HomeDiagramsDatabaseMapsForum About
     

Go Back   SkyscraperPage Forum > Regional Sections > United States > Southeast


Reply

 
Thread Tools Display Modes
     
     
  #61  
Old Posted Dec 22, 2009, 4:18 PM
| BRAVO | | BRAVO | is offline
Closed account
 
Join Date: Dec 2006
Posts: 786
I will say I was terribly thrilled to see the widening of I-20 through St. Clair County progressing nicely. It should be six lanes all the way to Oxford in my opinion.

That is one scary stretch of highway.
Reply With Quote
     
     
  #62  
Old Posted Dec 22, 2009, 8:27 PM
ttownfeen ttownfeen is offline
Registered User
 
Join Date: Aug 2006
Location: By the Mounds
Posts: 398
What parts of I-20 between B'ham and Oxford remain to the be three-laned? I think all of I-20 between B'ham and the Coosa River is three-laned except for the part through the Karr Gap.
Reply With Quote
     
     
  #63  
Old Posted Dec 22, 2009, 9:23 PM
| BRAVO | | BRAVO | is offline
Closed account
 
Join Date: Dec 2006
Posts: 786
Quote:
Originally Posted by ttownfeen View Post
What parts of I-20 between B'ham and Oxford remain to the be three-laned? I think all of I-20 between B'ham and the Coosa River is three-laned except for the part through the Karr Gap.

The bridge over Lake Logan Martin to just beyond the race track is 2 lanes. It picks up 3 lanes after the track to the Calhoun county line then it's the 2-lane \bone-jarring\ concrete into Oxford.
Reply With Quote
     
     
  #64  
Old Posted Dec 22, 2009, 9:25 PM
| BRAVO | | BRAVO | is offline
Closed account
 
Join Date: Dec 2006
Posts: 786
Oh yeah... from the I-20/59 split to Oporto Madrid Blvd is 2 lanes as well --- right through the middle of East Birmingham ---
Reply With Quote
     
     
  #65  
Old Posted Dec 25, 2009, 1:31 AM
sabre0link's Avatar
sabre0link sabre0link is offline
Registered User
 
Join Date: Mar 2006
Location: Birmingham
Posts: 266
Re: 280 interchange at 459...

But but but.. they just FINISHED that (ok, in the past year or two, but still! And my sense of time has warped lately... :\).. and now they want to tear it up? *sigh*

Re: the wacky use of toll lanes...

*sigh*

Dolly Ridge could be done that way... lane shifts and regrading the hill would likely help out a lot.. Trying to get my head around the overpass at Lakeshore/Shades Creek (149) and then the underpass at Cherokee... and then an overpass at Rocky Ridge.......... Shades Mountain Cut, anyone?

My absolute least favorite thing is turning left out of the Summit onto 280... there's been NUMEROUS times when there's been 4 lanes of traffic turning left out of the Summit onto 3 lane 280....

*grumble*

Minor rants aside... I wanted to toss in a few updates I found regarding the Northern Beltway (designation 959)..

http://blog.al.com/spotnews/2009/12/...rk_set_to.html

http://www.pbs.org/wnet/blueprintame.../overview/782/

__________________
Spiral beltways: giving new meaning to spiral-cut ham.

"All these other cities are getting buildings taller than 15 stories, and all I'm getting is a spiral beltway!" - Birmingham
Reply With Quote
     
     
  #66  
Old Posted Dec 25, 2009, 3:39 AM
Rail Claimore's Avatar
Rail Claimore Rail Claimore is offline
Registered User
 
Join Date: Jul 2001
Location: Dallas
Posts: 6,231
You'd think 3 left-turn lanes would be enough, especially considering it's the only place in the state I'm aware of with that characteristic.

959? Shouldn't the first digit be even?
__________________
So am I supposed to sign something here?
Reply With Quote
     
     
  #67  
Old Posted Dec 25, 2009, 5:40 AM
SpawnOfVulcan's Avatar
SpawnOfVulcan SpawnOfVulcan is offline
Cat Enthusiast
 
Join Date: Apr 2008
Location: America's Magic City
Posts: 3,858
It's designated as 422 so that it can receive Appalachian development funding.

