  #41  
Old Posted Nov 3, 2015, 7:23 AM
timbad timbad is offline
heavy user of walkability
 
Join Date: May 2008
Location: Mission Bay, San Francisco
Posts: 3,150
Quote:
Originally Posted by peanut gallery View Post
So, not October but hopefully November. I so want this and especially its next door neighbor to get started.
very much agree. these projects on Folsom (and the redo of the Folsom streetscape) are more important than the ones on Rincon Hill - as much as we appreciate their impact on the skyline - from the perspective of weaving the City together.
     
     
  #42  
Old Posted Nov 16, 2015, 8:13 AM
timbad timbad is offline
heavy user of walkability
 
Join Date: May 2008
Location: Mission Bay, San Francisco
Posts: 3,150
no sign of activity yet on 400 or 500 Folsom...

     
     
  #43  
Old Posted Dec 6, 2015, 6:12 PM
timbad timbad is offline
heavy user of walkability
 
Join Date: May 2008
Location: Mission Bay, San Francisco
Posts: 3,150
there was a single piece of equipment onsite when I walked by yesterday...

     
     
  #44  
Old Posted Jan 18, 2016, 10:51 PM
minesweeper minesweeper is offline
Registered User
 
Join Date: Jul 2011
Location: San Francisco
Posts: 613
01/18/2016

Still just that lonely piece of equipment and no other signs of activity:

     
     
  #45  
Old Posted Feb 14, 2016, 6:11 AM
slock slock is offline
Registered User
 
Join Date: Jul 2005
Location: Los Angeles
Posts: 383
In the first sign of potential movement, I went by the site this afternoon and Balfour Beatty, the contractor, has posted signs on the green fence that don't appear in previous photos. I expect this is weeks away from starting.
     
     
  #46  
Old Posted Feb 14, 2016, 7:52 AM
1977's Avatar
1977 1977 is offline
Registered User
 
Join Date: Nov 2009
Location: Bay Area
Posts: 996
Quote:
Originally Posted by slock View Post
In the first sign of potential movement, I went by the site this afternoon and Balfour Beatty, the contractor, has posted signs on the green fence that don't appear in previous photos. I expect this is weeks away from starting.
Sounds promising! Thanks for the update.

This and Block 8 (which will hopefully break ground soon) are really going to gel downtown to the current Rincon Hill cluster. It'll be great to see all of the sidewalk and street improvements come together as well. Exciting times.
     
     
  #47  
Old Posted Feb 25, 2016, 11:32 PM
botoxic botoxic is offline
Registered User
 
Join Date: Dec 2006
Location: The Mission
Posts: 690
From the SF Projects thread:
Quote:
Originally Posted by david_h View Post
I don't think we have a Transbay Block 9 thread, but prep work has started...

     
     
  #48  
Old Posted Mar 15, 2016, 9:09 PM
ElDuderino's Avatar
ElDuderino ElDuderino is offline
Droppin' Loads
 
Join Date: Nov 2010
Location: Ventura, Santa Rosa, California
Posts: 288
Quote:
Site Prep for 400-Foot Transbay Tower with 545 Units Underway
March 15, 2016

Building permits have been issued and the site prep for the 42-story Transbay District tower to rise up to 400-feet in height on the northwest corner of Folsom and First, across the street from Transbay Block 8, is now underway.

Also known as 500/510 Folsom, the Transbay Block 9 tower will yield a total of 545 apartments of which 436 (80 percent) will be Market Rate. The 109 Below Market Rate (BMR) units, which will be distributed across the lower 21 floors of the tower and the building’s 9-story podium, will be available to households earning up to 50% of the Area Median Income (AMI).

The ground floor of the development will include nearly 7,000 square feet of retail and a 3,000 square-foot open space, with an underground garage for 206 bikes and 267 cars.

