Now forming the footings for the building on the NW corner of block. Still appear to be working on finishing up the L1 walls and posts for the center building fronting South St. Crews have been busy digging up the Waterloo and Hill Streets to connect the sewer and water main connects for the different buildings.
Reply With Quote
     
     
  #42  
Old Posted Mar 12, 2024, 8:45 PM
jammer139 jammer139 is online now
Registered User
 
Join Date: Jun 2016
Location: London
Posts: 5,795
Have started to install the ground floor precast concrete floor slabs on the middle building fronting South St. Also now starting the forming of the L1 walls for the building in the NW corner of the block.
Reply With Quote
     
     
  #43  
Old Posted Mar 20, 2024, 3:03 PM
jammer139 jammer139 is online now
Registered User
 
Join Date: Jun 2016
Location: London
Posts: 5,795
Looks like they are finishing the ground floor precast slab installs this week on the new centre building. Should see the first ground floor wall and post forming starting next week. They have now poured some of the L1 walls for the NW corner building in the NW corner of the pit.
Reply With Quote
     
     
  #44  
Old Posted Apr 5, 2024, 3:41 PM
jammer139 jammer139 is online now
Registered User
 
Join Date: Jun 2016
Location: London
Posts: 5,795
Have now got some of the ground floor elevator/stairwell shaft walls poured and have built some of the ground floor concrete block walls.
Reply With Quote
     
     
  #45  
Old Posted Apr 14, 2024, 3:57 PM
jammer139 jammer139 is online now
Registered User
 
Join Date: Jun 2016
Location: London
Posts: 5,795
Have made progress building the ground floor concrete block walls and they appear to have finished forming and pouring the elevator stairwell shaft walls for the ground floor level as well. They have started installing structural steel posts in the SE. So it appears they will use a combination of poured concrete for the elevator/stairwell shafts, concrete block walls and structural steel for cross beams and posts and likely precast concrete floor slabs for this 6 story building. The building on the NW corner has also been making progress with pouring the L1 walls and posts.
Reply With Quote
     
     
  #46  
Old Posted Apr 23, 2024, 7:51 PM
jammer139 jammer139 is online now
Registered User
 
Join Date: Jun 2016
Location: London
Posts: 5,795
The centre 6s building has now got some of the 2nd floor precast floor slabs installed in the NE corner. Still working on building ground floor walls using concrete block on the west side. The 5s building in the NW corner of the block has been making progress with forming and pouring the L1 walls. No visible signs of any work happening on the two heritage buildings although its likely they are still remediating the inside lead paint and asbestos. Also no signs of any work on the 11s Italian Residence building planned for the empty parking lot on the block east of this site. It's a different developer again and they may be still dealing with securing financing.
Reply With Quote
     
     
End
 
 
Reply

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Ontario > London > Projects & Construction Updates
Forum Jump



Forum Jump


All times are GMT. The time now is 5:50 PM.

     
SkyscraperPage.com - Archive - Privacy Statement - Top

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2024, vBulletin Solutions, Inc.