Old Posted Mar 31, 2021, 7:54 PM
SL123 SL123 is offline
Registered User
 
Join Date: Mar 2021
Posts: 1,378
Quote:
Originally Posted by J.OT13 View Post
Another "meh" RLA design, but good scale and proportions. Seems relatively easy to build with quality materials. Ground level townhome units will liven up the street and make it feel safer. As a shorter background building, the plain design isn't too much of an issue.
I think the design is quite good for a building that is on a side street with no frontage on a main street.
Reply With Quote
     
     
  #82  
Old Posted Mar 31, 2021, 8:04 PM
TransitZilla TransitZilla is offline
Registered User
 
Join Date: Dec 2006
Posts: 2,739
Quote:
Originally Posted by J.OT13 View Post
Ground level townhome units will liven up the street and make it feel safer.
Not sure about that one. It doesn't appear that the doors to the outside are the "primary" entrances to those units. It would be better if those units were actual 2-storey units with no entrance from the corridor. It would ensure the doors to the outside are maintained.
Reply With Quote
     
     
  #83  
Old Posted Mar 31, 2021, 8:36 PM
J.OT13's Avatar
J.OT13 J.OT13 is offline
Moderator
 
Join Date: Mar 2012
Location: Ottawa
Posts: 24,024
Quote:
Originally Posted by bradnixon View Post
Not sure about that one. It doesn't appear that the doors to the outside are the "primary" entrances to those units. It would be better if those units were actual 2-storey units with no entrance from the corridor. It would ensure the doors to the outside are maintained.
Agreed.
Reply With Quote
     
     
  #84  
Old Posted Nov 2, 2021, 12:52 AM
rocketphish's Avatar
rocketphish rocketphish is offline
Planet Ottawa and beyond
 
Join Date: Feb 2009
Location: Ottawa
Posts: 12,335
I found a couple of higher-quality renderings in the UDRP Formal Review, May 7th, 2021.





http://webcast.ottawa.ca/plan/All_Im...May%202021.PDF
Reply With Quote
     
     
  #85  
Old Posted Nov 2, 2021, 1:05 AM
SL123 SL123 is offline
Registered User
 
Join Date: Mar 2021
Posts: 1,378
Wow this is so underwhelming
Reply With Quote
     
     
  #86  
Old Posted Nov 2, 2021, 1:15 AM
bartlebooth bartlebooth is offline
Registered User
 
Join Date: Dec 2010
Posts: 441
Awful.
Reply With Quote
     
     
  #87  
Old Posted Nov 2, 2021, 1:29 AM
GeoNerd GeoNerd is offline
Registered User
 
Join Date: May 2010
Location: Ottawa, ON.
Posts: 486
Taggart creates excruciatingly boring buildings. Hire a decent architect!
Reply With Quote
     
     
  #88  
Old Posted Nov 2, 2021, 12:59 PM
J.OT13's Avatar
J.OT13 J.OT13 is offline
Moderator
 
Join Date: Mar 2012
Location: Ottawa
Posts: 24,024
I'm not hating this, and here's why. The area is a hot bed for well designed (if not always well executed) flashy (by Ottawa standards) towers. Having one plain project is not the worse thing. Not competing with the rest. Possibly more affordable prices.

Good height for the area. Doors to the street. Decent addition to a fast densifying area.
Reply With Quote
     
     
  #89  
Old Posted Nov 2, 2021, 2:59 PM
Dzingle Bells Dzingle Bells is offline
Registered User
 
Join Date: Feb 2019
Posts: 158
I agree with J.OT13. I don't hate this. Great density for the neighbourhood that will hopefully slowly transition away from single-family homes.

I don't think they are doing themselves any favours with the colour of the bricks though. Maybe it's just how it is showing up in the renderings but it needs some work. Also, the patchwork application of the different brick colours is not good.

