  #921  
Old Posted Feb 23, 2017, 5:19 PM
goodgrowth goodgrowth is offline
Registered User
 
Join Date: Mar 2010
Posts: 2,138
Quote:
Originally Posted by jjavman View Post
Read back through this thread, and you will see the roundabout mentioned.
Hickman is referring only to the roundabout, when he says he hopes to see it finished this year. That would be a city project, and has been on the books for a while. It includes a re-routing of Blackmarsh Road.

Not to be a pessimist, but I wouldn't hold my breath on that either, if last years work on Blackmarsh Road is any indication.

I dunno...reading the article it sounds like he was referring to more than just the roundabout..

"A St. John's city councillor hopes that an early tender for paving of the Gushue Highway Extension to the west end will lead to completion by fall.

Councillor Sandy Hickman sees the extension as an important project which serves a large number of people."
Reply With Quote
     
     
  #922  
Old Posted Feb 23, 2017, 8:22 PM
rthomasd rthomasd is offline
Registered User
 
Join Date: Mar 2012
Posts: 426
Quote:
Originally Posted by jjavman View Post
Read back through this thread, and you will see the roundabout mentioned.
Hickman is referring only to the roundabout, when he says he hopes to see it finished this year. That would be a city project, and has been on the books for a while. It includes a re-routing of Blackmarsh Road.

Not to be a pessimist, but I wouldn't hold my breath on that either, if last years work on Blackmarsh Road is any indication.

I posted the diagram on May25, 2016 on page 43 of this forum. Also the roundabout on that diagram was labelled "by others" and we assumed that to the city that meant being done by the Govt.
Reply With Quote
     
     
  #923  
Old Posted Feb 24, 2017, 11:10 AM
J_Murphy's Avatar
J_Murphy J_Murphy is offline
Registered User
 
Join Date: Mar 2012
Location: St. John's, NL
Posts: 1,293
Quote:
Originally Posted by rthomasd View Post
I posted the diagram on May25, 2016 on page 43 of this forum. Also the roundabout on that diagram was labelled "by others" and we assumed that to the city that meant being done by the Govt.


[/URL][/QUOTE]
Reply With Quote
     
     
  #924  
Old Posted Feb 24, 2017, 12:10 PM
wmemeadusjr wmemeadusjr is offline
Registered User
 
Join Date: Dec 2009
Posts: 333
At this point, I'm not holding my breath on any news regarding the Team Gushue Highway. A concrete median with lights, pavement, guard rails, signage, interchanges, roundabouts? All completed this year? Come on people. LOL
Reply With Quote
     
     
  #925  
Old Posted Feb 24, 2017, 3:52 PM
statbass statbass is offline
Registered User
 
Join Date: May 2011
Location: St. John's
Posts: 1,650
Quote:
Originally Posted by wmemeadusjr View Post
At this point, I'm not holding my breath on any news regarding the Team Gushue Highway. A concrete median with lights, pavement, guard rails, signage, interchanges, roundabouts? All completed this year? Come on people. LOL
All I'm looking for this year is meaningful movement. If that can be achieved I will be happy. Seeing next to nothing being done year after year has gone on way too long.
Reply With Quote
     
     
  #926  
Old Posted Feb 24, 2017, 4:06 PM
jjavman jjavman is offline
Registered User
 
Join Date: Apr 2011
Location: NL
Posts: 456
Quote:
Originally Posted by rthomasd View Post
I posted the diagram on May25, 2016 on page 43 of this forum. Also the roundabout on that diagram was labelled "by others" and we assumed that to the city that meant being done by the Govt.
I took it the opposite way, in that the diagram/schematic is a Dept. of Transportation drawing, and "by others" meant the city. Was it not also discussed in a council meeting way back somewhere in this thread? Could be wrong.

In any case, let's hope someone gets off their asses this year.

Reply With Quote
     
     
  #927  
Old Posted Feb 24, 2017, 6:07 PM
rthomasd rthomasd is offline
Registered User
 
Join Date: Mar 2012
Posts: 426
Quote:
Originally Posted by jjavman View Post
I took it the opposite way, in that the diagram/schematic is a Dept. of Transportation drawing, and "by others" meant the city. Was it not also discussed in a council meeting way back somewhere in this thread? Could be wrong.

In any case, let's hope someone gets off their asses this year.

These charts are from the City's meeting about the Blackmarsh Rd watermain project and when I asked the facilitator who 'others' were, she said Prov Govt.

