HomeDiagramsDatabaseMapsForum About
     

Go Back   SkyscraperPage Forum > Discussion Forums > Buildings & Architecture > Completed Project Threads Archive


    Rainier Square Tower in the SkyscraperPage Database

Building Data Page   • Comparison Diagram   • Seattle Skyscraper Diagram

Map Location
Seattle Projects & Construction Forum

 

 
Thread Tools Display Modes
     
     
  #41  
Old Posted May 10, 2015, 11:28 PM
chris08876's Avatar
chris08876 chris08876 is online now
NYC/NJ/Miami-Dade
 
Join Date: Jul 2013
Location: Riverview Estates Fairway (PA)
Posts: 45,674
It should be 800 + feet. Even with the modified base. Thing with some projects is the constant flip flopping between data concerning floors and height. Some say this, others say that, but the general consensus agrees that this is over 800 feet.

That old figure was when it was 50 floors versus the new 58. That was changed when the design received an update.
     
     
  #42  
Old Posted Jun 25, 2015, 10:04 AM
chris08876's Avatar
chris08876 chris08876 is online now
NYC/NJ/Miami-Dade
 
Join Date: Jul 2013
Location: Riverview Estates Fairway (PA)
Posts: 45,674
Design board OKs 58-story downtown tower with changes

Quote:
Whatever you think of the shape of the new Rainier Square tower, a proposed 58-story complex at 1301 5th Ave. in downtown Seattle, a city review board mostly signed off Tuesday on the structure’s final contours.

Designs for the $600 million project show a tower rising at Union Street and Fourth Avenue to 850 feet, spanning Union from Fourth to Fifth avenues.

In contrast to a standard, block-like tower, the proposed building would start with a wide base and become slimmer at higher floors. Instead of a flat plane, the tower’s east facade would be scooped and taper upward like “an accordion,” said developer Greg Johnson, president of Wright Runstad & Co.

Previously the board had criticized the proposed tower’s scooped east facade for blocking views of the tapering white pedestal base of the adjacent Rainier Tower.

On Tuesday evening, the board said that a proposal by Wright Runstad and its architect, NBBJ, to start the scoop at the 7th floor instead of the 10th floor didn’t do enough to make the pedestal next door more visible. The board recommended the developer start the scoop at the 4th floor instead.

The developer’s revised plan also eliminates a curved indentation on the southeast corner of Rainier Square, according to Wright Runstad’s filing with the city, after the board said it “pales in contrast to the dramatic lift expressed by the Rainier Tower base.”

But the Rainier Square tower design retains a dramatic curved indentation 280 feet in height on the northwest corner that the developer says will be visible from the Space Needle and Elliott Bay. The so-called “carve” is also a modern nod to Rainier Tower’s tapered pedestal.

Now Wright Runstad will revise its permit application, for approval by the director of the Department of Plannning and Development. It still expects to break ground late next year and open the tower in late 2018.

Aside from the design changes, Seattle’s second-tallest skyscraper would offer luxury apartments that would be the highest in the city. The developer said its decision to put residences above 450 feet also means it must pay about $5.3 million to the city’s affordable-housing fund under an incentive zoning program.

In total, Wright Runstad will pay the city about $12.3 million in incentive-zoning fees to develop a tower with greater bulk and height than standard zoning allows.

“It’s a case where the incentive zoning is actually working,” Johnson said.
===========================
http://www.seattletimes.com/business...-with-changes/
     
     
  #43  
Old Posted Jun 25, 2015, 2:02 PM
Dale Dale is offline
Registered User
 
Join Date: Dec 2001
Location: Charlotte
Posts: 4,769
They expect to complete the tower in 24 months ?
     
     
  #44  
Old Posted Jun 25, 2015, 8:41 PM
chris08876's Avatar
chris08876 chris08876 is online now
NYC/NJ/Miami-Dade
 
Join Date: Jul 2013
Location: Riverview Estates Fairway (PA)
Posts: 45,674
Could theoretically happen. But there's also been many projects where we've heard completion dates being off by years. When it starts rising, then timetables make sense. For now, its just all talk.

Quote:
It still expects
... So it might or might not.
     
     
  #45  
Old Posted Dec 4, 2015, 7:15 PM
JiminyCricket II JiminyCricket II is offline
good time not a long time
 
Join Date: Sep 2002
Location: San Jose
Posts: 3,675
From todays DJC.

http://www.djc.com/news/re/12084211.html

December 4, 2015

Wright Runstad plans 2017 start for $600M Rainier Square project
By JOURNAL STAFF

Wright Runstad & Co. plans to start construction in early 2017 on the nearly $600 million redevelopment of Rainier Square, including a new 58-story tower.