EDIT:

I just read the article. Odd, I never heard about it being labeled 959
__________________
SSP Alabama Metros: Birmingham (City Compilation) - Huntsville - Mobile - Montgomery - Tuscaloosa - Daphne-Fairhope - Decatur

SSP Alabama Universities: Alabama - UAB - Alabama State

Last edited by SpawnOfVulcan; Dec 25, 2009 at 5:54 AM.
Reply With Quote
     
     
  #68  
Old Posted Dec 25, 2009, 6:55 AM
sabre0link's Avatar
sabre0link sabre0link is offline
Registered User
 
Join Date: Mar 2006
Location: Birmingham
Posts: 266
Quote:
Originally Posted by Rail Claimore View Post
You'd think 3 left-turn lanes would be enough, especially considering it's the only place in the state I'm aware of with that characteristic.
What ends up happening is that people get in the straight lane, and speed up to get in front of those in the furthest right, left-hand turn lane...

What's really great about it, is you'd think it was people that couldn't merge into the left turn lane... nope. I've seen people LEAVE those left turn lanes, get into the straight lane, then speed up to get in front of those turning left...

I normally see one car do this silly stunt.. the other day I saw 3.. they followed each other through the turn...

Summit Blvd's my quickest, easiest access to 459S... so I get to deal with this whenever I'm driving that way (which is at least 85% of the time... LOL)

Bleh.

Yay /rant.
__________________
Spiral beltways: giving new meaning to spiral-cut ham.

"All these other cities are getting buildings taller than 15 stories, and all I'm getting is a spiral beltway!" - Birmingham
Reply With Quote
     
     
  #69  
Old Posted Dec 25, 2009, 7:14 AM
sabre0link's Avatar
sabre0link sabre0link is offline
Registered User
 
Join Date: Mar 2006
Location: Birmingham
Posts: 266
Quote:
Originally Posted by Alabadrock View Post
It's designated as 422 so that it can receive Appalachian development funding.

EDIT:

I just read the article. Odd, I never heard about it being labeled 959
Same.. I thought it was designated with a ?22 number as well, but seeing as neither end touched 22, I couldn't see how it'd actually be feasible.. (unique, though).

459 ends at 59 (or 59/20) on both ends.. the N.B. will do the same, though there were talks of extending it from 59 to 20, which would make a designation with 20 as it's base..

However, if the N.B. had been in continual construction since 459 was finished, it likely would carry the 459 designation, given it would be a loop and not end up being a spiral.

To refresh my miniscule brain, i searched to find stuff... with some real official designations...

959 = State designation
422 = (potential) Interstate designation

http://en.wikipedia.org/wiki/Corridor_X-1
http://www.bhamwiki.com/wiki/index.p...thern_Beltline
http://www.bhammpo.org/docs/BNB.pdf
__________________
Spiral beltways: giving new meaning to spiral-cut ham.

"All these other cities are getting buildings taller than 15 stories, and all I'm getting is a spiral beltway!" - Birmingham
Reply With Quote
     
     
  #70  
Old Posted Dec 25, 2009, 6:03 PM
Rail Claimore's Avatar
Rail Claimore Rail Claimore is offline
Registered User
 
Join Date: Jul 2001
Location: Dallas
Posts: 6,231
It will do little to relieve traffic bound for Atlanta from Memphis or vice versa, since there's still no true direct route. Traffic through downtown will still have to deal with the junction and traffic taking the northern bypass will have to go southwest on 59 and catch 459 south to 20 east. Extending the northeast segment to meet I-20 should be in the plans. That or bridging the gap between 65 and the 20/59 split. The latter seems easy enough as the ROW taken would be primarily from industrial areas. The only issue would be the cemetery.
__________________
So am I supposed to sign something here?
Reply With Quote
     
     
  #71  
Old Posted Apr 23, 2010, 7:18 PM
SpawnOfVulcan's Avatar
SpawnOfVulcan SpawnOfVulcan is offline
Cat Enthusiast
 
Join Date: Apr 2008
Location: America's Magic City
Posts: 3,858
Anyone wanna get up and dance a happy dance with me?

