Going to council on the 4th, there has been numerous changes since it was first proposed. Height has been clipped a touch as has the number of floors, not much changes in the number of units but they are now listed at 1141. Density is 5.5FSR which is higher then the previous projects (3.5-4FSR).
Sounds like Towers 1, 2 and the mid-rise will be phase 1 (southern half of site) and Tower 3 would be Phase 2. There is a Metro Vancouver sewer line that dissects the site. Phase 1 will house a 23K amenity space in tower 1 that MOSIAC is interested in running. Phase 2 will provide a 10K satellite space for Collingwood Neighbourhood house. There will also be 35K of open space.
The CACs on this site come in at almost $16M. With $11.5M of that for the amenity spaces. $1.5M Cash contribution to allow successful running of the amenity spaces. $1M towards the affordable housing fund. $1M towards local park improvements (Carleton/Collingwood Parks). $1M for a pedestrian/bike bridge over Boundary (BC Parkway upgrade).
There will also be DCL's of $8.3M and public art contribution of $1.3M.
Source:
http://vancouver.ca/ctyclerk/cclerk/...cuments/p2.pdf