Quote:
Originally Posted by Whu215
This building doesn't go typical till the 10th floor. There are lots of changes until then on each floor. Usually on a poured in place building once you go typical it's around a 3 day cycle which means a floor is completed every 3 days.
This is when I start having fun being up high on the edge.
And I got my worker tattoo
|
Thanks for the info! Will be great to see this start to shoot up this spring. I like the tattoo.