HomeDiagramsDatabaseMapsForum About
     

Go Back   SkyscraperPage Forum > Global Projects & Construction > City Compilations


Reply

 
Thread Tools Display Modes
     
     
  #13461  
Old Posted Jan 19, 2018, 7:12 PM
tennis1400 tennis1400 is offline
-
 
Join Date: Aug 2003
Posts: 7,474
[QUOTE=hightech1217;8053253]
Quote:
Originally Posted by tennis1400 View Post
1031 Canal St, Temp A·Construction Loop ·Ref Code: 7XB6AC
Print Summary Submit Add to Watch List
Type:
Construction Loop
Applicant:
Timothy Samuel Blanchard
Status:
Application Submitted
Date Filed:
1/16/2018
Closed:
No
Description
1,200 amp, 120/208v underground, (2) 200 amp circuits for tower cranes. Building permit 13-43016-NEWC


Not sure if 1031 Canal will be strictly hotel rooms, but the link below is a video from Dec 2016 of a penthouse condo. Looks nice.

https://player.vimeo.com/video/21263...e=0&portrait=0
Pretty sure its all hotel rooms now... but a penthouse condo could easily become a penthouse suite.. btw since it says tower cranes i think its safe to say we are getting two
Reply With Quote
     
     
  #13462  
Old Posted Jan 19, 2018, 7:21 PM
tennis1400 tennis1400 is offline
-
 
Join Date: Aug 2003
Posts: 7,474






Reply With Quote
     
     
  #13463  
Old Posted Jan 19, 2018, 7:57 PM
jjslonaker jjslonaker is offline
NOLA Razorback
 
Join Date: Jan 2012
Location: New Orleans, LA
Posts: 457
Quote:
Originally Posted by tennis1400 View Post






Really like this (hopefully) final design! Taller than it looks too, great infill
Reply With Quote
     
     
  #13464  
Old Posted Jan 20, 2018, 7:31 AM
SlidellWx's Avatar
SlidellWx SlidellWx is offline
Registered User
 
Join Date: Nov 2005
Location: New Orleans
Posts: 1,551
Great to see 1031 and Virgin moving forward. As far as the Airport interchange, I think that hotel may be a goner. The eastbound I-10 flyover ramp will likely have to go right through that building. I guess we'll find out when the finalized design is unveiled.
__________________
Slidell, LA...The Camellia City
Reply With Quote
     
     
  #13465  
Old Posted Jan 20, 2018, 6:38 PM
tennis1400 tennis1400 is offline
-
 
Join Date: Aug 2003
Posts: 7,474
Quote:
Originally Posted by SlidellWx View Post
Great to see 1031 and Virgin moving forward. As far as the Airport interchange, I think that hotel may be a goner. The eastbound I-10 flyover ramp will likely have to go right through that building. I guess we'll find out when the finalized design is unveiled.
can they just cut a hole through it?
Reply With Quote
     
     
  #13466  
Old Posted Jan 21, 2018, 4:31 PM
Blitzen Blitzen is offline
Registered User
 
Join Date: Mar 2010
Posts: 719
Port of New Orleans eyes second container facility

http://neworleanscitybusiness.com/bl...iner-facility/

Quote:
The Port of New Orleans is considering adding a second container facility to meet future demands and potentially double the port’s container capacity.

On Tuesday, the Port’s Board of Commissioner’s planning and engineering committee passed an item that would award up to $300,000 to Los Angeles-based AECOM Technical Services LLC to evaluate a 675-acre piece of land in Meraux to determine suitability for development.

Port president and CEO Brandy Christian said they are eyeing a Louisiana Economic Development-certified property in St. Bernard Parish known as The Sinclair Tract, located at 3911 E. St. Bernard Highway.

Christian said the measure is part of the new master plan the port will be unveiling in the next couple of months. The port aims to expand its economic activity across the three-parish jurisdiction of Orleans, Jefferson and St. Bernard parishes. Although the port’s jurisdiction includes St. Bernard, the port does not currently have maritime facilities there.

