Posted Jun 25, 2014, 3:30 AM
|
|
Mortaaaaaaaaar!
|
|
Join Date: Aug 2007
Location: Naugatuck, CT/Worcester,MA
Posts: 3,506
|
|
It's a construction method where the concrete is poured with hollow conduit running through the slab. After the concrete sets, steel cable is run through the conduit, tensioned, and then grouted in place. You can see see of the cables sticking out of the corner of the floor plate in the above photo. The technique was adapted from bridge building, and can also be seen over at the deck for the Manhattan West site.
|