Quote:
Originally Posted by chris123678
Why will it take that long to deck the floors since the floor plate becomes much smaller at the top?
|
It takes much longer now than when the building was shorter because, the floors being built, as of now, are mechanical floors so they tend to take 3 weeks or more as I've seen for all of 2012 so far. Also in the PA's twitter pics this week show theses unusual thick, slanted columns that were in place on the 93rd floor deck, maybe some mechanical system or the anchors for the antenna because in a diagram i remember seeing recently, the spire goes down past the parapet into the building itself. Basically theses next few weeks of steel installation maybe slower than usual.