Pics by Yellow Fever at SSC - dated May 29, 2013.
Some of the balconies are being painted black.
The red/orange looks great. Still wondering about the last of the bare concrete edges though (east and west facades)...
Quote:
Originally Posted by Yellow Fever
|
Website render shows walls added to the open ends, so the finishing of teh red could be awaiting installation of those walls.
http://therolston.com/