Special May 21 ALDOT Project Letting for I-22 Corridor Interchange
__________________
SSP Alabama Metros: Birmingham (City Compilation) - Huntsville - Mobile - Montgomery - Tuscaloosa - Daphne-Fairhope - Decatur

SSP Alabama Universities: Alabama - UAB - Alabama State
Reply With Quote
     
     
  #72  
Old Posted Apr 24, 2010, 2:09 AM
neilson neilson is offline
Registered User
 
Join Date: Apr 2005
Location: Sweet Home Alabama
Posts: 2,621
Quote:
Originally Posted by tredici View Post
Anyone wanna get up and dance a happy dance with me?

Special May 21 ALDOT Project Letting for I-22 Corridor Interchange
Hell to the F'ing YEAH.

So, that means by July, construction begins?

And if it's gonna take 4 years to finish the project then hey that's ok. At least it's gonna get done.
Reply With Quote
     
     
  #73  
Old Posted Apr 24, 2010, 2:39 AM
SpawnOfVulcan's Avatar
SpawnOfVulcan SpawnOfVulcan is offline
Cat Enthusiast
 
Join Date: Apr 2008
Location: America's Magic City
Posts: 3,858
Quote:
Originally Posted by neilson View Post
Hell to the F'ing YEAH.

So, that means by July, construction begins?

And if it's gonna take 4 years to finish the project then hey that's ok. At least it's gonna get done.
Haha, I was actually getting worried that it wasn't gonna happen anymore. I mean, I'd heard some news about it a few months ago, but hadn't heard anything recently. Either way, I'm glad we know it's gonna happen now.
__________________
SSP Alabama Metros: Birmingham (City Compilation) - Huntsville - Mobile - Montgomery - Tuscaloosa - Daphne-Fairhope - Decatur

SSP Alabama Universities: Alabama - UAB - Alabama State
Reply With Quote
     
     
  #74  
Old Posted Jun 17, 2010, 12:32 AM
SpawnOfVulcan's Avatar
SpawnOfVulcan SpawnOfVulcan is offline
Cat Enthusiast
 
Join Date: Apr 2008
Location: America's Magic City
Posts: 3,858
Construction contract awarded for Corridor X completion

The $168.6 Million contract was awarded to Atlanta based Archer Western Contractors. Construction is scheduled to start in July and must be completed by October 15, 2014.

This is the largest project ever undertaken by ALDOT. The interchange will link Future I-22 to I-65 just north of downtown Birmingham.

__________________
SSP Alabama Metros: Birmingham (City Compilation) - Huntsville - Mobile - Montgomery - Tuscaloosa - Daphne-Fairhope - Decatur

SSP Alabama Universities: Alabama - UAB - Alabama State
Reply With Quote
     
     
  #75  
Old Posted Jul 7, 2010, 4:44 AM
SpawnOfVulcan's Avatar
SpawnOfVulcan SpawnOfVulcan is offline
Cat Enthusiast
 
Join Date: Apr 2008
Location: America's Magic City
Posts: 3,858
So, they've slapped the new signage up along I-65 in both north Birmingham and Montgomery. And lemme tell you, they're some nice signs. Very legible from a distance and effective.
__________________
SSP Alabama Metros: Birmingham (City Compilation) - Huntsville - Mobile - Montgomery - Tuscaloosa - Daphne-Fairhope - Decatur

SSP Alabama Universities: Alabama - UAB - Alabama State
Reply With Quote
     
     
  #76  
Old Posted Jul 7, 2010, 12:55 PM
thoraudio's Avatar
thoraudio thoraudio is offline
Witty comment fail
 
Join Date: Dec 2004
Location: Prattville, Alabama
Posts: 2,906
just a note. Anybody who would push for a Montgomery - Meridian extension of 85 for 'economic' reasons needs to ride along the ghost highway and soon to be ghost towns of 5/old 78.

