2609 St Claude Ave·Renovation (Non-Structural) ·Ref Code: 48DZRY
Print Summary Submit Add to Watch List
Type:
Renovation (Non-Structural)
Applicant:
Diane Hickman
Status:
Application Submitted
Date Filed:
12/12/2017
Closed:
No
Description
This application is for HDLC REVIEW ONLY to renovate an existing McDonalds




323 Verret St·Renovation (Structural) ·Ref Code: 51EKS4
Print Summary Submit Add to Watch List
Type:
Renovation (Structural)
Applicant:
Joe Peraino
Status:
Application Submitted
Date Filed:
12/12/2017
Closed:
No
Description
Renovate existing two-story building, including new rooftop addition and exterior cladding materials.





2014 Magazine St·Renovation (Non-Structural) ·Ref Code: 5DX20N
Print Summary Submit Add to Watch List
Type:
Renovation (Non-Structural)
Applicant:
M Carbine Restorations, Ltd
Status:
Application Submitted
Date Filed:
12/12/2017
Closed:
No
Description
Supplementary permit to open and active Permit # 17-27336-RNVN to increase the scope and value of work that was discovered upon completion of interior demolition conducted under Permit # 17-19167-DEMI. The increased scope of the work includes additional air conditioning, electrical, upgrade to proposed elevator, additional masonry, labor and materials which amounts to an increase in cost in the amount of $492,000.00.

djsnola
3000 St Claude Ave·Renovation (Structural) ·Ref Code: 1BY7YY
Print Summary Submit Add to Watch List
Type:
Renovation (Structural)
Applicant:
EDR Architects
Status:
Application Submitted
Date Filed:
12/12/2017
Closed:
No
Description
Preliminary permit application for HDLC review and conceptual approval to renovate five existing buildings into a hotel, including limited new construction. This project includes five parcels including municipal address 3000, 3014, 3020-22, 3024-26, and 3030-32 St. Claude Avenue. Not a building permit application.



Reply With Quote
     
     
  #13302  
Old Posted Dec 13, 2017, 3:06 AM
prokowave prokowave is offline
Registered User
 
Join Date: Jun 2010
Posts: 526
Final Phase of the Iberville Redevelopment gets funding, bringing it close to the 821 unit goal:
http://www.theadvocate.com/new_orlea...273b6b7b0.html
Reply With Quote
     
     
  #13303  
Old Posted Dec 13, 2017, 6:03 PM
tennis1400 tennis1400 is offline
-
 
Join Date: Aug 2003
Posts: 7,474
Canal crossing:









Springhill/ Towneplace Suites

Buckhoist is coming down today so must be entering final stretch to open next month



Reply With Quote
     
     
  #13304  
Old Posted Dec 13, 2017, 10:01 PM
prokowave prokowave is offline
Registered User
 
Join Date: Jun 2010
Posts: 526
It will be interesting to see if anyone can do something with the block across from Canal Crossing and the Budget car rental lot farther down Canal.

Looks like Jaeger is moving his attention to the Royal Cosmopolitan hotel project:
http://realestate.nola.com/realestat...art_river_home

That project just seems like it will be a pain to go through the various approval processes. Surprised we haven't heard anything about the Plaza Tower or the Convention Center project.
Reply With Quote
     
     
  #13305  
Old Posted Dec 13, 2017, 10:29 PM
tennis1400 tennis1400 is offline
-
 
Join Date: Aug 2003
Posts: 7,474
Quote:
Originally Posted by prokowave View Post
It will be interesting to see if anyone can do something with the block across from Canal Crossing and the Budget car rental lot farther down Canal.

