  #1161  
Old Posted Jan 3, 2018, 4:15 PM
roger1818 roger1818 is online now
Registered User
 
Join Date: Feb 2016
Location: Stittsville, ON
Posts: 1,750
Quote:
Originally Posted by zzptichka View Post
So they just opened this separate BRT link from Bayshore to Moodie 2 weeks ago and as it turns out drivers mistake it for a highway ramp at Holy Acres and turn into it even though there are all kinds of signs telling them not to.
Now they have a special constable sitting there with lights on every day. Good planning :slow_clap:
The on-ramp at Holy Acres is still open isn't it? From what I can tell it looks like it is intermediately to the left of the transitway, which certainly would be confusing as people aren't used to driving to the left of oncoming traffic. Being winter doesn't help as paint on the road is often covered with salt and snow.

They should move the intersection for the on-ramp about 30 or 40 m to the south-east to provide more of a barrier between the on-ramp and the busway.
Reply With Quote
     
     
  #1162  
Old Posted Jan 3, 2018, 4:34 PM
J.OT13's Avatar
J.OT13 J.OT13 is offline
Registered User
 
Join Date: Mar 2012
Location: Ottawa
Posts: 5,876
Luckily, the 40 million dollar Transitway extension will be closed and demolished in 2 years.
Reply With Quote
     
     
  #1163  
Old Posted Jan 3, 2018, 5:55 PM
roger1818 roger1818 is online now
Registered User
 
Join Date: Feb 2016
Location: Stittsville, ON
Posts: 1,750
Quote:
Originally Posted by J.OT13 View Post
Luckily, the 40 million dollar Transitway extension will be closed and demolished in 2 years.
It will be a bit more than 2 years and it won't be demolished. Construction for the western extension starts in 2020 (fall I think), but most of the initial development will be the tunnels. I'm guessing they won't need to take the new busway out of commission until late 2021 or early 2022, so in about 4 years.

Most of the money spent will be a direct savings for the LRT extension. I suspect most of the cost was for the overpass, and that will still be necessary for LRT, as will the sound barriers. Only the asphalt and temporary bus shelters (and maybe a bit of ground prep near Holly Acres, where they will be grade separating) will need to be removed, and those don't cost much.
Reply With Quote
     
     
  #1164  
Old Posted Jan 3, 2018, 5:56 PM
kmcamp kmcamp is offline
Registered User
 
Join Date: Sep 2016
Posts: 221
Quote:
Originally Posted by roger1818 View Post
It will be a bit more than 2 years and it won't be demolished. Construction for the western extension starts in 2020 (fall I think), but most of the initial development will be the tunnels. I'm guessing they won't need to take the new busway out of commission until late 2021 or early 2022, so in about 4 years.

Most of the money spent will be a direct savings for the LRT extension. I suspect most of the cost was for the overpass, and that will still be necessary for LRT. Only the asphalt and temporary bus shelters (and maybe a bit of ground prep near Holly Acres, where they will be grade separating) will need to be removed, and those don't cost much.
I noticed that the actual station didn't match the rendering. I'm quite glad they had some sense and only threw up a temporary station rather then one they'd have to demolish.
Reply With Quote
     
     
  #1165  
Old Posted Jan 3, 2018, 6:03 PM
J.OT13's Avatar
J.OT13 J.OT13 is offline
Registered User
 
Join Date: Mar 2012
Location: Ottawa
Posts: 5,876
I would need to check out the extension in person, but I'm sure that if we calculate the asphalt, the extra width built to accommodate buses vs trains, bus shelters, different draining and lighting needs, building and demolishing part of the Transitway where grade separation will be needed for lrt... it will end up costing us 20 to 30 million more than going straight to lrt. No matter how we look at it, building a Transitway, shutting it down 2-3 years later and converting it to rail is more expensive than building rail in the first place.

The Moodie O-Train extension was predictable. No reason why the City wasted 40 million dollars on an interim bus corridor that wasn't needed.

Last edited by J.OT13; Jan 3, 2018 at 9:05 PM.
Reply With Quote
     
     
  #1166  
Old Posted Jan 16, 2018, 1:51 PM
PHrenetic PHrenetic is offline
Registered User
 
Join Date: Jun 2016
Location: Ottawa
Posts: 255
Good Day.

Notice of Completion and EPR posted on City of Ottawa :

https://ottawa.ca/en/bayshore-moodie...-assessment-ea

Go down to the last heading.
Caution - 196 pages in the main document.