The Seattle firm said in a press release that the Seattle Department of Planning and Development has approved the master use permit. If the decision is not appealed within 14 days, the permit will be issued.

Wright Runstad is developing the project for its own account on land owned by the University of Washington under an 80-year ground lease. After that period, the UW will own it.

The tower will contain more than 750,000 square feet of office space and about 200 apartments.

The project also includes 30,000 square feet of restaurants and retail shops, and a 155-room premium hotel, which will be in a separate 12-story building. There will also be underground parking for over 1,200 cars.

Wright Runstad said the first tenants will occupy the tower in late 2018.

“We are seeing strong office and retail tenant demand for Rainier Square,” said Company President Greg Johnson. “We have several active negotiations underway, including with a major hotel operator.”

The firm declined to name the operator.

NBBJ is designing the project, Lease Crutcher Lewis is the general contractor and Magnusson Klemencic Associates is the structural engineer.

Johnson said the design incorporates feedback from the design review board for a bolder, more dramatic curve on the tower's east face.

“The exciting visual interplay between the new tower and existing Rainier Tower makes Rainier Square a strong complement to one of the city's most iconic buildings,” he said.

The company said the project will contribute about $11.5 million for affordable housing, open space, and support for childcare and landmarks.

Wright Runstad said union representatives from the Iron Workers, Carpenters and Operating Engineers expressed support.

Rainier Square is part of the UW's Metropolitan Tract, which covers about 11 acres on more than four city blocks. This was the land where the university was located before moving to its present location in 1895.

The tract also includes Fairmont Olympic Hotel, 5th Avenue Theater and the IBM Building.

Downtown Seattle Association President and CEO Jon Scholes said streetscape improvements, new retail, restaurants and large-scale development will help transform the city's core.

“There's a lot of momentum here, and a number of these projects are contributing to affordable housing, providing even greater benefit to the community,” he said.

Wright Runstad & Co. develops and manages office buildings, primarily in the Pacific Northwest.


Rainier Square from the corner of Fourth and University. The 12-story hotel is in the foreground, and the office and residential tower is behind.



The tower will have more than 750,000 square feet of office space and about 200 apartments.
     
     
  #46  
Old Posted Dec 5, 2015, 4:27 AM
TallBob TallBob is offline
Registered User
 
Join Date: Sep 2011
Posts: 3,135
2017 start I hear on this one.... Good news!
     
     
  #47  
Old Posted Dec 5, 2015, 4:39 AM
timpdx's Avatar
timpdx timpdx is offline
Registered User
 
Join Date: Feb 2015
Location: Los Angeles
Posts: 365
Quote:
Originally Posted by TallBob View Post
2017 start I hear on this one.... Good news!
Was hoping to hear a sooner start, by 2017 all the fun may be over (new starts, large projects) we will see, really want this one to go!
__________________
Travel, Scenic & Architecture Photos at: http://www.pixelmap.com/
     
     
  #48  
Old Posted Dec 5, 2015, 7:56 PM
Zapatan's Avatar
Zapatan Zapatan is offline
DENNAB
 
Join Date: Aug 2009
Location: NA - Europe
Posts: 6,009
Quote:
Originally Posted by timpdx View Post
Was hoping to hear a sooner start, by 2017 all the fun may be over (new starts, large projects) we will see, really want this one to go!
Yea I was hoping to hear sooner too but at least it sounds like it'll get built.
     
     
  #49  
Old Posted Dec 28, 2015, 10:49 PM
chris08876's Avatar
chris08876 chris08876 is online now
NYC/NJ/Miami-Dade
 
Join Date: Jul 2013
Location: Riverview Estates Fairway (PA)
Posts: 45,674
New Rendering: (Full Screen por favor)


Credit: http://www.rainiersquare.com/project/photo-gallery/
     
     
  #50  
Old Posted Dec 29, 2015, 6:41 AM
TallBob TallBob is offline
Registered User
 
Join Date: Sep 2011
Posts: 3,135
Very, Very nice!! When are they planning to start?
     
