Old Posted Sep 19, 2011, 2:49 PM
reidjr reidjr is offline
Registered User
 
Join Date: Dec 2009
Posts: 1,237
Quote:
Originally Posted by Ottawan View Post
Yes it is.
I though there was only two towers?
Reply With Quote
     
     
  #622  
Old Posted Sep 19, 2011, 3:43 PM
Ottawan Ottawan is offline
Citizen-at-large
 
Join Date: Aug 2009
Location: Expat (in Toronto)
Posts: 738
Quote:
Originally Posted by reidjr View Post
I though there was only two towers?
There are only two taller towers facing the Nepean side of the site, but there is also a shorter & wider third building (I believe 6 stories, so tall enough, but not a "tower" when seen next to the two 20+ towers) that fronts along Lisgar.

Last edited by Ottawan; Sep 19, 2011 at 4:09 PM.
Reply With Quote
     
     
  #623  
Old Posted Sep 19, 2011, 3:45 PM
gjhall's Avatar
gjhall gjhall is offline
Registered User
 
Join Date: Aug 2009
Location: Ottawa
Posts: 1,297
Quote:
Originally Posted by reidjr View Post
I though there was only two towers?
And a row of towns, which you can sort of see in the planning report: http://ottawa.ca/calendar/ottawa/cit...alfe%20St..htm
Reply With Quote
     
     
  #624  
Old Posted Oct 12, 2011, 2:57 PM
Richard Eade Richard Eade is offline
Registered User
 
Join Date: Mar 2008
Location: Nepean
Posts: 1,945
They still seem to be slowly scraping and chipping away at the shale in the bottom of the hole.


Photo: 2011-Oct-11
Reply With Quote
     
     
  #625  
Old Posted Oct 12, 2011, 3:51 PM
S-Man S-Man is offline
Registered User
 
Join Date: Mar 2011
Posts: 1,639
Yikes - how long have they been digging? It's been a year plus, right?
Reply With Quote
     
     
  #626  
Old Posted Oct 12, 2011, 4:39 PM
Harley613's Avatar
Harley613 Harley613 is online now
Registered User
 
Join Date: Jun 2009
Location: Aylmer, QC
Posts: 6,630
i walked by for the first time since january this week and WOW what a hole! pictures do it no justice, this thing is IMMENSE. i've never seen anything like it in ottawa...when they did claridge plaza they didn't dig tower II until tower I was finished. very impressive indeed.
Reply With Quote
     
     
  #627  
Old Posted Oct 17, 2011, 5:13 PM
Lloyd's Avatar
Lloyd Lloyd is offline
Registered User
 
Join Date: May 2009
Posts: 83
Here I am thinking that they'll be chipping away forever at the huge hole until the bottom is levelled out, but I was wrong. Walking back to Place Bell from a nearby coffee shop, I saw them laying down large strips of a plastic protective layer (?) on the (slanted) east end of the hole.
Reply With Quote
     
     
  #628  
Old Posted Oct 17, 2011, 9:24 PM
Deez's Avatar
Deez Deez is offline
you know my steez
 
Join Date: Jan 2006
Location: Toronto/Ottawa
Posts: 1,397
Actually this likely means they're not done yet. Based on your description, it sounds like they're laying down blasting mats. These are placed above rock that is being blasted away to prevent debris from shooting all over the place.

Alternatively, you may have seen them laying geotextile, which would mean they are through digging.
Reply With Quote
     
     
  #629  
Old Posted Oct 18, 2011, 12:06 AM
Uhuniau Uhuniau is offline
Registered User
 
Join Date: Jan 2010
Posts: 7,978
Quote:
Originally Posted by Harley613 View Post
i walked by for the first time since january this week and WOW what a hole! pictures do it no justice, this thing is IMMENSE. i've never seen anything like it in ottawa...when they did claridge plaza they didn't dig tower II until tower I was finished. very impressive indeed.
It's a wonderful hole! Been so much fun to watch them dig it.

I wish they'd let people rock-hunt in the pit before they start manscaping it, though.
Reply With Quote
     
     
  #630  
Old Posted Oct 18, 2011, 9:45 AM
Lloyd's Avatar
Lloyd Lloyd is offline
Registered User
 
Join Date: May 2009
Posts: 83
Quote:
Originally Posted by Deez View Post
Actually this likely means they're not done yet. Based on your description, it sounds like they're laying down blasting mats. These are placed above rock that is being blasted away to prevent debris from shooting all over the place.

Alternatively, you may have seen them laying geotextile, which would mean they are through digging.
It's geotextile. Had to look that up.