Port officials want to expand the port’s complex beyond its current land-constrained sites. Michelle Ganon, vice president of public affairs at the port, said they are in the beginning of a 12-month due diligence process and the port does not have a definitive timeline for possible construction. She said it will be a multi-year, $1+ billion project with infrastructure investments both on the property and nearby to ensure both maritime and community needs are accommodated.

“We will be better able to provide an estimated timeline and budget parameters as results from our studies become available,” Ganon said.

Beginning immediately, the port will be assessing the site, current and potential rail and traffic issues and related community impacts to identify mitigations that “ensure a positive project overall,” Ganon said.

Ganon said the port will continue to invest in its existing New Orleans cargo facilities.

“However, building an additional state-of-the-art container terminal with adjacent land to attract new logistics-related businesses — such as transloading, warehousing, distribution and light manufacturing — will allow Louisiana and the port complexes on the Lower Mississippi River unprecedented opportunity to grow cargo volumes, capture new market segments and increase economic impacts statewide,” Ganon said.

Ganon said the port’s current container facility is sufficient to satisfy present and forecasted demand.

“However, we want to be able to continue as a vital link in the global supply chain for generations to come,” Ganon said. “A second terminal would give us both needed flexibility and necessary space and would be complementary to help us realize the opportunity and increase our economic impact for our jurisdiction’s residents.”

The feasibility studies will address specific numbers, but port officials anticipate that the site would be able to at least match the capacity of their current terminal – 1.5 million 20-foot-equivalent containers.

“The site could have the added advantage of adjacent logistics-related businesses,” Ganon said.

The Sinclair site would be developed with the goal of three berths that could accommodate all three ocean alliance carriers and provide needed space for cargo related activities at both terminals, Ganon said.

Andree Fant, vice president of planning and facilities at the port, said AECOM has port facility development expertise and has been successful at similar evaluations.

“They have an extensive local team that has diverse skills and knowledge of the circumstances in the area,” Fant said. “That is going to expedite the evaluation.”

The initial investigation into the site is expected to cost about $225,000.

“Among other things, we need to determine if we can construct a suitable wharf that can be connected to the marshalling yard over the levy and the railroad that are there,” Fant added.

The property is nestled along the Mississippi River, about 21 miles from Louis Armstrong International Airport, eight miles from Interstate 10 and a short distance to Louisiana 39, the Norfolk Southern Railroad and the New Orleans Public Belt.

According to LED, the property comprises a 150-acre riverside container terminal, a 127-acre industrial park and a rear 398-acre industrial and distribution campus.

“The tract could be buffered from adjacent land uses, and have planned quality growth,” LED’s website reads. “Alternative mixed land-use concepts are also possible.”

The site is presently undeveloped and zoned for “heavy industrial” use, according to LED. The front section of the site from the river to E. Judge Perez Drive is an open pasture, while the existing northern tract is lowland woods. The Sinclair Tract is a greenfield site with no recent history of industrial or other use.

Thousands of acres of marshland are north of the site, while the St. Bernard Grove subdivision sits to the east. To the south is the river levee, batture and Mississippi River and to the west is the Cypress Gardens subdivision, according to LED.

If the results of the study are favorable, the port will likely commission additional studies either with AECOM or other consultants. The unbudgeted two-year contract is up for full board approval at its regular board meeting on Friday.

“While this study is unbudgeted, we have excess operating money that we can spend to start this evaluation,” Fant said. Subconsultants on the project would be Eustis Engineering Services LLC of Metairie. Tony Evett would be project manager.
Reply With Quote
     
     
  #13467  
Old Posted Jan 22, 2018, 6:08 PM
prokowave prokowave is offline
Registered User
 
Join Date: Jun 2010
Posts: 526
Quote:
Originally Posted by tennis1400 View Post
Pics or it didn’t happen!