     
  #51  
Old Posted Dec 29, 2015, 3:42 PM
BVictor1's Avatar
BVictor1 BVictor1 is offline
Registered User
 
Join Date: Sep 2002
Location: Chicago
Posts: 10,391
Quote:
Originally Posted by TallBob View Post
Very, Very nice!! When are they planning to start?
You yourself posted that you heard the start would be 2017. The article above your post says 2017 so why ask the question again?
__________________
titanic1
     
     
  #52  
Old Posted Dec 29, 2015, 5:06 PM
mrnyc mrnyc is offline
cle/west village/shaolin
 
Join Date: Jul 2006
Posts: 11,530
the cladding reminds me of the diamond district bldg glass. could be very nice!
     
     
  #53  
Old Posted Dec 29, 2015, 5:15 PM
InlandEmpire's Avatar
InlandEmpire InlandEmpire is offline
Cascadia Rising
 
Join Date: May 2005
Location: Seattle
Posts: 1,065
Agreed, while the shape isn't too groundbreaking I think the details will be what makes it stand out - especially if the cladding can catch the sunlight in any way close to what the rendering shows.
__________________
www.kexp.org
     
     
  #54  
Old Posted Dec 29, 2015, 5:55 PM
giantSwan's Avatar
giantSwan giantSwan is offline
Registered User
 
Join Date: Dec 2006
Location: Northeast, United States
Posts: 294
Wow. Elegant! I love it!
     
     
  #55  
Old Posted Dec 30, 2015, 5:07 AM
TallBob TallBob is offline
Registered User
 
Join Date: Sep 2011
Posts: 3,135
BVictor1: I completely forgot....and don't usually re read past posts. Hope it didn't put you out much.... I missed the course in school of how to be perfect!
     
     
  #56  
Old Posted Feb 4, 2016, 2:18 PM
tateyb's Avatar
tateyb tateyb is offline
Registered User
 
Join Date: Aug 2015
Location: t dot
Posts: 194
Rainier Square Tower to Start Construction in 2017

Quote:
Along fourth Avenue, the developer intends to construct a separate 12-storey, 155-room high-end hotel featuring the same reflective glass facade. No announcements have been made so far as to which hotel group will take up the space. 2,800 square metres of retail spaces will occupy the base of both buildings when the project is eventually complete in 2019. Following the recent Seattle Department of Planning and Development approval for the complex, Wright Runstad & Company announced that construction on the project will start in early 2017, with the first tenants moving in by late 2018.
     
     
  #57  
Old Posted Oct 29, 2016, 6:18 PM
chris08876's Avatar
chris08876 chris08876 is online now
NYC/NJ/Miami-Dade
 
Join Date: Jul 2013
Location: Riverview Estates Fairway (PA)
Posts: 45,674
     
     
  #58  
Old Posted Oct 30, 2016, 5:13 PM
SLO's Avatar
SLO SLO is offline
REAL Kiwi!
 
Join Date: Jan 2007
Location: California & Texas
Posts: 17,085
Really nice tower, and a great add for Seattle!
__________________
'Don't underestimate Joe's ability to f*ck things up' - Barack Obama
     
     
  #59  
Old Posted Dec 18, 2016, 4:29 PM
chris08876's Avatar
chris08876 chris08876 is online now
NYC/NJ/Miami-Dade
 
Join Date: Jul 2013
Location: Riverview Estates Fairway (PA)
Posts: 45,674
ROCK BOTTOM BREWERY IN SEATTLE IS CLOSING

Quote:
Greetings Beer Lovers,

It is with a heavy heart that I must announce the closing of the Rock Bottom Brewery in Seattle. Due to the impending redevelopment of the Rainier Square property, we will permanently close our doors at 5:00 PM on Saturday, December 31, 2016.

I would like to take this opportunity to personally thank all of the brewers and beer lovers who have enriched my life and have taught me more about beer and life than I could ever recount here. I cannot express how grateful that I am for the opportunity to hone my craft and for the support that all of you have given over my 18+ years brewing in Bellevue and Seattle.
=============================
http://www.washingtonbeerblog.com/ro...le-is-closing/
     
     
  #60  
Old Posted Jan 22, 2017, 11:33 PM
Orlando's Avatar
Orlando Orlando is offline
Registered User
 
Join Date: Nov 2007
Location: Seattle, WA
Posts: 3,979
Is this project going forward? It's been very, very quiet.
     
     
This discussion thread continues

Use the page links to the lower-right to go to the next page for additional posts
 
 
 

Go Back   SkyscraperPage Forum > Discussion Forums > Buildings & Architecture > Completed Project Threads Archive
Forum Jump


Thread Tools
Display Modes

Forum Jump


All times are GMT. The time now is 10:22 AM.

     
SkyscraperPage.com - Archive - Privacy Statement - Top

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2024, vBulletin Solutions, Inc.