Old Posted Mar 14, 2011, 10:28 PM
caltrane74's Avatar
caltrane74 caltrane74 is offline
gettin' rich!
 
Join Date: Aug 2002
Location: Toronto
Posts: 34,166
Red face TORONTO | Cinema Condominiums | 143 M | 470 FT |43 FLOORS

www.cinemacondostoronto.com

Condo Project in the Entertainment District of Toronto







Current approvals exist for 25s & 289 units
Daniels aquired parcel to east (where festival tower sales centre is)
Daniels wants to aquire public laneway on east side of site
Plans to consolidate into a new development parcel
Laneway north of Festival Tower to remain
New proposal is 44s point tower with 6s podium
13.42 FSI
Tower has a variety of sweeping curves
Tower is articulated and the north elevation is concave
The 'concave' edge reduces the floorplate towards the middle and expands at the top
21 Widmer is planned to be 60 feet shorter then Festival Tower
Retail at grade on Adelaide
Condo entrance on Widmer + 4 townhouse units
Artscape is interested in using part of podium (where townhomes are planned) for new affordable performance space
Family amenity area in podium
Family sized units (3 bdrm +) planned in podium
Amenity floor on 21st floor to visually break-up appearance of tower
Some reduced cost units may be provided to Habitat for Humanity
250 Residential parking spaces & 100 public commercial spaces
Granite banding to be embedded in sidewalk around entire block (also in front of Festival Tower & Pinnacle development at John & Richmond)


1 Widmer St

(image available in PDF version of newsletter)

Daniels Corp. presented updated plans for the proposal at 21 Widmer Street at Councillor Vaughan's King-Spadina Development meeting January 20. The updated plans include a 44-storey, 445 unit building (38 storeys + 6 storey podium).

Numerous changes have been made to the design of the project since the preliminary report was filed in March 2008, in part based on feedback from a charrette that was held on this block, which also contains the TIFF Bell Lightbox (which is under construction) and a proposal by Pinnacle International.

A block plan was developed as a result of the charrette, which recommended greater special separation of the towers in each of the proposals, developing the laneways between projects as pedestrian-friendly spaces, creating mid-block pedestrian connectivity, and connected service areas for the parking, loading and garbage of the buildings.The point tower has been redesigned to be concave on the north façade, with notches in the design on the north-west corner. This replaces the former proposal where the entire tower had a concave shape. The podium will follow the same height as the podium of the TIFF building to the south, and will have articulated masonry panels similar to the renovated Royal Conservatory of Music on Bloor Street to fit with the warehouse character of the area. There will be a glass façade on the ground-level Artscape performance space to allow visibility into the building, similar to the National Ballet School on Jarvis Street.

As part of the community benefits that would be provided as part of this proposal, Artscape will have 6000 square feet of performance space. They are also aiming for 10 per cent to be 3-bedroom units, which would be 44-45 units. They would also like to provide affordable home ownership options via Habitat for Humanity.

Questions were raised about whether the Corned Beef House at the north-west corner of the site could be included in the proposal in the future. Councillor Vaughan indicated that several parties have tried to contact the property owner about the possibility of purchasing the property, but she was not willing to do so. Councillor Vaughan said that he has requested Daniels to design the building with knockout panels so that a hard park could be created at that corner if this property became available in the future.

Quote:
Originally Posted by Jasonzed View Post
March 12th





Pictures from Jasonzed at UT
     
     
  #2  
Old Posted Mar 15, 2011, 2:43 AM
yaletown_fella yaletown_fella is offline
Registered User
 
Join Date: Feb 2009
Location: Toronto
Posts: 3,320
Not a pretty tower. But the entertainment district has some nasty parking lots.
     
     
  #3  
Old Posted Mar 15, 2011, 3:53 AM
Coldrsx's Avatar
Coldrsx Coldrsx is offline
Community Guy
 
Join Date: Dec 2003
Location: Canmore, AB
Posts: 66,638
Tower is a little dated and 'been done' but the podium is equally meh as it interests me.
__________________
"The destructive effects of automobiles are much less a cause than a symptom of our incompetence at city building" - Jane Jacobs 1961ish

Wake me up when I can see skyscrapers
     
     
  #4  
Old Posted Mar 15, 2011, 9:47 AM
caltrane74's Avatar
caltrane74 caltrane74 is offline
gettin' rich!
 
Join Date: Aug 2002
Location: Toronto
Posts: 34,166
This one has no merit for the fact it is a "Parking Lot Buster".

