Old Posted Feb 8, 2012, 3:23 PM
Davis137's Avatar
Davis137 Davis137 is offline
Registered User
 
Join Date: Aug 2008
Posts: 2,290
Upto the 6th floor now, and it already makes the surrounding buildings (other than Terraces) look tiny...
Reply With Quote
     
     
  #62  
Old Posted Feb 11, 2012, 4:24 PM
harls's Avatar
harls harls is offline
Mooderator
 
Join Date: Jan 2002
Location: Aylmer, Québec
Posts: 19,670
11 feb. 2012



from the webcam.
Reply With Quote
     
     
  #63  
Old Posted Feb 11, 2012, 6:30 PM
S-Man S-Man is offline
Registered User
 
Join Date: Mar 2011
Posts: 1,639
With this built and the Cartier-Wellington up (I hear sales are at 60%), downton Hull will look less patchy and more urban.
Reply With Quote
     
     
  #64  
Old Posted Mar 2, 2012, 4:47 AM
Snowpatrol Snowpatrol is offline
Registered User
 
Join Date: Jan 2011
Location: Gatineau
Posts: 12
Night View of Web Cam



Taken on Mar.1, 2011 at 11:55pm. I can see this building from my window. I thought a Night Pic of the web cam would be a cool change. Sure looks well lit up at night.
Reply With Quote
     
     
  #65  
Old Posted Mar 2, 2012, 3:51 PM
Davis137's Avatar
Davis137 Davis137 is offline
Registered User
 
Join Date: Aug 2008
Posts: 2,290
I like how big this building is getting now...Once at full height, it should look pretty good when observed from the Chaudiere bridge...or the War Museum...
Reply With Quote
     
     
  #66  
Old Posted Mar 14, 2012, 2:38 AM
Snowpatrol Snowpatrol is offline
Registered User
 
Join Date: Jan 2011
Location: Gatineau
Posts: 12
10 floors high, 5 to go

Holy crap! Is this thing ever getting big. I counted the floors today, 10! That means 5 more floors left. Should be maxed out by June, I hope.
Reply With Quote
     
     
  #67  
Old Posted Mar 14, 2012, 5:42 PM
Radster Radster is offline
Registered User
 
Join Date: Oct 2007
Location: Chelsea
Posts: 997
Quote:
Originally Posted by Snowpatrol View Post
Holy crap! Is this thing ever getting big. I counted the floors today, 10! That means 5 more floors left. Should be maxed out by June, I hope.
I can see this building from my office on Portage, since mid-February they are averaging about 1 floor every 1.5 weeks, so if they have 5 floors left, they will be topped out by the end of April, or 1st week of May.
Reply With Quote
     
     
  #68  
Old Posted Mar 24, 2012, 11:42 PM
rocketphish's Avatar
rocketphish rocketphish is offline
Planet Ottawa and beyond
 
Join Date: Feb 2009
Location: Ottawa
Posts: 12,279
from southfacing, March 18, 2012:

Reply With Quote
     
     
  #69  
Old Posted Mar 28, 2012, 11:40 AM
harls's Avatar
harls harls is offline
Mooderator
 
Join Date: Jan 2002
Location: Aylmer, Québec
Posts: 19,670
All it needs is a mast and a big pirate flag.
Reply With Quote
     
     
  #70  
Old Posted Mar 28, 2012, 8:55 PM
Davis137's Avatar
Davis137 Davis137 is offline
Registered User
 
Join Date: Aug 2008
Posts: 2,290
Looks like it's at the 11th or 12th floor by the webcam shots of today...
Reply With Quote
     
     
  #71  
Old Posted Apr 6, 2012, 7:30 PM
harls's Avatar
harls harls is offline
Mooderator
 
Join Date: Jan 2002
Location: Aylmer, Québec
Posts: 19,670
4 april 2012

Here is a shot from rue Ste. Bernadette last Wednesday. What happened to that pine tree, I dunno.

Reply With Quote
     
     
  #72  
Old Posted Apr 9, 2012, 12:23 AM
Davis137's Avatar
Davis137 Davis137 is offline
Registered User
 
Join Date: Aug 2008
Posts: 2,290
Getting up there now...looks like they are doing the setback for the thinner top section of the building.
Reply With Quote
     
     
  #73  
Old Posted Apr 11, 2012, 7:32 PM
Davis137's Avatar
Davis137 Davis137 is offline
Registered User
 
Join Date: Aug 2008
Posts: 2,290
Looks like there are only 2 floors left to go now...
Reply With Quote
     
     
  #74  
Old Posted Apr 11, 2012, 7:51 PM
McC's Avatar
McC McC is offline
Registered User
 
