HomeDiagramsDatabaseMapsForum About
     

Go Back   SkyscraperPage Forum > Regional Sections > Canada


 

 
Thread Tools Display Modes
     
     
Prev Previous Post   Next Post Next
     
     
  #10  
Old Posted Nov 13, 2008, 5:09 AM
MalcolmTucker MalcolmTucker is offline
Registered User
 
Join Date: May 2007
Posts: 11,440
Quote:
Originally Posted by Jamaican-Phoenix View Post
I would actually have it be Montreal-Ottawa-Toronto with connection to all three airports. This way, you actually connect via HSR three of the four largest cities in Canada...
Just a standard speed rail connection (not shared with freight) with good frequency, would be enough to tie in, no reason to pay so much when there would be a forced transfer in Montreal anyways (don't think their would be enough O'D to justify direct Ottawa-Toronto trains at the frequency needed to make it viable).

You could make the same justification to extending to Hamilton using highspeed, but what is the point really, it is better to build in phases, and build up good feeder networks, which takes alot of time. Plus, it would likely make more sense to not run through Hamilton at all, but roughly follow the 401 and hit the surrounding cities. Especially since the infrastructure is already planned to feed Hamilton into the Union hub.
Reply With Quote
     
     
End
 
 
 

Go Back   SkyscraperPage Forum > Regional Sections > Canada
Forum Jump



Forum Jump


All times are GMT. The time now is 7:41 AM.

     
SkyscraperPage.com - Archive - Privacy Statement - Top

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2024, vBulletin Solutions, Inc.