HomeDiagramsDatabaseMapsForum About
     

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Alberta & British Columbia > Vancouver > Downtown & City of Vancouver


    Cardero in the SkyscraperPage Database

Building Data Page   • Vancouver Skyscraper Diagram

Map Location

Reply

 
Thread Tools Display Modes
     
     
  #101  
Old Posted Mar 23, 2017, 8:28 AM
mcminsen's Avatar
mcminsen mcminsen is online now
Registered User
 
Join Date: Sep 2007
Location: Downtown Vancouver
Posts: 9,392
March 21 '17, my pics






Reply With Quote
     
     
  #102  
Old Posted May 3, 2017, 9:39 AM
mcminsen's Avatar
mcminsen mcminsen is online now
Registered User
 
Join Date: Sep 2007
Location: Downtown Vancouver
Posts: 9,392
May 2 '17, my pics









Reply With Quote
     
     
  #103  
Old Posted May 11, 2017, 12:53 AM
officedweller officedweller is offline
Registered User
 
Join Date: Jul 2001
Location: Vancouver
Posts: 38,309
Application by Bosa to combine units in this building:

Quote:
Strategic Analysis
This application seeks to increase the allowable FSR for all uses combined from 10.59 FSR to 10.85 FSR. It also seeks to increase the allowable FSR for Dwelling Uses from 7.86 FSR to 8.15 FSR. This accounts for:
• Increased residential floor area due to the conversion of in-suite storage floor area, previously excluded from FSR calculations, into normal residential floor area as a result of the consolidation of residential units;
• Increased residential floor area due to the inclusion of rooftop mechanical space that was incorrectly omitted from the residential floor area calculation in the rezoning application;
• A small net decrease in floor area due to minor changes in the residential and non-residential portions of the building.
At the rezoning stage, a majority of the proposed residential units were one-bedroom units. During pre-sales for the project, there was strong demand for larger family units with three or more bedrooms. The interior design of the residential floors was revised in response to this demand, resulting in the consolidation of smaller units into larger three-bedroom units (Figure 2 and 3).
http://council.vancouver.ca/20170516/documents/p5.pdf


http://council.vancouver.ca/20170516/documents/p5.pdf


http://council.vancouver.ca/20170516/documents/p5.pdf
Reply With Quote
     
     
  #104  
Old Posted May 28, 2017, 8:49 AM
mcminsen's Avatar
mcminsen mcminsen is online now
Registered User
 
Join Date: Sep 2007
Location: Downtown Vancouver
Posts: 9,392
May 27 '17, my pics












Reply With Quote
     
     
  #105  
Old Posted Jun 20, 2017, 7:59 AM
mcminsen's Avatar
mcminsen mcminsen is online now
Registered User
 
Join Date: Sep 2007
Location: Downtown Vancouver
Posts: 9,392
June 17 '17, my pics



Reply With Quote
     
     
  #106  
Old Posted Jul 26, 2017, 8:10 AM
mcminsen's Avatar
mcminsen mcminsen is online now
Registered User
 
Join Date: Sep 2007
Location: Downtown Vancouver
Posts: 9,392
July 25 '17, my pics












Reply With Quote
     
     
  #107  
Old Posted Sep 24, 2017, 8:00 AM
mcminsen's Avatar
mcminsen mcminsen is online now
Registered User
 
Join Date: Sep 2007
Location: Downtown Vancouver
Posts: 9,392
A couple months later and the excavation seems so much larger now. For scale, see the guy in the last pic (lower right).



Sept.23 '17, my pics









Reply With Quote
     
     
  #108  
Old Posted Sep 29, 2017, 10:08 PM
officedweller officedweller is offline
Registered User
 
Join Date: Jul 2001
Location: Vancouver
Posts: 38,309
Sept 15th overview.
Is the carve-out for a pumping station, maybe?


https://twitter.com/axiombuilders
Reply With Quote
     
     
  #109  
Old Posted Nov 1, 2017, 8:36 AM
mcminsen's Avatar
mcminsen mcminsen is online now
Registered User
 
Join Date: Sep 2007
Location: Downtown Vancouver
Posts: 9,392
Oct.31 '17, my pics



Reply With Quote
     
     
  #110  
Old Posted Nov 21, 2017, 11:48 PM
officedweller officedweller is offline
Registered User
 
Join Date: Jul 2001
Location: Vancouver
Posts: 38,309
Crane installed.

