What Nchkay has planned for the North Shore reserve sites.
Lions Gate they have condos at the Capilano Road intersection and replacement of the International Plaza building. Seems like lower density townhomes for members and community services on the rest of Marine Drive along with those empty lots where all those member SFHs are located. Seems like development near the water treatmenet plan and land other other side of the railroad isn't specified.
Second Narrows site will need to account for future bridge replacement and whatever long term they plan with the rail crossing. For some reason they stuck a bridge buffer on the west side of the existing bridge possibly for Skytrain and a possible station next to the substation with some kind of east/west crossing over the highway. Condos near the Seylynn towers and Real Canadian Superstore.
Quote:
Creation of a new Nation Community Service & Office Centre along with new revenue-generating land uses and Member housing options.
Honouring the former riverbed and the healing qualities of the former waterway.
Re-enforcing Sḵwx̱wú7mesh lands and territory through culturally informed architecture and artwork at this high traffic location.
|
Quote:
Reconnect the lands and existing Member homes to the riverway and waterfront.
Restore and remediate contaminated lands and the impacted waterways.
Maximize revenue-generating land uses to provide economic prosperity for generations to come and fund new Nation amenities and community growth.
Reclaim former reserve lands through neighbouring infrastructure changes.
|
https://www.nchkay.com/developmentstrategy/