And yes, there are way to many parking lots in the Entertainment District, and I personally would like to see them all replaced by 40 to 50 storey condo towers.
Funny enough, that is basically what is happening. I just hope the area can maintain and improve its hip vibe. Another positive development would be for some wider sidewalks, that area is way to crowded. Thank God John St. might go pedestrian only.
     
     
  #5  
Old Posted Apr 7, 2011, 4:34 PM
caltrane74's Avatar
caltrane74 caltrane74 is offline
gettin' rich!
 
Join Date: Aug 2002
Location: Toronto
Posts: 34,166
From Red Mars at UT

     
     
  #6  
Old Posted Apr 12, 2011, 2:04 PM
caltrane74's Avatar
caltrane74 caltrane74 is offline
gettin' rich!
 
Join Date: Aug 2002
Location: Toronto
Posts: 34,166
Quote:
Originally Posted by interchange42 View Post
Urban Toronto recently ventured down to The Daniels Corporation’s Cinema Tower construction site for a visit. We caught both excavation and concrete pouring in progress.

Here is how the site looked on March 30th. Excavation is still taking place in the back left corner, but we’ll turn our attention to foundation pouring first. See those concrete mixer trucks on either side of the crane up at the surface…


Craig White


A bucket has just been filled with concrete mix


Craig White


The bucket is lowered into the excavated pit


Craig White


A worker waits by the edge of the foundation pit


Craig White


The foundation pit extends deeper into the bedrock than the lower basement garage levels. The pit will be filled with concrete and reinforcing steel rods, and will act as an anchor at the base of the tower’s central core and its elevator shafts


Craig White


The bucket is lowered sufficiently close to the worker, who then pulls down on the extending bar which opens the trap closure at the bottom of the bucket


Craig White


Many buckets will be needed to fill the pit.


Craig White


The bucket is quickly hoisted back to the surface for a refill. Meanwhile, in the lower right corner, we see a shovel still excavating the east side of the site.


Craig White


The shovel is operating at the end of a wall of soldier piles, lagging, and braces. Soldier piles are long steel I-beams which are driven into ground at regular intervals. As the excavation of the pit progresses, timber lagging is slotted between the soldier piles to hold back the earth behind them. Braces are added to keep the wall standing until it is naturally braced by the newly built concrete walls and floors of the basement levels.


Craig White


The shovel removes earth and rock from around a diagonal brace. Excavation around these braces is tricky and time consuming.


Craig White


Behind the shovel is another type of wall: this caisson wall is made up of interlocking columns of concrete. It is braced by tie-backs, which steel wire ropes anchored to the bedrock in behind. This type of wall where the bracing does not protrude into the pit makes for easier excavation, but it requires an easement under the adjacent property when excavation extends to the property line. Besides securing an agreement with the abutting owner, soil and rock conditions behind the wall must be stable.


Craig White


We are back a week later, thanks to Red Mars. The excavation of the pit is virtually complete, other than the access ramp itself. Shovels are now put to work to remove it.


Red Mars


Another three days later, thanks to Jasonzed we see that most of the ramp has been removed. When the excavation is complete the shovels will be hoisted from the pit by the crane.


Jasonzed


Urban Toronto will return often to the Cinema Tower site during its construction to tell you more about the process of creating a new building.

Cinema Tower from Red Mars, Jasonzed, Craig White at www.urbantoronto.ca
     
     
  #7  
Old Posted Apr 19, 2011, 12:54 PM
caltrane74's Avatar
caltrane74 caltrane74 is offline
gettin' rich!
 
Join Date: Aug 2002
Location: Toronto
Posts: 34,166
Quote:
Originally Posted by drum118 View Post
April 15
I support the removal of the above ground parking as it's a waste of space and could be used for more units, retail and etc. Why do you need a car when you are in walking distance of things?







Cinema Condos update from drum118 at UT
     
     
  #8  
Old Posted Apr 20, 2011, 5:45 AM
Dylan Leblanc's Avatar
Dylan Leblanc Dylan Leblanc is offline
Website Manager
 
Join Date: Dec 1999
Posts: 9,317
Moved to construction section.
     
     
  #9  
Old Posted Apr 21, 2011, 12:58 PM
caltrane74's Avatar
caltrane74 caltrane74 is offline
gettin' rich!
 
Join Date: Aug 2002
Location: Toronto
Posts: 34,166
wow, thanks.