From Axiom Builders twitter today:


https://twitter.com/axiombuilders


https://twitter.com/axiombuilders
Reply With Quote
     
     
  #111  
Old Posted Dec 31, 2017, 7:46 AM
mcminsen's Avatar
mcminsen mcminsen is online now
Registered User
 
Join Date: Sep 2007
Location: Downtown Vancouver
Posts: 9,392
Dec.30 '17, my pic
Reply With Quote
     
     
  #112  
Old Posted Jan 2, 2018, 11:00 PM
officedweller officedweller is offline
Registered User
 
Join Date: Jul 2001
Location: Vancouver
Posts: 38,309
I just noticed that the staircase is suspended from above
(2 I-beams counter weighted by concrete blocks).


Quote:
Originally Posted by mcminsen View Post
Oct.31 '17, my pics
Reply With Quote
     
     
  #113  
Old Posted Mar 8, 2018, 6:28 AM
mcminsen's Avatar
mcminsen mcminsen is online now
Registered User
 
Join Date: Sep 2007
Location: Downtown Vancouver
Posts: 9,392
First photo update of the year.




Mar.7 '18, my pics












Reply With Quote
     
     
  #114  
Old Posted Apr 26, 2018, 8:49 AM
mcminsen's Avatar
mcminsen mcminsen is online now
Registered User
 
Join Date: Sep 2007
Location: Downtown Vancouver
Posts: 9,392
April 25 '18, my pics









Reply With Quote
     
     
  #115  
Old Posted Apr 27, 2018, 8:21 PM
LeftCoaster's Avatar
LeftCoaster LeftCoaster is offline
Moderator
 
Join Date: Nov 2005
Location: Toroncouver
Posts: 12,629
Started excav a year and a half ago and they're still nowhere near grade. This one is slow going considering it didn't go down that far.
Reply With Quote
     
     
  #116  
Old Posted Apr 27, 2018, 9:41 PM
Graham_Yvr's Avatar
Graham_Yvr Graham_Yvr is offline
Registered User
 
Join Date: Oct 2009
Location: Vancouver
Posts: 270
Quote:
Originally Posted by LeftCoaster View Post
Started excav a year and a half ago and they're still nowhere near grade. This one is slow going considering it didn't go down that far.
Agreed! Compare this to The Arc, which started well after, and is now what, 8 or 10 storeys above grade now.
Reply With Quote
     
     
  #117  
Old Posted May 18, 2018, 12:34 AM
officedweller officedweller is offline
Registered User
 
Join Date: Jul 2001
Location: Vancouver
Posts: 38,309
From Axiom twitter today:


This week at Cardero, by @BosaProperties, we have been working on P2! In the beginning of the week,
we poured half of the P2 suspended slab. For the rest of the week, we will be working on the P2 core walls,
columns, and perimeter walls.

https://twitter.com/axiombuilders
Reply With Quote
     
     
  #118  
Old Posted Jun 6, 2018, 9:02 AM
mcminsen's Avatar
mcminsen mcminsen is online now
Registered User
 
Join Date: Sep 2007
Location: Downtown Vancouver
Posts: 9,392
June 4 '18, my pics









Reply With Quote
     
     
  #119  
Old Posted Jun 27, 2018, 5:12 AM
mcminsen's Avatar
mcminsen mcminsen is online now
Registered User
 
Join Date: Sep 2007
Location: Downtown Vancouver
Posts: 9,392
Quote:
Originally Posted by mcminsen View Post
June 4 '18, my pic



Three weeks of progress...



June 26 '18, my pics


Reply With Quote
     
     
  #120  
Old Posted Jun 27, 2018, 3:25 PM
rofina rofina is offline
Registered User
 
Join Date: Nov 2013
Posts: 5,149
Skeleton crew due to labour shortages?

Pretty slow build.
Reply With Quote
     
     
This discussion thread continues

Use the page links to the lower-right to go to the next page for additional posts
 
 
Reply

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Alberta & British Columbia > Vancouver > Downtown & City of Vancouver
Forum Jump



Forum Jump


All times are GMT. The time now is 10:39 PM.

     
SkyscraperPage.com - Archive - Privacy Statement - Top

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2024, vBulletin Solutions, Inc.