Looks like Jaeger is moving his attention to the Royal Cosmopolitan hotel project:
http://realestate.nola.com/realestat...art_river_home

That project just seems like it will be a pain to go through the various approval processes. Surprised we haven't heard anything about the Plaza Tower or the Convention Center project.
that guy is seriously involved in everything... im always on the fence with buildings that tall in that area. considering all the available surface level parking we have around town and not too far from there it would be nice to develop those first but
Reply With Quote
     
     
  #13306  
Old Posted Dec 14, 2017, 12:23 AM
jjslonaker jjslonaker is offline
NOLA Razorback
 
Join Date: Jan 2012
Location: New Orleans, LA
Posts: 457
Final Ferry Terminal Plans

Reply With Quote
     
     
  #13307  
Old Posted Dec 14, 2017, 12:44 AM
tennis1400 tennis1400 is offline
-
 
Join Date: Aug 2003
Posts: 7,474
Looks like a big improvement to me:

opening that area up will really help traffic flow









Reply With Quote
     
     
  #13308  
Old Posted Dec 14, 2017, 2:01 AM
hightech1217 hightech1217 is offline
Registered User
 
Join Date: Apr 2013
Location: Louisiana/Texas
Posts: 54
Odeon - South Market



Found this rendering of the Odeon from an alternate perspective on NOLA.com
Reply With Quote
     
     
  #13309  
Old Posted Dec 14, 2017, 3:23 AM
tennis1400 tennis1400 is offline
-
 
Join Date: Aug 2003
Posts: 7,474
Quote:
Originally Posted by hightech1217 View Post


Found this rendering of the Odeon from an alternate perspective on NOLA.com
interesting ... that rendering sure makes it look like the building slowly slopes outwards at the top.. the windows seem to reaffirm that hmm ... well the odeon was seeking bza waivers this week and received them.. so expect that one to start in the new year
Reply With Quote
     
     
  #13310  
Old Posted Dec 14, 2017, 4:53 AM
tennis1400 tennis1400 is offline
-
 
Join Date: Aug 2003
Posts: 7,474
MAGNOLIA BRIDGE REFURBISHMENT PROJECT TO BEGIN IN EARLY 2018



The City and State are currently processing contracts to refurbish the Magnolia Bridge, which crosses Bayou St. John near Cabrini High School. Construction is tentatively scheduled to begin in early 2018.




The project scope of work includes:

Cleaning and painting the superstructure and decking;
Sealing cracks in the sub-structure; and
Replacing decking, beams, and other structural components.

The Magnolia Bridge was one of the first bridges to provide access over Bayou St. John and is often used for weddings and other special events. The project is cost-shared with the Regional Planning Commission and the Department of Transportation and Development using Federal funds.

Details of the construction sequencing and timeline will be available at the pre-construction public meeting which is tentatively scheduled for February 2018. Email RoadWork@nola.gov to be added to the Magnolia Bridge contact list.
Reply With Quote
     
     
  #13311  
Old Posted Dec 15, 2017, 2:41 AM
jjslonaker jjslonaker is offline
NOLA Razorback
 
Join Date: Jan 2012
Location: New Orleans, LA
Posts: 457
Quote:
Originally Posted by tennis1400 View Post
interesting ... that rendering sure makes it look like the building slowly slopes outwards at the top.. the windows seem to reaffirm that hmm ... well the odeon was seeking bza waivers this week and received them.. so expect that one to start in the new year
The corner windows definitely get larger as they go up.. If it actually does slope out that should really add some drama to that building/skyline
Reply With Quote
     
     
  #13312  
Old Posted Dec 15, 2017, 6:08 PM
rschin2 rschin2 is offline
Registered User
 
Join Date: Feb 2010
Posts: 60
Odeon

Has the Odeon's height been given yet? I'm hoping for at least 350'!
Reply With Quote
     
     
  #13313  
Old Posted Dec 15, 2017, 6:31 PM
hightech1217 hightech1217 is offline
Registered User
 
Join Date: Apr 2013
Location: Louisiana/Texas
Posts: 54
Quote:
Originally Posted by rschin2 View Post
Has the Odeon's height been given yet? I'm hoping for at least 350'!
From the sketches posted earlier on Nov. 7, the roof is at 323'-8".
Reply With Quote
     
     
  #13314  
Old Posted Dec 15, 2017, 10:09 PM
Tchoupitoulas Tchoupitoulas is offline
Registered User
 
Join Date: May 2015
Location: New Orleans
Posts: 70
Here's the December aerial update for the new airport terminal:

