HomeDiagramsDatabaseMapsForum About
     

Go Back   SkyscraperPage Forum > Discussion Forums > Buildings & Architecture > Completed Project Threads Archive


 

 
Thread Tools Display Modes
     
     
  #21  
Old Posted Jan 20, 2018, 1:23 PM
chris08876's Avatar
chris08876 chris08876 is offline
NYC/NJ/Miami-Dade
 
Join Date: Jul 2013
Location: Riverview Estates Fairway (PA)
Posts: 45,694

Credit: Tectonic
     
     
  #22  
Old Posted Feb 6, 2018, 2:14 AM
chris08876's Avatar
chris08876 chris08876 is offline
NYC/NJ/Miami-Dade
 
Join Date: Jul 2013
Location: Riverview Estates Fairway (PA)
Posts: 45,694

Credit: JC_Heights

Last edited by chris08876; Apr 20, 2018 at 1:02 AM.
     
     
  #23  
Old Posted Apr 20, 2018, 1:02 AM
chris08876's Avatar
chris08876 chris08876 is offline
NYC/NJ/Miami-Dade
 
Join Date: Jul 2013
Location: Riverview Estates Fairway (PA)
Posts: 45,694
Under Construction


New York en travaux perpétuels by gaelle et arnaud, on Flickr
     
     
  #24  
Old Posted May 2, 2018, 1:09 AM
chris08876's Avatar
chris08876 chris08876 is offline
NYC/NJ/Miami-Dade
 
Join Date: Jul 2013
Location: Riverview Estates Fairway (PA)
Posts: 45,694

Credit: JC_Heights
     
     
  #25  
Old Posted May 26, 2018, 4:10 PM
chris08876's Avatar
chris08876 chris08876 is offline
NYC/NJ/Miami-Dade
 
Join Date: Jul 2013
Location: Riverview Estates Fairway (PA)
Posts: 45,694

Credit: JC_Heights
     
     
  #26  
Old Posted Jul 6, 2018, 12:55 AM
chris08876's Avatar
chris08876 chris08876 is offline
NYC/NJ/Miami-Dade
 
Join Date: Jul 2013
Location: Riverview Estates Fairway (PA)
Posts: 45,694

Credit: thehighlineguy
     
     
  #27  
Old Posted Jul 28, 2018, 2:15 AM
chris08876's Avatar
chris08876 chris08876 is offline
NYC/NJ/Miami-Dade
 
Join Date: Jul 2013
Location: Riverview Estates Fairway (PA)
Posts: 45,694
Under Construction



=======================

Foundation Work Underway For Thomas Heatherwick-Designed 511-525 West 18th Street, West Chelsea



Quote:
Situated one block north of “The XI,” designed by Bjarke Ingels, and sitting adjacent to Frank Gehry’s IAC Building and Jean Nouvel’s residential tower at 100 Eleventh Avenue, Thomas Heatherwick is bringing his first set of residential buildings to the High Line, just after his “Vessel” recently topped off at Hudson Yards. The project, located at 511-525 West 18th Street, is being developed by Related Companies and will be one of the largest buildings in Chelsea when completed.

Walking along the High Line past the Observation Deck steps above 10th Avenue, the walkway begins to shift to the left on a diagonal before re-aligning itself with the avenues once again. Thomas Heatherwick’s project will sit towards the end of this first section of the High Line before the majority of the promenade starts running parallel with 10th Avenue.

The walkway in between the residential structures almost acts like a narrow passageway for tourists to cross before gazing at the dozens of unique architectural buildings, jostling for the best real estate and presence.

Looking back at Heatherwick’s project site, the High Line will stand above commercial and gallery space connecting the 425,000 square foot complex. One building will rise 22 stories on the western side of the High Line, and another on the east will stand 10 stories.

The exterior facade of both buildings will use a light brick, surrounding the signature sculptural glazing that utilizes a convex-shaped framing structure, making it a striking and eye-catching feature that differentiates the siblings from every other building in the neighborhood, let alone all of New York City. 181 condominiums will be included and will range from one-bedrooms to four-bedroom units.
======================
NYY
     
     
  #28  
Old Posted Jul 28, 2018, 2:17 AM
chris08876's Avatar
chris08876 chris08876 is offline
NYC/NJ/Miami-Dade
 
Join Date: Jul 2013
Location: Riverview Estates Fairway (PA)
Posts: 45,694
Also, NEW YORK | 515 West 18th Street | FT | 22 + 10 FLOORS (2 Components)

22 floors and 10 floors for the respective two components. Heights not known, but I'd estimate 250 ft and 125 ft.
     
     
  #29  
Old Posted Oct 23, 2018, 10:23 AM
chris08876's Avatar
chris08876 chris08876 is offline
NYC/NJ/Miami-Dade
 
Join Date: Jul 2013
Location: Riverview Estates Fairway (PA)
Posts: 45,694
In the foreground. 2 Parcels.