There was some 'grubbing' done last year where the roundabout is to be, but no sign of any work since. I think they decided to do the watermain progrect and that put a stop to any other roadwork in the area, including TGH. I'm not sure they actually finished the watermain project before the winter set-in, there's still equipment on site and perhaps some work to do at the eastern end of the project on Empire.
Reply With Quote
     
     
  #928  
Old Posted Feb 24, 2017, 10:11 PM
jjavman jjavman is offline
Registered User
 
Join Date: Apr 2011
Location: NL
Posts: 456
Quote:
Originally Posted by rthomasd View Post
These charts are from the City's meeting about the Blackmarsh Rd watermain project and when I asked the facilitator who 'others' were, she said Prov Govt.

There was some 'grubbing' done last year where the roundabout is to be, but no sign of any work since. I think they decided to do the watermain progrect and that put a stop to any other roadwork in the area, including TGH. I'm not sure they actually finished the watermain project before the winter set-in, there's still equipment on site and perhaps some work to do at the eastern end of the project on Empire.
You're right. I found the relative city meeting minutes from July 2, 2014.

The confusion arises because it was the city who struck a committee to study a roundabout.
Here is the relevant excerpt:

.
Blackmarsh Road and Team Gushue Highway Extension

Road
Realignments

Delegation from City’s Construction Engineering Division.
The Committee Mr. Scott Winsor who gave a presentation outlining options for the
design of the intersections at
Empire Avenue and Georges Pond Road with Blackmarsh
Road.
Three Options tabled for consideration were:

Option 1

2 Way Stop Controlled intersec
tion

Option 2

Signalized Intersection

Option 3

Roundabout
Based on a Level of Service (LOS) Analysis, option 3 is the preferred choice
Recommendation
On a motion put forth by Councillor Puddister, the Committee recommends
approval of a roundabout design for the intersections at Empire Avenue and
Georges Pond Road with Blackmarsh Road and that Hatch, Mott and McDonald
be requested to proceed with the detailed design package to be used for
construction by the Province.



cheers,

JJ
Reply With Quote
     
     
  #929  
Old Posted Mar 11, 2017, 3:05 PM
jjavman jjavman is offline
Registered User
 
Join Date: Apr 2011
Location: NL
Posts: 456
Finally, something smart.

Reply With Quote
     
     
  #930  
Old Posted Mar 14, 2017, 8:40 PM
rthomasd rthomasd is offline
Registered User
 
Join Date: Mar 2012
Posts: 426
So, just saw this on Gov't website. Maybe there's hope yet to see TGH finished by 2020
===================

Tender 004-16TSB
Description:

Construction of a 38 meter six lane single span prestressed concrete girder overpass on Team Gushue Highway over Topsail Road. This project will be jointly funded by both levels of government under the Building Canada Fund & carried out by the Government of Newfoundland & Labrador. Purchase Price $45.20
Reply With Quote
     
     
  #931  
Old Posted Mar 15, 2017, 12:00 AM
Offshore1 Offshore1 is offline
Registered User
 
Join Date: Feb 2012
Location: NL
Posts: 209
Quote:
Originally Posted by rthomasd View Post
So, just saw this on Gov't website. Maybe there's hope yet to see TGH finished by 2020
===================

Tender 004-16TSB
Description:

Construction of a 38 meter six lane single span prestressed concrete girder overpass on Team Gushue Highway over Topsail Road. This project will be jointly funded by both levels of government under the Building Canada Fund & carried out by the Government of Newfoundland & Labrador. Purchase Price $45.20
Brad Gushue won the Olympic Gold Medal and the government named a highway after him and the team. Now that he's won the Brier the government should honour them by FINISHING the highway that has his name.
Reply With Quote
     
     
  #932  
Old Posted Mar 15, 2017, 2:32 PM
goodgrowth goodgrowth is offline
Registered User
 
Join Date: Mar 2010
Posts: 2,138
Quote:
Originally Posted by rthomasd View Post
So, just saw this on Gov't website. Maybe there's hope yet to see TGH finished by 2020
===================

Tender 004-16TSB
Description:

Construction of a 38 meter six lane single span prestressed concrete girder overpass on Team Gushue Highway over Topsail Road. This project will be jointly funded by both levels of government under the Building Canada Fund & carried out by the Government of Newfoundland & Labrador. Purchase Price $45.20
Six lane single span? interesting...

