HomeDiagramsDatabaseMapsForum About
     

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Alberta & British Columbia > Calgary > Transportation & Infrastructure


 

 
Thread Tools Display Modes
     
     
Prev Previous Post   Next Post Next
     
     
  #1  
Old Posted Mar 15, 2007, 4:24 AM
korzym's Avatar
korzym korzym is offline
Registered User
 
Join Date: Nov 2006
Posts: 703
Calgary Stoney Trail [Ring Road]

*Newest Videos, High Definition*
All of the following are made by me, and are my property
Tsuut'ina Trail - Calgary SW Ring Road
Video Link


Video Link

**2ND NEW VIDEO**
Video Link



Video Link
Video Link

construction starts in April...complete in november 2009. Update: Currently some outlets are claiming November 1st, 2009 as the opening date. A forum member personally spoke to the transport minister at a recent community meeting and he said the premier will be at a ribbon cutting ceremony on November 2nd.

Quote:
The Alberta government has signed a 30-year contract with the Stoney Trail Group to design, build, operate and partially finance Stoney Trail from its junction with Deerfoot Trail to 17 Avenue SE. The contract also includes maintenance of Stoney Trail NW from its junction with Deerfoot Trail to 16 Avenue NW.

Total length is 21 kilometres.

Six-lane sections from Deerfoot Trail to Metis Trail (44 Street NE) and McKnight Boulevard to 16 Avenue NE. Other sections are four-lane.

Interchanges at Deerfoot Trail, Metis Trail, Country Hills Boulevard, Airport Trail, McKnight Boulevard, and 16 Avenue NE.

Signalized t-intersection at 17 Avenue SE. An interchange will be built when Stoney Trail is extended south of 17 Avenue SE.

Construction of two new railway bridge structures and rehabilitation of two existing railway bridge structures.
Open house is March 29 from 2 to 8 pm at Sunridge Mall

Speed limits:
NE: 100 km/h at first, then 110 km/h around 2015
NW: 80 km/h or 60 km/h depending on construction zones. 100 km/h from bedington to deerfoot
SE & SW: TBD, indications that by 2015 it will be 110 km/h



Government Website with diagrams & pictures:
http://www.transportation.alberta.ca/804.htm


Chinook Roads Partnership website [the SE portion, under construction]:
http://www.sestproject.ca/photo-gallery

Last edited by korzym; Oct 6, 2020 at 4:31 AM.
Reply With Quote
     
     
End
 
 
 

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Alberta & British Columbia > Calgary > Transportation & Infrastructure
Forum Jump



Forum Jump


All times are GMT. The time now is 4:13 AM.

     
SkyscraperPage.com - Archive - Privacy Statement - Top

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2024, vBulletin Solutions, Inc.