My Grandfather (who passed away in 97) used to talk about how great Corridor X was going to be, and how it would bring prosperity to Jasper. Now, people fly by Dora and Sumiton and the rest at 75 mph and never give them a second thought or any $.
__________________
Abandon all hope. It will help you focus.
Reply With Quote
     
     
  #77  
Old Posted Jul 7, 2010, 1:21 PM
bystander1's Avatar
bystander1 bystander1 is offline
Registered User
 
Join Date: Jun 2003
Location: In the "Alley"
Posts: 1,622
Quote:
Originally Posted by thoraudio View Post
just a note. Anybody who would push for a Montgomery - Meridian extension of 85 for 'economic' reasons needs to ride along the ghost highway and soon to be ghost towns of 5/old 78.
Well, it couldn't hurt any worse.
Reply With Quote
     
     
  #78  
Old Posted Jul 7, 2010, 2:33 PM
Dyingyak Dyingyak is offline
Registered User
 
Join Date: Jul 2009
Location: Birmingham...and all points statewide
Posts: 126
Quote:
Originally Posted by thoraudio View Post
just a note. Anybody who would push for a Montgomery - Meridian extension of 85 for 'economic' reasons needs to ride along the ghost highway and soon to be ghost towns of 5/old 78.

My Grandfather (who passed away in 97) used to talk about how great Corridor X was going to be, and how it would bring prosperity to Jasper. Now, people fly by Dora and Sumiton and the rest at 75 mph and never give them a second thought or any $.
It's a toss-up...you loose the transient tax collections and such but you increase the chance you'll have of business and industrial development within your area because of the improved connectivity.

We've been seeing a lot of chatter at work about potential industrial development in the Jasper area that wouldn't have happened if it were not for Corridor X.

It is a risky trade-off that could pay-off big if the community has the right leadership in place to recruit worthy industry and development. But if the community is insistent on staying stagnant because "we like the things they way they are" they are going to be bleed dry.
__________________
"Make no little plans. They have no magic to stir men's blood and probably themselves will not be realized. Make big plans. Aim high in hope and work. Remembering that a noble, logical diagram once recorded will not die."
Reply With Quote
     
     
  #79  
Old Posted Jul 7, 2010, 3:59 PM
thoraudio's Avatar
thoraudio thoraudio is offline
Witty comment fail
 
Join Date: Dec 2004
Location: Prattville, Alabama
Posts: 2,906
Quote:
Originally Posted by bystander1 View Post
Well, it couldn't hurt any worse.
I'd say it could. And of course, we know that my opinion is fact.

I've never understood why we're in such tizzy to make it easier and faster for people get through, get out, and go around. Is the Montgomery outer loop actually going to ADD to the city? Or just make it easier to avoid?

I've driven 78 to Jasper for years.... When I was a kid, it took about 5 hours, with interstate construction in Bham, and even after I-65 was completed there was the adventure of going from 65 to 20/59 at malfunction junction then trying to cross 4 lanes of traffic in less than a mile to make the 78/Arkadelphia exit.

78 was a fun hour though. The fake cop in Sumiton, Uncle Mort's, that Ice Cream stand/hamburger joint just as you crossed the Black Warrior, the Green Top BBQ and Wesley's Boobie Trap... ok, well I never stopped at that one.

But now, 5/old 78 is a literal ghost town. and nothing is popping up on 78/future 22.

Yes, it only takes me 2 hours from my house to Smith Lake, but is it worth it?

There IS a solution for the Black Belt, but nobody is willing to take the draconian steps required.
__________________
Abandon all hope. It will help you focus.
Reply With Quote
     
     
  #80  
Old Posted Jul 8, 2010, 3:24 AM
bystander1's Avatar
bystander1 bystander1 is offline
Registered User
 
Join Date: Jun 2003
Location: In the "Alley"
Posts: 1,622
I may be tempted to visit Mississippi if we had a faster link to the west.
Reply With Quote
     
     
This discussion thread continues

Use the page links to the lower-right to go to the next page for additional posts
 
 
Reply

Go Back   SkyscraperPage Forum > Regional Sections > United States > Southeast
Forum Jump


Thread Tools
Display Modes

Forum Jump


All times are GMT. The time now is 10:13 AM.

     
SkyscraperPage.com - Archive - Privacy Statement - Top

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2024, vBulletin Solutions, Inc.