So basically like the Kenmount/Topsail overpass in Paradise but even bigger?
Reply With Quote
     
     
  #933  
Old Posted Mar 16, 2017, 3:01 PM
statbass statbass is offline
Registered User
 
Join Date: May 2011
Location: St. John's
Posts: 1,650
Quote:
Originally Posted by Offshore1 View Post
Brad Gushue won the Olympic Gold Medal and the government named a highway after him and the team. Now that he's won the Brier the government should honour them by FINISHING the highway that has his name.
Yes and hopefully the section that is finished gets some much needed re-surfacing. That section of TGH is atrocious!
Reply With Quote
     
     
  #934  
Old Posted Mar 17, 2017, 1:18 PM
goodgrowth goodgrowth is offline
Registered User
 
Join Date: Mar 2010
Posts: 2,138
$3 Billion in infrastructure spending over next 5 years:

http://vocm.com/news/3-billion-in-in...ing-announced/

of that $688.2 million is for "Transportation Infrastrcture"
Reply With Quote
     
     
  #935  
Old Posted Mar 17, 2017, 6:31 PM
rthomasd rthomasd is offline
Registered User
 
Join Date: Mar 2012
Posts: 426
Re-announced $21 M for TGH as part of that money. Last year's budget had $23 M , with very little if any spent this budget year so all they've done is re-announce the $21 M.

The just-announced new overpass at Topsail Rd and the in-tender underpass at Sobey's Sq will probably take half of that $21 M. The announcement said "$ 21.2 M to ADVANCE construction of TGH" so this money won't finish the road as designed.

Let's hope they get on-the-go ASAP and get this thing finished.
Reply With Quote
     
     
  #936  
Old Posted Mar 20, 2017, 5:49 PM
jjavman jjavman is offline
Registered User
 
Join Date: Apr 2011
Location: NL
Posts: 456
Team Gushue Extension

Some info I found published regarding spanning the Waterford River.

Not sure of date of publication on this or if it is current?


http://www.recocanada.com/ta/wRECO_e...way-extension-

Reply With Quote
     
     
  #937  
Old Posted Mar 20, 2017, 10:20 PM
Architype's Avatar
Architype Architype is online now
♒︎ Empirically Canadian
 
Join Date: Mar 2004
Location: 🍁 Canada
Posts: 11,930
Quote:
Originally Posted by jjavman View Post
Some info I found published regarding spanning the Waterford River.

Not sure of date of publication on this or if it is current?


http://www.recocanada.com/ta/wRECO_e...way-extension-

They said crossing the Waterford is a "major challenge", at 10 meters wide. Sadly, with "challenges" like that, this might never be finished.
Reply With Quote
     
     
  #938  
Old Posted Mar 21, 2017, 12:45 PM
rthomasd rthomasd is offline
Registered User
 
Join Date: Mar 2012
Posts: 426
That part of the project was completed some time ago, perhaps 4 years. Other than some roadbed work and the Waterford river crossing, there's been no activity south of Topsail Road. There's still an overpass to do at Brookfield Road and lots of roadwork at the Commonwealth/Brookfield/Pitts interface. Some reports suggest that the Gov't still hasn't bought all the land needed for the project.
Reply With Quote
     
     
  #939  
Old Posted Mar 22, 2017, 11:35 AM
Offshore1 Offshore1 is offline
Registered User
 
Join Date: Feb 2012
Location: NL
Posts: 209
Quote:
Originally Posted by statbass View Post
Yes and hopefully the section that is finished gets some much needed re-surfacing. That section of TGH is atrocious!
Absolutely. It's a minefield of potholes.

http://www.cbc.ca/news/canada/newfou...hole-1.4035620
Reply With Quote
     
     
  #940  
Old Posted Mar 30, 2017, 10:40 PM
Offshore1 Offshore1 is offline
Registered User
 
Join Date: Feb 2012
Location: NL
Posts: 209
Just happened upon this. Apparently Metrobus is getting at least 3 new vehicles, Vicinity buses from B.C. manufacturer Grand West Transportation. These smaller buses might be a good fit for St. John's. http://grandewest.com/
Reply With Quote
     
     
This discussion thread continues

Use the page links to the lower-right to go to the next page for additional posts
 
 
Reply

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Atlantic Provinces > St. John's
Forum Jump


Thread Tools
Display Modes

Forum Jump


All times are GMT. The time now is 1:02 AM.

     
SkyscraperPage.com - Archive - Privacy Statement - Top

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2024, vBulletin Solutions, Inc.