Would love if the ground units were two floors, maybe you could get some three bedrooms in them. Would make this building an option to more families.
Reply With Quote
     
     
  #90  
Old Posted Jan 25, 2022, 9:09 PM
Marcus CLS Marcus CLS is offline
Registered User
 
Join Date: Nov 2007
Posts: 338
Site preparation for construction has started. Today some Snow removal. Barrier fencing delivered. Site plan was appoved back in November 2021.
Reply With Quote
     
     
  #91  
Old Posted Feb 10, 2022, 7:55 PM
vtecyo vtecyo is offline
Registered User
 
Join Date: Feb 2015
Posts: 236
They've started driving in pilings around the perimeter of the site. I assume excavation could start before the end of the winter.
Reply With Quote
     
     
  #92  
Old Posted Apr 4, 2022, 3:27 AM
Harley613's Avatar
Harley613 Harley613 is offline
Registered User
 
Join Date: Jun 2009
Location: Aylmer, QC
Posts: 6,662
Excavation well under way now!
__________________
Instagram: https://www.instagram.com/the.harleydavis/
Reply With Quote
     
     
  #93  
Old Posted May 27, 2022, 5:33 PM
UrbOttawa UrbOttawa is offline
Registered User
 
Join Date: Oct 2014
Posts: 412
Reply With Quote
     
     
  #94  
Old Posted May 28, 2022, 1:36 AM
J.OT13's Avatar
J.OT13 J.OT13 is offline
Moderator
 
Join Date: Mar 2012
Location: Ottawa
Posts: 24,024
Quote:
Originally Posted by UrbOttawa View Post
Reply With Quote
     
     
  #95  
Old Posted May 28, 2022, 2:37 PM
SL123 SL123 is offline
Registered User
 
Join Date: Mar 2021
Posts: 1,378
thats one of the better rendering of this project. it gives me some hope
Reply With Quote
     
     
  #96  
Old Posted Jun 20, 2022, 9:56 PM
Harley613's Avatar
Harley613 Harley613 is offline
Registered User
 
Join Date: Jun 2009
Location: Aylmer, QC
Posts: 6,662
Slowwwwwwwwwwwwwwwwwwww Dig.
__________________
Instagram: https://www.instagram.com/the.harleydavis/
Reply With Quote
     
     
  #97  
Old Posted Jul 11, 2022, 2:07 AM
ponyboycurtis's Avatar
ponyboycurtis ponyboycurtis is offline
Cigritbutt enthusiast
 
Join Date: Apr 2021
Location: Blahttawa
Posts: 822


Crane base is installed along with some sump pits... I mean elevator shafts doohickeys.
Reply With Quote
     
     
  #98  
Old Posted Jul 15, 2022, 12:35 PM
qprcanada qprcanada is offline
Registered User
 
Join Date: Apr 2018
Posts: 109
Crane is up.
Reply With Quote
     
     
  #99  
Old Posted Aug 12, 2022, 11:23 PM
Harley613's Avatar
Harley613 Harley613 is offline
Registered User
 
Join Date: Jun 2009
Location: Aylmer, QC
Posts: 6,662
Today's Progress:
__________________
Instagram: https://www.instagram.com/the.harleydavis/
Reply With Quote
     
     
  #100  
Old Posted Oct 1, 2022, 5:26 PM
ponyboycurtis's Avatar
ponyboycurtis ponyboycurtis is offline
Cigritbutt enthusiast
 
Join Date: Apr 2021
Location: Blahttawa
Posts: 822


Decent progress considering the size of the footprint.
__________________
I don't understand how communism works.
Reply With Quote
     
     
This discussion thread continues

Use the page links to the lower-right to go to the next page for additional posts
 
 
Reply

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Ontario > Ottawa-Gatineau > Downtown & City of Ottawa
Forum Jump



Forum Jump


All times are GMT. The time now is 1:30 PM.

     
SkyscraperPage.com - Archive - Privacy Statement - Top

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2024, vBulletin Solutions, Inc.