HomeDiagramsDatabaseMapsForum About
     

Go Back   SkyscraperPage Forum > Regional Sections > Canada


 

 
Thread Tools Display Modes
     
     
Prev Previous Post   Next Post Next
     
     
  #11  
Old Posted Mar 16, 2017, 2:12 AM
Chadillaccc's Avatar
Chadillaccc Chadillaccc is offline
ARTchitecture
 
Join Date: Feb 2011
Location: Cala Ghearraidh
Posts: 22,842
The city of Calgary is now proposing extending the tunnelled portion of the Green Line all the way from 24 Avenue North along Centre Street, to just before Inglewood Station inside the neighbourhood of Ramsay. This extension of the tunnel will bring the tunnelled portion of the line to around 1 km longer than previously proposed and will add 2 stations to the currently approved 4 subway stations. under this proposal, the subway will go under both of Calgary's major rivers, the Bow and Elbow. The tunnelled portion will be approximately 5.5 kilometres long with 6 stations if this newest proposed routing is approved. Ultimately, Calgary now has nearly 10 kilometres of subway proposed with 9 to 10 stations, with 5.5 km and 6 stations for the Green Line, and 4 km and 3 - 4 stations for the Red Line.



https://twitter.com/LRTontheGreen
__________________
Strong & Free

Mohkínstsis — 1.6 million people at the Foothills of the Rocky Mountains, 400 high-rises, a 300-metre SE to NW climb, over 1000 kilometres of pathways, with 20% of the urban area as parkland.

Last edited by Chadillaccc; Mar 16, 2017 at 2:31 AM.
Reply With Quote
     
     
End
 
 
 

Go Back   SkyscraperPage Forum > Regional Sections > Canada
Forum Jump



Forum Jump


All times are GMT. The time now is 11:36 AM.

     
SkyscraperPage.com - Archive - Privacy Statement - Top

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2024, vBulletin Solutions, Inc.