Another mobile crane on site today so maybe they have restarted work on this project which has been stalled for months.
Reply With Quote
     
     
  #22  
Old Posted Jun 21, 2023, 10:27 PM
jammer139 jammer139 is offline
Registered User
 
Join Date: Jun 2016
Location: London
Posts: 5,795
They have restarted work with forming up for the L1 walls on the west side. At the pace they are going they may have the ground floor slab poured by the end of the year thou.
Reply With Quote
     
     
  #23  
Old Posted Jul 13, 2023, 7:07 PM
jammer139 jammer139 is offline
Registered User
 
Join Date: Jun 2016
Location: London
Posts: 5,795
They have hit a milestone finally with the completion of the ground floor slab being installed using precast concrete slabs. No signs yet what construction method they plan to use for the above ground floors. Still no signs that they will setup a tower crane for this build either.
Reply With Quote
     
     
  #24  
Old Posted Jul 16, 2023, 4:28 PM
CanadianTalk CanadianTalk is offline
Moderator
 
Join Date: Jun 2021
Location: London, Ontario
Posts: 693
Looking north from Fanshawe Park Road:




NW from Stackhouse:




SW from Stackhouse:

Reply With Quote
     
     
  #25  
Old Posted Aug 5, 2023, 6:55 PM
jammer139 jammer139 is offline
Registered User
 
Join Date: Jun 2016
Location: London
Posts: 5,795
They have formed and poured a couple of small sections of ground floor wall and also built some using concrete block. Progress is very slow and at the rate they are going they will still be putting up ground floor walls months from now.
Reply With Quote
     
     
  #26  
Old Posted Aug 21, 2023, 7:29 PM
jammer139 jammer139 is offline
Registered User
 
Join Date: Jun 2016
Location: London
Posts: 5,795
Progress has started again on this site with mobile crane installing structural steel posts and beams for the ground floor. Looks like they will be using precast floor slabs and structural steel and poured elevator shaft for this 6s building.
Reply With Quote
     
     
  #27  
Old Posted Sep 1, 2023, 11:30 PM
CanadianTalk CanadianTalk is offline
Moderator
 
Join Date: Jun 2021
Location: London, Ontario
Posts: 693


Reply With Quote
     
     
  #28  
Old Posted Sep 2, 2023, 12:20 AM
jammer139 jammer139 is offline
Registered User
 
Join Date: Jun 2016
Location: London
Posts: 5,795
Nice photo update.
Reply With Quote
     
     
  #29  
Old Posted Sep 12, 2023, 8:10 PM
jammer139 jammer139 is offline
Registered User
 
Join Date: Jun 2016
Location: London
Posts: 5,795
Have started installing the 2nd floor pre-cast floor slabs on the south end. Hopefully they are able to complete the 2nd floor slab install by end of the week.
Reply With Quote
     
     
  #30  
Old Posted Sep 23, 2023, 9:04 PM
CanadianTalk CanadianTalk is offline
Moderator
 
Join Date: Jun 2021
Location: London, Ontario
Posts: 693


Reply With Quote
     
     
  #31  
Old Posted Oct 4, 2023, 12:49 PM
jammer139 jammer139 is offline
Registered User
 
Join Date: Jun 2016
Location: London
Posts: 5,795
They have now installed the 2nd floor steel wall modules.
Should see 3rd floor precast concrete floor slabs being installed soon.
Reply With Quote
     
     
  #32  
Old Posted Oct 6, 2023, 1:02 PM
jammer139 jammer139 is offline
Registered User
 
Join Date: Jun 2016
Location: London
Posts: 5,795
Looks like they have most of the 3rd floor precast concrete floor slabs installed now and forming for 3rd floor elevator/stairwell shaft walls has started going up.
Reply With Quote
     
     
  #33  
Old Posted Oct 7, 2023, 6:11 PM
CanadianTalk CanadianTalk is offline
Moderator
 
Join Date: Jun 2021
Location: London, Ontario
Posts: 693


Reply With Quote
     
     
  #34  
Old Posted Oct 23, 2023, 11:17 AM
jammer139 jammer139 is offline
Registered User
 
Join Date: Jun 2016
Location: London
Posts: 5,795
Most of the 3rd floor steel modular wall panels are now installed and some more structural steel wall posts. Should see 4th floor precast concrete floor slabs being landed soon.
Reply With Quote
     
     
  #35  
Old Posted Oct 25, 2023, 8:19 PM
jammer139 jammer139 is offline
Registered User
 
Join Date: Jun 2016
Location: London
Posts: 5,795
They have now landed the 4th floor precast concrete slabs and have started forming for the elevator/stairwell 4th floor walls.
Reply With Quote
     
     
  #36  
Old Posted Nov 5, 2023, 5:44 PM
CanadianTalk CanadianTalk is offline
Moderator
 
Join Date: Jun 2021
Location: London, Ontario
Posts: 693


Reply With Quote
     
     
  #37  
Old Posted Nov 8, 2023, 12:46 PM
jammer139 jammer139 is offline
Registered User
 
Join Date: Jun 2016
Location: London
Posts: 5,795
Nice photo.


Shows the signage that this project is by Brock Development Group. The same company that built the Teeple Terrace building on Wonderland Rd S.


https://lfpress.com/news/local-news/...ding-speak-out


Should see the 5th floor precast floor slabs being installed very soon. Would not be surprised to see this 6s building topped out before the holiday break. Exterior and interior finishing over the winter months with first tenants in the spring.
Reply With Quote
     
     
  #38  
Old Posted Nov 24, 2023, 4:07 PM
jammer139 jammer139 is offline
Registered User
 
Join Date: Jun 2016
Location: London
Posts: 5,795
Installing the 5th floor modular steel walls this week. Should see some of the 6th floor precast floor slabs being installed next week.
Reply With Quote
     
     
  #39  
Old Posted Dec 29, 2023, 7:00 PM
jammer139 jammer139 is offline
Registered User
 
Join Date: Jun 2016
Location: London
Posts: 5,795
Have now installed the 6th floor precast slabs and have the elevator/stairwell shafts poured for the 6th floor. Should see the 6th floor steel modular walls being installed starting next week.
Reply With Quote
     
     
  #40  
Old Posted Dec 30, 2023, 7:31 PM
CanadianTalk CanadianTalk is offline
Moderator
 
Join Date: Jun 2021
Location: London, Ontario
Posts: 693


Reply With Quote
     
     
This discussion thread continues

Use the page links to the lower-right to go to the next page for additional posts
 
 
Reply

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Ontario > London > Projects & Construction Updates
Forum Jump



Forum Jump


All times are GMT. The time now is 6:18 AM.

     
SkyscraperPage.com - Archive - Privacy Statement - Top

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2024, vBulletin Solutions, Inc.