8th floor prep work, as the tower begins its ascent off its base
loads of HVAC work on lower tower floors, and some exterior framing underway now too.
The gaps between the tower section and sidecar section on the left were filled on the 3rd floor only, you can just see a little plastic wrap. This is the only one they've filled so far, perhaps as a test?