shape


A view from the west (Judging from the towers, there are about 8 ribs still to be added and another short tower.)


The temporary structures to support the bridge when it is slid across the river


The towers above the deck ribs will be used to position and hold the arches while the cables are strung. The towers give you a sense of how high the arches will be. They have constructed 'rails' under the bridge (visible in the 'sidewalk curve' picture above) so that it can be moved, but the towers are built up from the ground. The towers will need to be removed before the bridge can be moved. From the looks of it, during the move the ends of the arches will be on wheels on the rails and the bridge deck will be suspended by the cables from the arches. Since the land upon which the bridge is being built is higher than the mounding pads for the arches, I assume that the temporary support structures will have some form of hydraulic lift to lower the bridge into place once it has neen slid out over the river. I hope they provide advanced notice of when the move will take place. It would be interesting to watch; kind of like the Rapid Bridge Replacement of the 417 bridges.
Reply With Quote
     
     
  #653  
Old Posted Dec 3, 2011, 5:12 PM
gjhall's Avatar
gjhall gjhall is offline
Registered User
 
Join Date: Aug 2009
Location: Ottawa
Posts: 1,297
Very cool. Thanks for the update and pics.
Reply With Quote
     
     
  #654  
Old Posted Dec 3, 2011, 5:47 PM
Richard Eade Richard Eade is offline
Registered User
 
Join Date: Mar 2008
Location: Nepean
Posts: 1,952
Should have put it under the Strandherd-Armstrong Bridge thread, though. Perhaps one of the Moderators can move it for me. Sorry about that.
Reply With Quote
     
     
  #655  
Old Posted Dec 3, 2011, 6:32 PM
Cre47's Avatar
Cre47 Cre47 is offline
Awesome!
 
Join Date: Mar 2006
Location: Orleans, ON
Posts: 1,971
Related to the above couple of posts. Not sure if I've mentionned that before but looking at the City of Ottawa cams, I think the Earl Armstrong widen project is virtually completed.
__________________
"However, the Leafs have not won the Cup since 1967, giving them the longest-active Cup drought in the NHL, and thus are the only Original Six team that has not won the Cup since the 1967 NHL expansion." Favorite phrase on the Toronto Maple Leafs Wikipedia page.
Reply With Quote
     
     
  #656  
Old Posted Dec 3, 2011, 9:32 PM
S-Man S-Man is offline
Registered User
 
Join Date: Mar 2011
Posts: 1,639
Drove down it today and yes, it is complete, as is the Limebank widening. With the bridge opening this coming year, and all the road infrastructure in place, expect an explosion (suburbplosion?) of home building next year.
Reply With Quote
     
     
  #657  
Old Posted Dec 4, 2011, 12:40 AM
Cre47's Avatar
Cre47 Cre47 is offline
Awesome!
 
Join Date: Mar 2006
Location: Orleans, ON
Posts: 1,971
All the more reasons to hurry up on that Barrhaven-Leitrim link plus the O-Train extension to Leitrim. The ideal for me would be the first shovel been given next spring. The likelyhood would be another year or two later at least.
__________________
"However, the Leafs have not won the Cup since 1967, giving them the longest-active Cup drought in the NHL, and thus are the only Original Six team that has not won the Cup since the 1967 NHL expansion." Favorite phrase on the Toronto Maple Leafs Wikipedia page.
Reply With Quote
     
     
  #658  
Old Posted Dec 7, 2011, 4:27 AM
waterloowarrior's Avatar
waterloowarrior waterloowarrior is offline
National Capital Region
 
Join Date: Nov 2005
Location: Eastern Ontario
Posts: 9,244
link to pic of limebank by southfacing @ flickr
http://www.flickr.com/photos/2357560...ream/lightbox/
Reply With Quote
     
     
  #659  
Old Posted Dec 7, 2011, 6:35 PM
rocketphish's Avatar
rocketphish rocketphish is offline
Planet Ottawa and beyond
 
Join Date: Feb 2009
Location: Ottawa
Posts: 12,300
Quote:
Originally Posted by waterloowarrior View Post
link to pic of limebank by southfacing @ flickr
http://www.flickr.com/photos/2357560...ream/lightbox/
Reply With Quote
     
     
  #660  
Old Posted Dec 10, 2011, 5:24 PM
waterloowarrior's Avatar
waterloowarrior waterloowarrior is offline
National Capital Region
 
Join Date: Nov 2005
Location: Eastern Ontario
Posts: 9,244
Proposed Roadway Modifications
Pursuant to By-law No. 2006–483, the City of Ottawa is providing notice to the public of its intention to approve road modifications at the following locations in accordance with the authority under By-law No. 2011-28:

Industrial Avenue, Alta Vista Drive to Neighborhood Way

New sidewalk on south side
New multi-use pathway
Concrete median extension
New accesses (two)
New bus pads

Neighborhood Way, Industrial Avenue to Coronation Avenue

New barrier curbs on east and west sides
New sidewalk on west side
New access

Maravista Drive at Strandherd Drive

New northbound right-turn lane
New northbound bicycle pocket
New concrete median

Terry Fox Drive from Cope Drive to Fernbank Road

Terry Fox Drive

New southbound right-turn lane
New southbound bicycle lane
New multiuse pathway
New traffic signal at Cope Drive

Fernbank Road

New westbound bicycle lane
New westbound right-turn lane
New eastbound left-turn lane at site access
New multiuse pathway
New paved shoulders
New concrete median
New traffic signal at site access
Reply With Quote
     
     
This discussion thread continues

Use the page links to the lower-right to go to the next page for additional posts
 
 
Reply

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Ontario > Ottawa-Gatineau > Transportation
Forum Jump



Forum Jump


All times are GMT. The time now is 9:28 AM.

     
SkyscraperPage.com - Archive - Privacy Statement - Top

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2024, vBulletin Solutions, Inc.