HomeDiagramsDatabaseMapsForum About
     

Go Back   SkyscraperPage Forum > Regional Sections > Asia-Pacific > Taiwan


 

 
Thread Tools Display Modes
     
     
Prev Previous Post   Next Post Next
     
     
  #1  
Old Posted Apr 20, 2018, 12:22 PM
pttwarrior pttwarrior is offline
Registered User
 
Join Date: Jun 2010
Posts: 2,077
Kaohsiung Metropolitan Area Underground Railway Project | 2006~2018

Source: https://www.rrb.gov.tw/04100.aspx?id=9&lan=en


Kaohsiung Metropolitan Area Underground Railway Project (2016-07-18 updated)

Summary:
The Kaohsiung Project, extending from Baozhen Road, south of Zuoying Station, to Zhengyi Road, covers a distance of approximately 9.75 kilometers. Alongside a twin-track tunnel, it will construct five commuter stations—Fine Arts Museum, Gushan, Sankuaicuo, Minzu and National Science and Technology Museum —as well as move underground Kaohsiung Station (R11 Station of Kaohsiung MRT included). The Zuoying Project runs from the new Zuoying Station to Baozhen Road, a length of 4.13 kilometers, with the Neiwei and Zuoying stations to be moved underground. The Fengshan Project is the Kaohsiung project extension to Fengshan. It starts from the east of Dashun Overpass to Dazhi Overpass at Fengshan zone, covering a total length of about 4.3 kilometers. The project includes adding one new underground commuter station Zhengyi/Chengqing station and the Fengshan Station underground. The Duration for the project is from 2006 to 2018. In 2016, subsequent works are under way on stations, tunnels and rail tracks.

Performance:
The river base engineering work for the tunnel that crosses the Love River has been completed. In addition, underground structural engineering work for the permanent MRT R11 Station, which is an integrated structure at Kaohsiung Station, has been handed over to Kaohsiung Rapid Transit Corporation (KRTC) to lay the tracks and carry out other related work. Construction on the southern-section tunnel on Zhonghua 1st Road has been completed on November 16, 2014. The Fengshan Project making shift platforms and temporary tracks were opened for operation on January 2014 for the first phase and completed the second phases on June 2014. All Constructions on the Kaohsiung Project (included Zuoying and Fengshan Project) are proceeding.






Fine Art Museum station



Gushan station



Sankuaicuo station



Dashun station



Minzu station
__________________
"Asia's New Bay Area #Kaohsiung 2021" https://www.youtube.com/watch?v=2i2NhC695D0
"Asia's New Bay Area - 2020 Horizon Open House Quick Review" https://www.youtube.com/watch?v=iVn16Cg1zXE
Reply With Quote
     
     
End
 
 
 

Go Back   SkyscraperPage Forum > Regional Sections > Asia-Pacific > Taiwan
Forum Jump


Thread Tools
Display Modes

Forum Jump


All times are GMT. The time now is 9:06 AM.

     
SkyscraperPage.com - Archive - Privacy Statement - Top

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2024, vBulletin Solutions, Inc.