Join Date: Apr 2010
Posts: 3,057
Quote:
Originally Posted by Davis137 View Post
Looks like there are only 2 floors left to go now...
and then "all aboard...!"
Reply With Quote
     
     
  #75  
Old Posted Apr 12, 2012, 7:14 PM
FiereSansVoiture's Avatar
FiereSansVoiture FiereSansVoiture is offline
Registered User
 
Join Date: Oct 2011
Location: Gatineau
Posts: 95
I don't know if there are any federal office building U/C in Ottawa but why did the conservative government build 4 new office buildings in Gatineau (22, rue Eddy, 455 Carrière Boulevard, 30 Victoria Street and annexe Vincent-Massé) if they were going to cut approx 7000 jobs (http://www.radio-canada.ca/regions/o...unicipal.shtml)
Reply With Quote
     
     
  #76  
Old Posted Apr 12, 2012, 7:31 PM
McC's Avatar
McC McC is offline
Registered User
 
Join Date: Apr 2010
Posts: 3,057
a couple of reasons to consider: these were different decisions made at different times, for one. For another, many buildings currently occupied by the federal government (not necessarily federal buildings) are due for major mid-life renovations and in some cases this could mean completely emptying some very large office buildings (e.g., L'Esplannade Laurier), and PWGSC identified an ongoing need for significant new office space to basically just be used as swing space for a number of years as these rehab projects are cycled through.
Reply With Quote
     
     
  #77  
Old Posted Apr 12, 2012, 8:06 PM
Acajack's Avatar
Acajack Acajack is offline
Unapologetic Occidental
 
Join Date: Aug 2006
Location: Province 2, Canadian Empire
Posts: 68,053
Quote:
Originally Posted by McC View Post
a couple of reasons to consider: these were different decisions made at different times, for one. For another, many buildings currently occupied by the federal government (not necessarily federal buildings) are due for major mid-life renovations and in some cases this could mean completely emptying some very large office buildings (e.g., L'Esplannade Laurier), and PWGSC identified an ongoing need for significant new office space to basically just be used as swing space for a number of years as these rehab projects are cycled through.
Yeah, I think there is a regular cycle in their real estate portfolio: there are always a number older buildings that have to be vacated for renovations, and you have to put those people somewhere for a period, and this cycle is recurring.
Reply With Quote
     
     
  #78  
Old Posted Apr 12, 2012, 9:40 PM
J.OT13's Avatar
J.OT13 J.OT13 is offline
Moderator
 
Join Date: Mar 2012
Location: Ottawa
Posts: 23,983
Are there federal office buildings U/C in Ottawa; yes,
-the new EDC (535,000SqFt has recently been completed)
-new building on Terminal Avenue (roughly 200,000 SqFt)
-Lorne Building replacement at 90 Elgin (roughly 700,000SqFt)

-150 Elgin (roughly 350,000 SqFt) is NOT being built for Federal purposes

Gatineau U/C

About 2,000,000 SqFt of federaly purposed buildings U/C

Why Gatineau? Cheaper construction, cheaper rent and since the Trudeau gouverment, Federal Jobs must be split 75/25 between Ottawa and Gatineau.
Reply With Quote
     
     
  #79  
Old Posted Apr 12, 2012, 10:36 PM
Cre47's Avatar
Cre47 Cre47 is offline
Awesome!
 
Join Date: Mar 2006
Location: Orleans, ON
Posts: 1,971
On top of those already mentionned, there's the massive complex off Ogilvie Rd
__________________
"However, the Leafs have not won the Cup since 1967, giving them the longest-active Cup drought in the NHL, and thus are the only Original Six team that has not won the Cup since the 1967 NHL expansion." Favorite phrase on the Toronto Maple Leafs Wikipedia page.
Reply With Quote
     
     
  #80  
Old Posted Apr 12, 2012, 11:47 PM
J.OT13's Avatar
J.OT13 J.OT13 is offline
Moderator
 
Join Date: Mar 2012
Location: Ottawa
Posts: 23,983
By Cre47
Quote:
On top of those already mentionned, there's the massive complex off Ogilvie Rd
Thanks, I forgot about that one.
Reply With Quote
     
     
This discussion thread continues

Use the page links to the lower-right to go to the next page for additional posts
 
 
Reply

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Ontario > Ottawa-Gatineau > Downtown & City of Ottawa
Forum Jump


Thread Tools
Display Modes

Forum Jump


All times are GMT. The time now is 5:51 AM.

     
SkyscraperPage.com - Archive - Privacy Statement - Top

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2024, vBulletin Solutions, Inc.