Quote:
Originally Posted by gw04
From the webcam it looks like they're working on installing windows on two floors at the same time. It looks like they'll spray the fireproofing on after the windows, similar to what was done around floors 42 and 43 after the crane was removed in that area.
|
Confirmed they installed at least one floor of glass today on the East side. Well almost anyway, looks like 2 or 3 windows left on the North East end.