That was fast....
     
     
  #10  
Old Posted Jun 4, 2011, 4:16 PM
caltrane74's Avatar
caltrane74 caltrane74 is offline
gettin' rich!
 
Join Date: Aug 2002
Location: Toronto
Posts: 34,166
Quote:
Originally Posted by Red Mars View Post
Recent pic

June 3, 2011


From Red Mars at UT

Thread here:

http://urbantoronto.ca/forum/showthr...rkor%29/page20
     
     
  #11  
Old Posted Jul 18, 2011, 1:22 PM
caltrane74's Avatar
caltrane74 caltrane74 is offline
gettin' rich!
 
Join Date: Aug 2002
Location: Toronto
Posts: 34,166
Quote:
Originally Posted by drum118 View Post
July 14









from drum118 at UT

thread here:

http://urbantoronto.ca/forum/showthr...Kirkor)/page20
     
     
  #12  
Old Posted Jul 24, 2011, 3:35 AM
Dwils01's Avatar
Dwils01 Dwils01 is offline
Urban Fanactic
 
Join Date: Mar 2010
Location: Coquitlam
Posts: 3,245
Cinema Condos from today by me.
     
     
  #13  
Old Posted Sep 12, 2011, 2:40 PM
caltrane74's Avatar
caltrane74 caltrane74 is offline
gettin' rich!
 
Join Date: Aug 2002
Location: Toronto
Posts: 34,166
Video Link




Some video
     
     
  #14  
Old Posted Sep 15, 2011, 2:12 PM
caltrane74's Avatar
caltrane74 caltrane74 is offline
gettin' rich!
 
Join Date: Aug 2002
Location: Toronto
Posts: 34,166
     
     
  #15  
Old Posted Nov 4, 2011, 4:32 AM
Dwils01's Avatar
Dwils01 Dwils01 is offline
Urban Fanactic
 
Join Date: Mar 2010
Location: Coquitlam
Posts: 3,245
Cinema Condo


Picture by me from Oct 31.
     
     
  #16  
Old Posted Nov 4, 2011, 7:04 PM
caltrane74's Avatar
caltrane74 caltrane74 is offline
gettin' rich!
 
Join Date: Aug 2002
Location: Toronto
Posts: 34,166
clearly up and above ground level now!!!!

Another tower in the entertainment district and the death of clubland!!!
     
     
  #17  
Old Posted Dec 3, 2011, 11:13 PM
Dwils01's Avatar
Dwils01 Dwils01 is offline
Urban Fanactic
 
Join Date: Mar 2010
Location: Coquitlam
Posts: 3,245
Cinema Condominium


Photo by me from Sunday November 27, 2011.
     
     
  #18  
Old Posted Dec 8, 2011, 11:27 AM
caltrane74's Avatar
caltrane74 caltrane74 is offline
gettin' rich!
 
Join Date: Aug 2002
Location: Toronto
Posts: 34,166
Wow! I know I posted pictures and everything but I thought they were still excavating the dirt out of the pit. This building is along with the Pinnacle Tower in the entertainment district is helping push the city downtown core west of University Towards Spadina, same has along the waterfront. Also building depth for the skyline.
     
     
  #19  
Old Posted Dec 13, 2011, 2:38 AM
caltrane74's Avatar
caltrane74 caltrane74 is offline
gettin' rich!
 
Join Date: Aug 2002
Location: Toronto
Posts: 34,166
From Jasonzed at UT


Quote:
Originally Posted by Jasonzed View Post
From today


See the thread here
http://urbantoronto.ca/forum/showthr...Kirkor)/page22
     
     
  #20  
Old Posted Dec 13, 2011, 2:00 PM
Travis007's Avatar
Travis007 Travis007 is offline
Registered User
 
Join Date: May 2011
Location: Toronto
Posts: 2,213
Insane density coming to this block. Cinema + Festival Tower + Pinnacle = approx. 1,500 units, within one city block. Pretty unreal.
__________________
Flickr
     
     
This discussion thread continues

Use the page links to the lower-right to go to the next page for additional posts
 
 
 

Go Back   SkyscraperPage Forum > Discussion Forums > Buildings & Architecture > Completed Project Threads Archive
Forum Jump


Thread Tools
Display Modes

Forum Jump


All times are GMT. The time now is 5:26 AM.

     
SkyscraperPage.com - Archive - Privacy Statement - Top

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2024, vBulletin Solutions, Inc.