HomeDiagramsDatabaseMapsForum About
     

Go Back   SkyscraperPage Forum > Discussion Forums > Buildings & Architecture > Completed Project Threads Archive


    Hanover River Oaks in the SkyscraperPage Database

Building Data Page   • Houston Skyscraper Diagram

Map Location
Houston Projects & Construction Forum

 

 
Thread Tools Display Modes
     
     
Prev Previous Post   Next Post Next
     
     
  #1  
Old Posted Aug 12, 2014, 4:02 AM
Urbannizer's Avatar
Urbannizer Urbannizer is offline
Moderator
 
Join Date: Jan 2009
Location: 360, St. Edwards
Posts: 12,383
Lightbulb HOUSTON | Hanover River Oaks | 462 FT / 141 M | 39 FLOORS | U/C

Developer: Hanover Co
Architect: Solomon Cordwell Buenz
Type: Residential
Location: 2651 Kipling St. Upper Kirby
Construction Timeline: Summer 2015 Start Date

Quote:
Originally Posted by Houston Chronicle
Developer plans Upper Kirby high-rise project

A locally based developer that builds upscale apartment towers in urban locations around Houston and across the country is planning its newest project in the Upper Kirby area, potentially adding more than 300 units to a site along Kirby Drive. Details are still being completed, but the project is expected to rise more than 30 stories and have restaurants on the ground floor, David Ott, development partner of the Houston-based Hanover Co., said late Monday.

The company is seeking approval from the city to develop the project with reduced building lines along Kirby and Kipling streets in order to allow the building to sit back farther than required along Steel Street, which is lined by a canopy of decades-old live oak trees. The company's intention, Ott said, is to do "everything possible to save the trees." "We're going to set back further than is required on Steel to give the existing tree canopy as much room as possible to survive," he said. The high-rise is being planned for land that houses two retail buildings and an older apartment complex. A portion of the apartment complex is not part of Hanover's project. The tower will sit just off Kirby on the western side of the property, with a retail building fronting Kirby and creating a pedestrian plaza between the two structures. Ground-floor retail will be in both buildings. Hanover, which is under contract on the 1.65-acre property, is scheduled to close early next year and begin construction in the summer of 2015, Ott said.

Full Article: http://www.houstonchronicle.com/busi...ct-5682548.php













Last edited by Urbannizer; Jul 20, 2018 at 8:39 PM.
     
     
End
 
 
 

Go Back   SkyscraperPage Forum > Discussion Forums > Buildings & Architecture > Completed Project Threads Archive
Forum Jump



Forum Jump


All times are GMT. The time now is 6:24 AM.

     
SkyscraperPage.com - Archive - Privacy Statement - Top

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2024, vBulletin Solutions, Inc.