If you can take pics try to
Managed to snag a few right as they were bringing in a second crane. Pilings are on site and moving full speed ahead:


Reply With Quote
     
     
  #13468  
Old Posted Jan 22, 2018, 7:55 PM
tennis1400 tennis1400 is offline
-
 
Join Date: Aug 2003
Posts: 7,474
Quote:
Originally Posted by prokowave View Post
Managed to snag a few right as they were bringing in a second crane. Pilings are on site and moving full speed ahead:


Awesome.. thanks for the pics! looks like this will be a nice addition to the area!
Reply With Quote
     
     
  #13469  
Old Posted Jan 22, 2018, 9:35 PM
jjslonaker jjslonaker is offline
NOLA Razorback
 
Join Date: Jan 2012
Location: New Orleans, LA
Posts: 457
Quote:
Originally Posted by tennis1400 View Post
Awesome.. thanks for the pics! looks like this will be a nice addition to the area!
What's going in here again?
Reply With Quote
     
     
  #13470  
Old Posted Jan 22, 2018, 10:46 PM
Chris from N.O.'s Avatar
Chris from N.O. Chris from N.O. is offline
Registered User
 
Join Date: Feb 2011
Posts: 581
Quote:
Originally Posted by jjslonaker View Post
What's going in here again?
This (first time I've seen the website): https://parkwaynola.com

Edit: oops looks like a lot of broken links on the site, but it will give you some idea. Called "the parkway," should be searchable for this thread
Reply With Quote
     
     
  #13471  
Old Posted Jan 22, 2018, 11:07 PM
tennis1400 tennis1400 is offline
-
 
Join Date: Aug 2003
Posts: 7,474




Reply With Quote
     
     
  #13472  
Old Posted Jan 23, 2018, 1:48 PM
nolafan nolafan is offline
Registered User
 
Join Date: Mar 2016
Location: New Orleans
Posts: 246
I really wish they could've done something different with this design. This is not a great looking project.
Reply With Quote
     
     
  #13473  
Old Posted Jan 23, 2018, 2:42 PM
tennis1400 tennis1400 is offline
-
 
Join Date: Aug 2003
Posts: 7,474
Quote:
Originally Posted by nolafan View Post
I really wish they could've done something different with this design. This is not a great looking project.
I think its decent infill for the area ... not going to win any awards but i dont hate it personally
Reply With Quote
     
     
  #13474  
Old Posted Jan 23, 2018, 8:04 PM
cnolae16 cnolae16 is offline
Registered User
 
Join Date: Jun 2016
Posts: 39
Quote:
Originally Posted by tennis1400 View Post
I think its decent infill for the area ... not going to win any awards but i dont hate it personally
It looks like they fixed their links.

I think they are pushing green and sustainable design. There aren't many materials in this rendering that look like they will need to be constantly replaced.

This is going to be a good option for people looking for downtown luxury but who don't want downtown rates.
Reply With Quote
     
     
  #13475  
Old Posted Jan 23, 2018, 8:05 PM
cnolae16 cnolae16 is offline
Registered User
 
Join Date: Jun 2016
Posts: 39
green building

Quote:
Originally Posted by tennis1400 View Post
I think its decent infill for the area ... not going to win any awards but i dont hate it personally
It looks like they fixed their links.

I think they are pushing green and sustainable design. There aren't many materials in this rendering that look like they will need to be constantly replaced.

This is going to be a good option for people looking for downtown luxury but who don't want downtown rates.
Reply With Quote
     
     
  #13476  
Old Posted Jan 23, 2018, 8:17 PM
tennis1400 tennis1400 is offline
-
 
Join Date: Aug 2003
Posts: 7,474
Quote:
Originally Posted by cnolae16 View Post
It looks like they fixed their links.

I think they are pushing green and sustainable design. There aren't many materials in this rendering that look like they will need to be constantly replaced.