Credit: timothyschenck
     
     
  #30  
Old Posted Nov 2, 2018, 5:33 PM
chris08876's Avatar
chris08876 chris08876 is offline
NYC/NJ/Miami-Dade
 
Join Date: Jul 2013
Location: Riverview Estates Fairway (PA)
Posts: 45,694

Credit: JB_Slope
     
     
  #31  
Old Posted Nov 15, 2018, 4:04 AM
chris08876's Avatar
chris08876 chris08876 is offline
NYC/NJ/Miami-Dade
 
Join Date: Jul 2013
Location: Riverview Estates Fairway (PA)
Posts: 45,694
On the left.


Credit: liljaannika
     
     
  #32  
Old Posted Dec 12, 2018, 12:52 AM
chris08876's Avatar
chris08876 chris08876 is offline
NYC/NJ/Miami-Dade
 
Join Date: Jul 2013
Location: Riverview Estates Fairway (PA)
Posts: 45,694





Credit: FC
     
     
  #33  
Old Posted Dec 22, 2018, 4:12 AM
chris08876's Avatar
chris08876 chris08876 is offline
NYC/NJ/Miami-Dade
 
Join Date: Jul 2013
Location: Riverview Estates Fairway (PA)
Posts: 45,694



Credit: City Realty
     
     
  #34  
Old Posted Jan 16, 2019, 10:29 AM
chris08876's Avatar
chris08876 chris08876 is offline
NYC/NJ/Miami-Dade
 
Join Date: Jul 2013
Location: Riverview Estates Fairway (PA)
Posts: 45,694
     
     
  #35  
Old Posted Feb 7, 2019, 1:00 AM
chris08876's Avatar
chris08876 chris08876 is offline
NYC/NJ/Miami-Dade
 
Join Date: Jul 2013
Location: Riverview Estates Fairway (PA)
Posts: 45,694
In the forefront.


Credit: frytography_uk
     
     
  #36  
Old Posted Feb 20, 2019, 12:46 PM
chris08876's Avatar
chris08876 chris08876 is offline
NYC/NJ/Miami-Dade
 
Join Date: Jul 2013
Location: Riverview Estates Fairway (PA)
Posts: 45,694

Credit: JC_Heights
     
     
  #37  
Old Posted Feb 23, 2019, 12:07 AM
chris08876's Avatar
chris08876 chris08876 is offline
NYC/NJ/Miami-Dade
 
Join Date: Jul 2013
Location: Riverview Estates Fairway (PA)
Posts: 45,694

Credit: the726
     
     
  #38  
Old Posted Apr 8, 2019, 1:28 AM
chris08876's Avatar
chris08876 chris08876 is offline
NYC/NJ/Miami-Dade
 
Join Date: Jul 2013
Location: Riverview Estates Fairway (PA)
Posts: 45,694
On the left. Just one component.


Hudson Yard and High Line-190407-95.jpg by Phil Mercer-Kelly, on Flickr
     
     
  #39  
Old Posted Apr 30, 2019, 1:38 AM
chris08876's Avatar
chris08876 chris08876 is offline
NYC/NJ/Miami-Dade
 
Join Date: Jul 2013
Location: Riverview Estates Fairway (PA)
Posts: 45,694

Credit: josh85
     
     
  #40  
Old Posted May 1, 2019, 1:58 PM
chris08876's Avatar
chris08876 chris08876 is offline
NYC/NJ/Miami-Dade
 
Join Date: Jul 2013
Location: Riverview Estates Fairway (PA)
Posts: 45,694
Thomas Heatherwick’s Sculptural Windows Going Up At 515 West 18th Street, In Chelsea







Quote:
The first sculptural glass panels on Thomas Heatherwick’s premiere residential project at 515 West 18th Street are starting to be installed. The glass and metal frames are rising on the western elevation of the shorter ten-story building, which has topped out along Tenth Avenue. Heatherwick’s pair of architecturally matching structures straddle the High Line and will be an interesting addition to the Chelsea neighborhood. The taller half of the complex is rising on the western edge of the elevated park and will soon stand 22 stories high. The site is being developed by Related Companies.

The best angle to see the bubbling grid of windows is from the corners, where the degree to which they protrude from the gray-colored brick façade is more apparent. This design will also make the building appear much bolder and more voluminous in terms of its aesthetics and proportions with the structural columns and floor slabs.

The 22-story counterpart should top off sometime by the end of spring or early summer. Construction only began to rise above street level back in early December and quickly shot up in four months. There will be a total of 181 units at 515 West 18th Street, with amenities including a fitness center and spa, an entertainment room, residential lounges, and parking for 175 vehicles. There will also be landscaped outdoor rooftop terraces on both towers that overlook Chelsea, the Hudson River, and the second phase of the High Line.

Completion of 515 West 18th Street should happen sometime next year.
===============
NYY
     
     
This discussion thread continues

Use the page links to the lower-right to go to the next page for additional posts
 
 
 

Go Back   SkyscraperPage Forum > Discussion Forums > Buildings & Architecture > Completed Project Threads Archive
Forum Jump


Thread Tools
Display Modes

Forum Jump


All times are GMT. The time now is 10:51 AM.

     
SkyscraperPage.com - Archive - Privacy Statement - Top

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2024, vBulletin Solutions, Inc.