  #21  
Old Posted Mar 2, 2008, 8:44 AM
NYC2ATX's Avatar
NYC2ATX NYC2ATX is offline
Everywhere all at once
 
Join Date: Aug 2006
Location: SI NYC
Posts: 2,448
OK this is a little strange.

Click this link: http://www.nadelarc.com
After the intro, click portfolio.....what do you see?

That's not the 5th & Columbia Tower. That's a residential tower designed for the corner of Wilshire & Hobart in metro L.A. If you look under residential projects on the same website, it's listed there.

It's also listed on in the L.A. Metro thread, under proposed projects:

http://forum.skyscraperpage.com/showthread.php?t=142650

I dunno, I found this a little odd.
__________________
BUILD IT. BUILD EVERYTHING. BUILD IT ALL.
     
     
  #22  
Old Posted Mar 2, 2008, 11:09 AM
Urban Zombie's Avatar
Urban Zombie Urban Zombie is offline
Crisp and Squishy
 
Join Date: Mar 2003
Location: Kailua-Kona
Posts: 7,823
^
Other than the zig-zags, I see no similarities--if that's what you're getting at.
__________________
As a staunch Marxist, I don't want to belong to any club that would accept me as a member. Those are my principles, and if you don't like them... well I have others.
     
     
  #23  
Old Posted Mar 2, 2008, 4:56 PM
Hoodrat Hoodrat is offline
Registered User
 
Join Date: Jan 2006
Location: >TACOMA<
Posts: 893
Somewhat similar, but the one in L.A. is basically just a box.

The Seattle tower is most definately not. Plus its an office bldg. and does not feature balconies.
     
     
  #24  
Old Posted Apr 8, 2008, 6:47 AM
JiminyCricket II JiminyCricket II is offline
good time not a long time
 
Join Date: Sep 2002
Location: San Jose
Posts: 3,675
Some more renderings and the project schedule and stuff...

There's now a website for the tower: Fifth&Columbia

Expected Schedule of building:

January 2008 - Issuance of revised Master Use Permit by the City of Seattle
April 2008 - Demolition of administrative building will commence
June 2008 - Excavation will commence on the site
August 2008 - Construction of underground parking facility will commence
July 2009 - Construction of High Rise portion of project will commence
July 2010 - Completion of Office Building and tenant move-in

Facts and Figures:

* Fifth & Columbia is the first high rise to be designed to meet the Gold LEED certified rating for "core and shell and interiors" in Seattle
* The cost of foreign-sourced materials represents less than 5% of the cost of the construction of the Tower itself.
* The "faceted" frame of the Tower will contain roughly 20% less steel than would a conventional perimeter frame - saving approximately 25,000 tons of steel.
* Each triangle in the faceted is fifteen stories tall, or 165 feet.
* Daylight sensors to control lighting and reduce energy use
* Over one mile of glass office fronts
* Over 90% of structural steel contains recycled material
* 15 passenger elevators
* Wi-Max enabled building
* 2,000 low energy light fixtures
* Over 10,000 ceiling tiles with recycled materials
* High-speed fiber optic data transmission - 10x faster than most buildings

Gross Area: 760,000 ft² / 70,500 m²
Net Rentable Area: 700,000 ft² / 60,000 m²
Chargeable Floor Area:
Typical Gross Floor Area: 18,500 ft² (1,700 m²)
Typical Floor to Floor Height: 13'-6" (4 m)
Building Height: 550 ft (180 m)
Number of Stories: 43

Ownership: Fifth & Columbia Investors, LLC
Development Manager: Daniels Development Co.
General Contractor: Turner Construction Co
Architect: ZGF
Structure: Arup
Shoring Design: CPL
MEP: Sysken Hennesy Group
Vertical Transportation: Edgett Williams Consulting Group, Inc
Lighting:
Civil: CPL
Historical Architect: Ron Wright AIA

Pictures from the site:

Southwest View:




Smith Tower View:


5th & Columbia View:


Ranier Club View:


Previous Designs:

Design One:




Design Two:




Current Design:



All pictures from Fifth&Columbia.com
     
     
  #25  
Old Posted Apr 8, 2008, 7:01 AM
GVNY's Avatar
GVNY GVNY is offline
Beat it, bi(t)ches.
 
Join Date: Jul 2004
Location: Old Tacoma, Washington
Posts: 1,238
I do not understand the praise this building has attained for its design, for it is merely avant-garde angling of steel sheathed in attractive glass. However, it is interesting nonetheless, and it possesses the possibility to look very handsome in the skyline.
     
     
  #26  
Old Posted Apr 8, 2008, 4:05 PM
Complex01's Avatar
Complex01 Complex01 is offline
Endless Moments...
 
Join Date: Aug 2006
Location: Texas...
Posts: 2,927
I love the glass - silverish color. It blends in so well with its neighbors. A great project in deed...

     
     
  #27  
Old Posted Apr 9, 2008, 4:50 PM
djvandrake's Avatar
djvandrake djvandrake is offline
I'm going slightly mad.
 
Join Date: Apr 2007
Location: California
Posts: 787
I'm not crazy about the base, but the rest of the design is stunning. Love it.
__________________
My Chicago Pics, July 2009
     
     
  #28  
Old Posted Apr 21, 2008, 5:32 AM
Aleks's Avatar
Aleks Aleks is offline
cookies, skittles & milk
 
Join Date: Feb 2007
Location: Seattle
Posts: 6,257
^^ The base was designed to minimize the impact of shadows on the near by Rainier Club and First United Methodist Church. It will have a "living" wall on the Columbia street side which I'm guessing would be a wall full of ivy and such to filter out excessive water when we get one of those Northwestern rainy days.
__________________
...the greatness of victor is equally proportionate to the skill and obduracy of foe...
-Kostof-
     
     
  #29  
Old Posted May 5, 2008, 6:52 PM
JiminyCricket II JiminyCricket II is offline
good time not a long time
 
Join Date: Sep 2002
Location: San Jose
Posts: 3,675
Update:

The building that occupies the location of this tower is basically all demolished. One step closer to moving this thread to the 'Skyscraper Construction' section!
     