Reply With Quote
     
     
  #13315  
Old Posted Dec 17, 2017, 6:00 PM
tennis1400 tennis1400 is offline
-
 
Join Date: Aug 2003
Posts: 7,474
Quote:
Originally Posted by rschin2 View Post
Has the Odeon's height been given yet? I'm hoping for at least 350'!
Looking at what else has been built in city heightwise the odeon should be tallest building built since 1988 and when whats now called benson tower was built
Reply With Quote
     
     
  #13316  
Old Posted Dec 17, 2017, 7:37 PM
ardecila's Avatar
ardecila ardecila is offline
TL;DR
 
Join Date: Jun 2006
Location: the city o'wind
Posts: 16,368
The Ferry Terminal looks good. The floating roof reminds me of the old Rivergate. I wish they could do something about the floodwall, though... maybe put removable panels in this section or something so there's not a giant wall blocking views out Canal Street.

Wait a minute, is the original Eads Plaza building getting demolished? I don't see it between the ferry terminal and the fountain in those renderings. The only thing remaining is that awful claptrap Crazy Lobster.

Quote:
Originally Posted by tennis1400 View Post
interesting ... that rendering sure makes it look like the building slowly slopes outwards at the top.. the windows seem to reaffirm that hmm ... well the odeon was seeking bza waivers this week and received them.. so expect that one to start in the new year
That's just an optical illusion because the rendering has no perspective in the vertical direction. You can confirm that, just lay another dialog box over the rendering and you can see it's perfectly vertical.
__________________
la forme d'une ville change plus vite, hélas! que le coeur d'un mortel...
Reply With Quote
     
     
  #13317  
Old Posted Dec 18, 2017, 12:11 AM
Illithid Dude's Avatar
Illithid Dude Illithid Dude is offline
Paramoderator
 
Join Date: Nov 2010
Location: Santa Monica / New York City
Posts: 3,019
I know this might be a bit off topic, but are there any plans to extend the streetcar? It seems to me that New Orleans has the grounds for a great and comprehensive streetcar system, if only they invest a little more in it.
Reply With Quote
     
     
  #13318  
Old Posted Dec 18, 2017, 2:16 AM
SlidellWx's Avatar
SlidellWx SlidellWx is offline
Registered User
 
Join Date: Nov 2005
Location: New Orleans
Posts: 1,551
The Rampart and Loyola streetcar lines are fairly new. Canal line was just extended slightly to connect to a transfer area north of City Park Ave. NORTA has plans to extend THE Rampart line further down St. Claude if money becomes available. Not sure what else is in the long term plan.
__________________
Slidell, LA...The Camellia City
Reply With Quote
     
     
  #13319  
Old Posted Dec 18, 2017, 4:04 AM
prokowave prokowave is offline
Registered User
 
Join Date: Jun 2010
Posts: 526
You may see a few extensions of the Rampart/Loyola and Riverfront lines, but anything new would be a hard sell. It’s hugely expensive and no faster than a bus. That being said they are exploring ways to speed up the streetcar lines and also consider bus rapid transit in the future.
Reply With Quote
     
     
  #13320  
Old Posted Dec 18, 2017, 4:57 AM
tennis1400 tennis1400 is offline
-
 
Join Date: Aug 2003
Posts: 7,474
Quote:
Originally Posted by prokowave View Post
You may see a few extensions of the Rampart/Loyola and Riverfront lines, but anything new would be a hard sell. It’s hugely expensive and no faster than a bus. That being said they are exploring ways to speed up the streetcar lines and also consider bus rapid transit in the future.
I would tend to agree.. future expansions that are likely are the riverfront line down to whatever happens with the convention center property and extensions down rampart to at least press street
Reply With Quote
     
     
This discussion thread continues

Use the page links to the lower-right to go to the next page for additional posts
 
 
Reply

Go Back   SkyscraperPage Forum > Global Projects & Construction > City Compilations
Forum Jump



Forum Jump


All times are GMT. The time now is 6:12 AM.

     
SkyscraperPage.com - Archive - Privacy Statement - Top

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2024, vBulletin Solutions, Inc.