Quote:
Originally Posted by Ferocrete
Hey folks, has anything even happened at this worksite in the past month? I know they've changed steel suppliers, but has any concrete been poured, or anything else?
|
Jan 12, 09:
Jan 29, 09:
There's quite a bit different that is visible. They have also been pumping a lot of concrete down below grade, where we can't see what progress is being made from the webcams. Probobly at least half of the work day between these two pictures they have been doing pumping below grade.
You can see that they have poured the floor slab for the arcaded areas on both sides of the tower, they have a section of the main floor slab ready for a pour on each side.
They also have laid a bunch of rigid inulation, and today they are placing rebar on top of that, getting ready for another concrete pour. It looks like once that concrete pour is complete, they will be able to drive supply trucks onto the deck itself, instead of only the streets beside.