HomeDiagramsDatabaseMapsForum About
     

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Ontario > Ottawa-Gatineau > Downtown & City of Ottawa


Reply

 
Thread Tools Display Modes
     
     
  #81  
Old Posted Jun 15, 2011, 1:40 AM
ServiceGuy ServiceGuy is offline
Registered User
 
Join Date: Dec 2009
Posts: 303
A few new photos from today. Second level (from the bottom) parking slab has been poured.





Reply With Quote
     
     
  #82  
Old Posted Jun 15, 2011, 7:40 PM
Davis137's Avatar
Davis137 Davis137 is offline
Registered User
 
Join Date: Aug 2008
Posts: 2,290
Wow, didn't realize there was this amount of progress already!
Reply With Quote
     
     
  #83  
Old Posted Jul 8, 2011, 1:06 AM
waterloowarrior's Avatar
waterloowarrior waterloowarrior is offline
National Capital Region
 
Join Date: Nov 2005
Location: Eastern Ontario
Posts: 9,243
webcam (doesn't seem to work for me tho)
http://www.richcraft.com/galleria2/webcam.html
Reply With Quote
     
     
  #84  
Old Posted Jul 30, 2011, 11:06 AM
ServiceGuy ServiceGuy is offline
Registered User
 
Join Date: Dec 2009
Posts: 303
Workers are now at street level on the Besserer side of the building.






Reply With Quote
     
     
  #85  
Old Posted Aug 1, 2011, 3:35 AM
Davis137's Avatar
Davis137 Davis137 is offline
Registered User
 
Join Date: Aug 2008
Posts: 2,290
Wow, at grade on one side of the building, with part of the 1st floor being framed already...nice progress...
Reply With Quote
     
     
  #86  
Old Posted Sep 9, 2011, 2:29 PM
amanfromnowhere's Avatar
amanfromnowhere amanfromnowhere is offline
Registered User
 
Join Date: Jul 2007
Location: Ottawa/Stockholm
Posts: 367
Quote:
Originally Posted by waterloowarrior View Post
webcam (doesn't seem to work for me tho)
http://www.richcraft.com/galleria2/webcam.html
looks like it works! at least for me...
Reply With Quote
     
     
  #87  
Old Posted Sep 13, 2011, 11:16 PM
ServiceGuy ServiceGuy is offline
Registered User
 
Join Date: Dec 2009
Posts: 303
Forms are being set up for the second floor but it seems to be a long process. I'm guessing it's because this is the floor where the split-level slab disappears and all becomes one.


Reply With Quote
     
     
  #88  
Old Posted Oct 26, 2011, 12:18 PM
Davis137's Avatar
Davis137 Davis137 is offline
Registered User
 
Join Date: Aug 2008
Posts: 2,290
I Can't be too sure, but I think this building is currently upto it's 3rd or 4th floor above grade, as I can see it from my office now, level with some of the other buildings around it, and looking like it's going to be half the height of Galleria Ph1 in a couple of weeks...
Reply With Quote
     
     
  #89  
Old Posted Oct 26, 2011, 11:21 PM
ServiceGuy ServiceGuy is offline
Registered User
 
Join Date: Dec 2009
Posts: 303
They just started laying out the forms for the 6th floor slab today. Looks like they are finally high enough to clear all hydro wires and are switching to flying forms to speed things up.
Reply With Quote
     
     
  #90  
Old Posted Nov 6, 2011, 8:57 PM
alphachap alphachap is offline
Registered User
 
Join Date: Mar 2011
Posts: 19
Still going up

taken 2011-11-06



Reply With Quote
     
     
  #91  
Old Posted Nov 7, 2011, 2:12 PM
amanfromnowhere's Avatar
amanfromnowhere amanfromnowhere is offline
Registered User
 
Join Date: Jul 2007
Location: Ottawa/Stockholm
Posts: 367
looking at the progress for this building I must say that Richcraft is the fastest developer in Ottawa (specially comparing with Broccolini and its 22 Eddy )
Reply With Quote
     
