Quote:
Originally Posted by Future Mayor
Yes eventually FrontRunner will extend all the way to Nephi, however currently the southern expansion is slated to end in Payson and has an actual time table for completion.
P.S. I realized I spelled Santaquin incorrectly in my post after I posted it but didn't care enough to go back and change the spelling figuring that everyone would get the point. BTW there are spelling errors all over this board, so don't worry about fixing them all in your replies.
|
Well, I doubt Nephi will get the Front Runner extension in the same wave Payson does, but I think it's still too early to count Santaquin out. If you look at the Mid-Jordan TRAX line and how UTA is planning ahead for a projected population expansion (with some stops in the middle of nowhere), I don't think it is too far of a stretch to say that come the 10 plus years or so when Payson is continuing to grow and Santaquin right behind it, that UTA would see it fit to lay track in an area with anticipation of many future new costumers. There is a big difference in distance between of Payson to Santaquin and Santaquin to Nephi.
But yes, there is much that needs to happen in Santaquin first, like building a grocery store.
P.S. I'm no spelling expert and commit many errors myself without it causing me the pain of a guilty conscience, but coming from a person with Payson connections, it seems only natural to interpret the repeated misspelling of Santaquin as a possible dis
.