They hung a giant roll of it from an excavator and unrolled a few rows of it over the rock and concrete patches (they poured some in last week to fill in uneven areas).
Reply With Quote
     
     
  #631  
Old Posted Oct 26, 2011, 6:16 PM
kevinbottawa kevinbottawa is offline
Registered User
 
Join Date: May 2010
Location: Toronto
Posts: 2,229
I stopped into the Tribeca sales office today and they said the second tower is launching on November 3rd.
Reply With Quote
     
     
  #632  
Old Posted Oct 27, 2011, 6:21 PM
amanfromnowhere's Avatar
amanfromnowhere amanfromnowhere is offline
Registered User
 
Join Date: Jul 2007
Location: Ottawa/Stockholm
Posts: 367
web site (teaser?) of phase II:

http://claridgecondos.com/teasers/tribeca_east

Last edited by amanfromnowhere; Oct 27, 2011 at 7:05 PM.
Reply With Quote
     
     
  #633  
Old Posted Oct 28, 2011, 3:22 PM
K-133's Avatar
K-133 K-133 is offline
Registered User
 
Join Date: Mar 2010
Posts: 169
Quote:
Originally Posted by kevinbottawa View Post
I stopped into the Tribeca sales office today and they said the second tower is launching on November 3rd.
I received an email notice stating the same date.
__________________
Resistance is futile.
Nevertheless, I'll try to take your concerns into consideration.
Reply With Quote
     
     
  #634  
Old Posted Oct 28, 2011, 9:06 PM
ServiceGuy ServiceGuy is offline
Registered User
 
Join Date: Dec 2009
Posts: 303
I was chatting with someone that knows the site super over at Tribeca and he was telling me they need to pour a single four foot thick slab all in one shot to withstand the hydrostatic pressure. There's a name for that kind of base slab but I forget what it's called. It would be really interesting to see how they lay four feet of concrete horizontally.
Reply With Quote
     
     
  #635  
Old Posted Oct 30, 2011, 11:04 AM
reidjr reidjr is offline
Registered User
 
Join Date: Dec 2009
Posts: 1,237
Quote:
Originally Posted by kevinbottawa View Post
I stopped into the Tribeca sales office today and they said the second tower is launching on November 3rd.
Has this one been approved by council yet?
Reply With Quote
     
     
  #636  
Old Posted Oct 31, 2011, 4:49 PM
JackBauer24 JackBauer24 is offline
Registered User
 
Join Date: Nov 2010
Posts: 748
Quote:
Originally Posted by S-Man View Post
Yikes - how long have they been digging? It's been a year plus, right?
I think they started shortly after Soho Lisgar was released, which was spring/summer last year. So they've been at it for at least a year.

The project is funded by Claridge themselves, so there was no sales quota to meet prior to construction starting, which is unusual for a project as large as this one. But it enabled Claridge to start sooner and increase sales momentum and should have enabled them to complete the project faster - the latter seems to be a moot point at this stage.
Reply With Quote
     
     
  #637  
Old Posted Nov 8, 2011, 3:07 AM
blackjagger's Avatar
blackjagger blackjagger is offline
Registered User
 
Join Date: Jun 2009
Location: Ottawa, Ontario
Posts: 287
Nothing yet...hoping to see some progress soon.

Taken Nov 7/11


Picture by Me
Reply With Quote
     
     
  #638  
Old Posted Nov 9, 2011, 9:19 PM
Davis137's Avatar
Davis137 Davis137 is offline
Registered User
 
Join Date: Aug 2008
Posts: 2,290
Wow, that pit looks like it's 5-6 storeys deep...hopefully we'll see some action with the construction soon...
Reply With Quote
     
     
  #639  
Old Posted Nov 21, 2011, 4:54 PM
amanfromnowhere's Avatar
amanfromnowhere amanfromnowhere is offline
Registered User
 
Join Date: Jul 2007
Location: Ottawa/Stockholm
Posts: 367
Tribeca by southfacing:

Reply With Quote
     
     
  #640  
Old Posted Nov 21, 2011, 4:58 PM
amanfromnowhere's Avatar
amanfromnowhere amanfromnowhere is offline
Registered User
 
Join Date: Jul 2007
Location: Ottawa/Stockholm
Posts: 367
this angle also shows the Merit and 150 Elgin site prep...
Reply With Quote
     
     
This discussion thread continues

Use the page links to the lower-right to go to the next page for additional posts
 
 
Reply

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Ontario > Ottawa-Gatineau > Downtown & City of Ottawa
Forum Jump


Thread Tools
Display Modes

Forum Jump


All times are GMT. The time now is 1:39 PM.

     
SkyscraperPage.com - Archive - Privacy Statement - Top

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2024, vBulletin Solutions, Inc.