     
  #30  
Old Posted Jun 27, 2008, 4:15 PM
NDPhilly's Avatar
NDPhilly NDPhilly is offline
Registered User
 
Join Date: Apr 2008
Location: suburban philly,PA(Glen Mills)
Posts: 171
The Designs 1 and 2 make have sot of a New York Times building look.
__________________
my mini city - http://glen-mills.myminicity.com/
     
     
  #31  
Old Posted Aug 21, 2008, 8:48 PM
alexjon's Avatar
alexjon alexjon is offline
Bears of antiquity
 
Join Date: Dec 2005
Location: Downtown/First Hill, Seattle, WA
Posts: 8,340
Isn't the parking portion supposed to start this month?

Edit: n/m, pushed back an entire year to 2011.

2011 will be big for high rise openings in Seattle
__________________
"The United States is in no way founded upon the Christian religion." -- George Washington & John Adams in a diplomatic message to Malta
     
     
  #32  
Old Posted Aug 31, 2008, 7:26 AM
3countriesplan 3countriesplan is offline
BANNED
 
Join Date: Aug 2008
Posts: 17
Is this thing going up for sure?
     
     
  #33  
Old Posted Sep 20, 2008, 7:59 PM
Hoodrat Hoodrat is offline
Registered User
 
Join Date: Jan 2006
Location: >TACOMA<
Posts: 893
If Wamu gets bought out, I suspect this one is going on the back burner. There's gonna be too much office space available.
     
     
  #34  
Old Posted Sep 28, 2008, 9:15 AM
Hot Rod's Avatar
Hot Rod Hot Rod is offline
Big City Enthusiast
 
Join Date: Feb 2006
Location: Seattle-Vancouver-Osaka-Chongqing-Chicago-OKC
Posts: 1,174
WaMu GOT bought out, for pennies to the dollar!

Unfortunately, Im sure this wont get built now - it was announced that JPMorgan is going to sell the WaMu Center and largely vacate WAMU tower. That's at least 1.3M sq feet dumped into downtown's market.
     
     
  #35  
Old Posted Sep 28, 2008, 11:59 PM
Aleks's Avatar
Aleks Aleks is offline
cookies, skittles & milk
 
Join Date: Feb 2007
Location: Seattle
Posts: 6,257
Yeah, they said on the news that the percentage of vacancy rate was going to go up 2% just because of the sale.

We still have the Smith Tower too which also has a lot of sq. footage vacant. Man oh man, something needs to get done before more proposals are put on hold [or canceled].
__________________
...the greatness of victor is equally proportionate to the skill and obduracy of foe...
-Kostof-
     
     
  #36  
Old Posted Jan 30, 2010, 1:39 AM
Dylan Leblanc's Avatar
Dylan Leblanc Dylan Leblanc is offline
Website Manager
 
Join Date: Dec 1999
Posts: 9,318
Here's a neat skyline timeline video from the building's website.

     
     
  #37  
Old Posted Jan 30, 2010, 8:28 AM
NYC2ATX's Avatar
NYC2ATX NYC2ATX is offline
Everywhere all at once
 
Join Date: Aug 2006
Location: SI NYC
Posts: 2,448
Thanks Dylan. The building looks gorgeous in the video, the way the facade shimmers like that. Here's to hoping it's built!
__________________
BUILD IT. BUILD EVERYTHING. BUILD IT ALL.
     
     
  #38  
Old Posted Jan 30, 2010, 7:00 PM
Busy Bee's Avatar
Busy Bee Busy Bee is online now
Show me the blueprints
 
Join Date: Feb 2006
Location: on the artistic spectrum
Posts: 10,302
The is the first rendering animation video that I can think of seeing that actually shows the glass how it will look in reality, waviness and all and not suggesting the building will be glazed in 3/4" bulletproof German glass like most renderings/animations. Thumbs up to the architect and renderer for being honest.
__________________
Everything new is old again

There is no goodness in him, and his power to convince people otherwise is beyond understanding
     
     
  #39  
Old Posted Jan 30, 2010, 8:39 PM
1977's Avatar
1977 1977 is offline
Registered User
 
Join Date: Nov 2009
Location: Bay Area
Posts: 996
FYI, I was just in SeaTac the other day and saw some models of this building's design evolution as well as one very large model of the final design. If I remember correctly, it was near the security line for Terminal A. There were models and renderings of other buildings as well but this one seemed to be highlighted.
     
     
  #40  
Old Posted Feb 2, 2010, 6:11 AM
Hoodrat Hoodrat is offline
Registered User
 
Join Date: Jan 2006
Location: >TACOMA<
Posts: 893
Cool video, thanks for posting

However, Seattle's office vacancy rate is at historic highs right now due to Wamu's collapse...I just don't see this getting built unless the demand for LEED Gold office space compels some companies to move there
     
     
This discussion thread continues

Use the page links to the lower-right to go to the next page for additional posts
 
 
 

Go Back   SkyscraperPage Forum > Discussion Forums > Buildings & Architecture > Completed Project Threads Archive
Forum Jump


Thread Tools
Display Modes

Forum Jump


All times are GMT. The time now is 10:14 PM.

     
SkyscraperPage.com - Archive - Privacy Statement - Top

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2024, vBulletin Solutions, Inc.