EnJoy!
Reply With Quote
     
     
  #1167  
Old Posted Jan 18, 2018, 2:19 PM
zzptichka zzptichka is offline
Registered User
 
Join Date: Dec 2015
Posts: 509
Quote:
Originally Posted by zzptichka View Post
So they just opened this separate BRT link from Bayshore to Moodie 2 weeks ago and as it turns out drivers mistake it for a highway ramp at Holy Acres and turn into it even though there are all kinds of signs telling them not to.
Now they have a special constable sitting there with lights on every day. Good planning :slow_clap:

2 weeks later we have two new signs and one more constable

Reply With Quote
     
     
  #1168  
Old Posted Jan 18, 2018, 2:42 PM
roger1818 roger1818 is online now
Registered User
 
Join Date: Feb 2016
Location: Stittsville, ON
Posts: 1,750
Quote:
Originally Posted by zzptichka View Post
2 weeks later we have two new signs and one more constable

Even with the new signs that is a very awkward looking intersection. No surprise there is confusion.
Reply With Quote
     
     
  #1169  
Old Posted Yesterday, 12:37 AM
waterloowarrior's Avatar
waterloowarrior waterloowarrior is offline
National Capital Region
 
Join Date: Nov 2005
Location: Eastern Ontario
Posts: 8,150


That is awkward. All of a driver's training and experience will tell them to keep right of a median when turning onto a road. As part of the decision to go ahead with Stage 2, grade separation at Holy Acres was deferred, which does make sense but it will be awkward for a while. The LRT will be built closer to the 417.

the traffic memo speaks to some of the anticipated impacts from DND.
http://documents.ottawa.ca/sites/doc...fic%20Memo.pdf
Reply With Quote
     
     
  #1170  
Old Posted Yesterday, 3:45 PM
PHrenetic PHrenetic is offline
Registered User
 
Join Date: Jun 2016
Location: Ottawa
Posts: 255
Good Day.

OK, so, the reason I first joined the forum was to comment on the platform size I noted when the plans came out for New Orchard, Cleary, and others, that the 90 metre platforms construction size was being continued (no problem, per se, for the present), but that the protection for future expansion was only to 100 metres in most, if not all, Stage 2 stations - not 120 metres as in Stage 1 stations.
Well..... they are continuing that lesser protection, only 100 metre protection, in the EPR for Moodie LRT station (pg.67 (Page 53)). This is now virtually immortalizing the standard in stone, which severely restricts future capacity growth by merely adding an 11 metre segment to each vehicle (easily done, and within the capability of the vehicles, as a design feature) along with adding the 30 metres in add-on construction.
( IE. the 48 metre vehicle becomes 59 metres long, for a two vehicle train of 118 metres, and the platfoms grow from 90 to 120 metres)
Is this a furthur sign of cheaping out now on the part of the City (read Photo-Op Jim), to the detriment of the future ? Paranoid me says yes ! <groan / sigh>

NoJoy!
Reply With Quote
     
     
  #1171  
Old Posted Yesterday, 6:40 PM
1overcosc's Avatar
1overcosc 1overcosc is online now
Registered User
 
Join Date: Jun 2013
Location: Kingston, Ontario
Posts: 8,334
100m should be just enough for the ultimate design, actually.

The final length of the trains (once they enlarge them to their maximum length later on) is 59m, or 118m coupled. I took a close look at the diagram of the trains and measured the pixel lengths between the farthest two doors. Assuming the diagram is to scale, on the full 118m train design, at each end there is 10 metres between the farthest part of the door and the head/tail of the train, so the "door span" is only 98 metres total. So with automated braking, 100m is just enough space for all the doors to be accessible from the platform.

My guess is that the reason why the Phase 1 stations were designed to be protected for 120m lengths was because they didn't yet know the design of the trains (that being for the consortium to decide later), so went above to be cautious. Now that they know that 98m is sufficient, Phase 2 is being designed with only 100m of ultimate space.

The 118m train design (or 98m doorspan) has a capacity of 740 passengers per train. With a maximum headway of 90s, they could accommodate about 30,000 passengers per hour total, or nearly three times the initial peak period ridership. If the city's population grows by 1% a year (as it has for most of our history), even if Confederation Line's ridership growth is, say, two times faster than the city's overall growth, we wouldn't hit capacity until the 2060s. If ridership grows around the same rate as the city's population, it won't hit capacity until well into the 22nd century.
Reply With Quote
     
     
  #1172  
Old Posted Yesterday, 6:53 PM
PHrenetic PHrenetic is offline
Registered User
 
Join Date: Jun 2016
Location: Ottawa
Posts: 255
Good Day.

You're a better pixcellator than I, Gunga Din !

My best estimates had the current 90 metre platforms comfortably ( just ) accommodating the current 96 metre trains, door-to-door.

We shall see. Thx.
Reply With Quote
     
     
End
 
 
Reply

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Ontario > Ottawa-Gatineau > Transportation
Forum Jump


Thread Tools
Display Modes

Forum Jump


All times are GMT. The time now is 3:27 AM.

     

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2018, vBulletin Solutions, Inc.