TMG Partners and Essex Property Trust paid $43,630,000 for the Block 9 parcel and construction for the $240 million development is scheduled to take 38 months, which means the Transbay District tower should be ready for occupancy in early 2019.
From Socketsite: http://www.socketsite.com/archives/2...-underway.html
     
     
  #49  
Old Posted Mar 23, 2016, 8:43 PM
cwilly cwilly is offline
Registered User
 
Join Date: Apr 2013
Posts: 50
Prep Work Continues



     
     
  #50  
Old Posted Mar 24, 2016, 6:28 AM
timbad timbad is offline
heavy user of walkability
 
Join Date: May 2008
Location: Mission Bay, San Francisco
Posts: 3,150
Quote:
Originally Posted by cwilly View Post
side note: across Folsom (and on the left side in the pic), a building that used to have a notch on one corner, presumably because the freeway used to curve past that spot, appears to be getting that corner squared off.
     
     
  #51  
Old Posted Mar 24, 2016, 7:17 PM
AndrewK AndrewK is online now
Registered User
 
Join Date: Mar 2008
Location: San Francisco
Posts: 451
Quote:
Originally Posted by timbad View Post
side note: across Folsom (and on the left side in the pic), a building that used to have a notch on one corner, presumably because the freeway used to curve past that spot, appears to be getting that corner squared off.
That is a really interesting project. do you know if they are doing anything with the adjoining parking lot?
     
     
  #52  
Old Posted Mar 25, 2016, 3:39 AM
timbad timbad is offline
heavy user of walkability
 
Join Date: May 2008
Location: Mission Bay, San Francisco
Posts: 3,150
Quote:
Originally Posted by AndrewK View Post
That is a really interesting project. do you know if they are doing anything with the adjoining parking lot?
I'll try to walk by this weekend and see, but all I know is from observation; no other special insight into what they're doing there
     
     
  #53  
Old Posted Apr 3, 2016, 5:07 AM
timbad timbad is offline
heavy user of walkability
 
Join Date: May 2008
Location: Mission Bay, San Francisco
Posts: 3,150
Quote:
Originally Posted by AndrewK View Post
That is a really interesting project. do you know if they are doing anything with the adjoining parking lot?
here's a better shot from today... didn't look like anything was happening on the parking lot

     
     
  #54  
Old Posted Apr 9, 2016, 7:50 PM
timbad timbad is offline
heavy user of walkability
 
Join Date: May 2008
Location: Mission Bay, San Francisco
Posts: 3,150
Quote:
Originally Posted by timbad View Post
here's a better shot from today... didn't look like anything was happening on the parking lot

btw, here is shot showing the former 'notch' in the corner, from Feb this year

     
     
  #55  
Old Posted Apr 19, 2016, 7:08 PM
botoxic botoxic is offline
Registered User
 
Join Date: Dec 2006
Location: The Mission
Posts: 690
     
     
  #56  
Old Posted Apr 19, 2016, 9:16 PM
viewguysf's Avatar
viewguysf viewguysf is offline
Surrounded by Nature
 
Join Date: Jan 2007
Location: Walnut Creek, California
Posts: 2,028
Wow! Great shot and incredible that they're actually starting on this considering the rising conversations about markets cooling!
     
     
  #57  
Old Posted Jul 5, 2016, 8:30 AM
timbad timbad is offline
heavy user of walkability
 
Join Date: May 2008
Location: Mission Bay, San Francisco
Posts: 3,150
this was last week. still early stages...

     
     
  #58  
Old Posted Aug 25, 2016, 8:43 AM
mdsayh1 mdsayh1 is offline
Registered User
 
Join Date: Jan 2008
Location: NewYork, San Francisco
Posts: 62
Pile driving has begun on this one.
     
     
  #59  
Old Posted Aug 28, 2016, 7:43 PM
timbad timbad is offline
heavy user of walkability
 
Join Date: May 2008
Location: Mission Bay, San Francisco
Posts: 3,150
     
     
  #60  
Old Posted Sep 6, 2016, 6:26 AM
timbad timbad is offline
heavy user of walkability
 
Join Date: May 2008
Location: Mission Bay, San Francisco
Posts: 3,150
a look from the alley behind this project, with view of the triangular neighbor building

     
     
This discussion thread continues

Use the page links to the lower-right to go to the next page for additional posts
 
 
 

Go Back   SkyscraperPage Forum > Discussion Forums > Buildings & Architecture > Completed Project Threads Archive
Forum Jump


Thread Tools
Display Modes