This is going to be a good option for people looking for downtown luxury but who don't want downtown rates.
yes and it should be appealing to students at Xavier.. which is a few blocks away
Reply With Quote
     
     
  #13477  
Old Posted Jan 23, 2018, 9:21 PM
Tchoupitoulas Tchoupitoulas is offline
Registered User
 
Join Date: May 2015
Location: New Orleans
Posts: 70
MSY breaks another passenger record

Quote:
Another year, another record at Louis Armstrong International Airport.

Total passengers for the airport in 2017 finished at 12,009,512, surpassing the previous record of about 11.1 million the year before.

It was the seventh consecutive year of passenger growth, with a 35 percent increase since 2010, according to a release.
Link
Reply With Quote
     
     
  #13478  
Old Posted Jan 23, 2018, 9:26 PM
tennis1400 tennis1400 is offline
-
 
Join Date: Aug 2003
Posts: 7,474
djsnola
4230/32 Marigny St·Demolition ·Ref Code: VAQQPG
Pay Fees Download (6) Print Summary Submit Add to Watch List
Type:
Demolition
Applicant:
Joseph Prier
Status:
Application Review
Date Filed:
1/23/2018
Closed:
No
Description
Total demolition of Union Hall. Plans to follow.


djsnola
1300 Canal St·Sidewalk Repair ·Ref Code: Q2T3KC
Print Summary Submit Add to Watch List
Type:
Sidewalk Repair
Applicant:
Insite New Orleans One LLC
Status:
Draft Application
Date Filed:
1/23/2018
Closed:
No
Description
Repair sidewalk on saratoga St as per drawing


djsnola
1527 Basin St·Renovation (Non-Structural) ·Ref Code: CYJF6E
Download (2) Print Summary Submit Add to Watch List
Type:
Renovation (Non-Structural)
Applicant:
Victor Mature Gant Jr
Status:
Application Review
Date Filed:
1/23/2018
Closed:
No
Description
Non-structural exterior repairs to vacant mixed-use building structure (1-Commercial Unit -1527 Basin St, 1st floor and 3-Residential Untis - 2nd floor -1529, 1,2,&3). Exterior repairs include siding and masonry repair, weatherboards, new roof, stairways, handrails and guardrails, decorative features, windows. No interior work under this permit. No demolition of any walls.




1615 Poydras St, Floors 14, 15, 19, & 23·Interior Demolition · Permit #18-00996-DEMI ·Ref Code: MW6KR3
Download (5) Print Summary Submit Add to Watch List
Type:
Interior Demolition
Applicant:
DXC Technology Services, LLC
Status:
Permit Issued
Date Filed:
1/9/2018
Closed:
No
Description
Interior demolition of existing office space on floors 14, 15, 19, and 23 (kitchen and exhust fan removal on 23 not included in this scope) in the building per the attached plans. Proposed use will be vacant space. Permit for build out of gutted space to offices expected by February 2018.






Reply With Quote
     
     
  #13479  
Old Posted Jan 23, 2018, 9:28 PM
tennis1400 tennis1400 is offline
-
 
Join Date: Aug 2003
Posts: 7,474




















Reply With Quote
     
     
  #13480  
Old Posted Jan 23, 2018, 9:29 PM
tennis1400 tennis1400 is offline
-
 
Join Date: Aug 2003
Posts: 7,474
Carondelet Street Properties Sold to Investment Fund




http://canalstreetbeat.com/carondele...vestment-fund/
Reply With Quote
     
     
This discussion thread continues

Use the page links to the lower-right to go to the next page for additional posts
 
 
Reply

Go Back   SkyscraperPage Forum > Global Projects & Construction > City Compilations
Forum Jump



Forum Jump


All times are GMT. The time now is 10:05 PM.

     
SkyscraperPage.com - Archive - Privacy Statement - Top

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2024, vBulletin Solutions, Inc.