     
  #92  
Old Posted Nov 7, 2011, 2:41 PM
Davis137's Avatar
Davis137 Davis137 is offline
Registered User
 
Join Date: Aug 2008
Posts: 2,290
This one is going up fast, I can see it from my office now without issue...
Reply With Quote
     
     
  #93  
Old Posted Jan 10, 2012, 7:27 PM
Davis137's Avatar
Davis137 Davis137 is offline
Registered User
 
Join Date: Aug 2008
Posts: 2,290
It's now at the same height and floor count as Galleria 1, and the forms are going up for the next floor as of this afternoon...
Reply With Quote
     
     
  #94  
Old Posted Jan 16, 2012, 3:28 PM
Davis137's Avatar
Davis137 Davis137 is offline
Registered User
 
Join Date: Aug 2008
Posts: 2,290
The next floor is almost done...I think that leaves 1 more to go until it's almost topped out...
Reply With Quote
     
     
  #95  
Old Posted Jan 16, 2012, 11:12 PM
mrarlyn's Avatar
mrarlyn mrarlyn is offline
Registered User
 
Join Date: Jun 2008
Location: Ottawa
Posts: 6
Good to see some density

I live just south of here and can just see the top of the new building over my neighbour to the north. It's good to see some density in the area.

I'm disappointed to see the semi-hijacking of this thread to talk about teh center 454 debate. But now that it's here I want to throw my vote on the pro 454 side. I've lived in the area for six years and not once have I had an issue. Maybe the people who live there should make the effort to get to know the "locals" rather than pick a public fight.
__________________
Have you built my subway yet?
Reply With Quote
     
     
  #96  
Old Posted Jan 17, 2012, 3:27 AM
S-Man S-Man is offline
Registered User
 
Join Date: Mar 2011
Posts: 1,639
Agreed, though haven't heard much at all about the issue since that flurry of activity a while back. Not sure what the outcome was.
Reply With Quote
     
     
  #97  
Old Posted Feb 8, 2012, 2:47 PM
Davis137's Avatar
Davis137 Davis137 is offline
Registered User
 
Join Date: Aug 2008
Posts: 2,290
Looks like it's up to the 14th floor now, with only mechanical left to go... I can say, from where I can can see it during the day, I kinda wish they had built this thing 2-6 floors taller, as it would still blend nicely with the neighbourhood, and block sight lines of some not-so great buildings in Sandy Hill and Rideau...
Reply With Quote
     
     
  #98  
Old Posted Feb 8, 2012, 6:30 PM
McKellarDweller's Avatar
McKellarDweller McKellarDweller is offline
inner city
 
Join Date: Feb 2012
Location: Calgary/Ottawa
Posts: 475
Just drove by this for the first time in a few weeks. I know the bottom few floors were probably snapped up by investors, but wow, I can't imagine the noise and uninspiring views the north and east facing lower units must have. Those on the lower north side would perpetually have dismal natural light.

To each his/her own!
Reply With Quote
     
     
  #99  
Old Posted Feb 9, 2012, 2:01 AM
drawarc's Avatar
drawarc drawarc is offline
Registered User
 
Join Date: Jul 2001
Posts: 471
Pic taken February 7th:


Photo by me.
Reply With Quote
     
     
  #100  
Old Posted Feb 9, 2012, 4:01 PM
amanfromnowhere's Avatar
amanfromnowhere amanfromnowhere is offline
Registered User
 
Join Date: Jul 2007
Location: Ottawa/Stockholm
Posts: 367
this building definitely needs additional 3-4 floors
Reply With Quote
     
     
This discussion thread continues

Use the page links to the lower-right to go to the next page for additional posts
 
 
Reply

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Ontario > Ottawa-Gatineau > Downtown & City of Ottawa
Forum Jump


Thread Tools
Display Modes

Forum Jump


All times are GMT. The time now is 9:52 AM.

     
SkyscraperPage.com - Archive - Privacy Statement - Top

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2024, vBulletin Solutions, Inc.