Posted Apr 14, 2024, 3:57 PM
|
Registered User
|
|
Join Date: Jun 2016
Location: London
Posts: 5,795
|
|
Have made progress building the ground floor concrete block walls and they appear to have finished forming and pouring the elevator stairwell shaft walls for the ground floor level as well. They have started installing structural steel posts in the SE. So it appears they will use a combination of poured concrete for the elevator/stairwell shafts, concrete block walls and structural steel for cross beams and posts and likely precast concrete floor slabs for this 6 story building. The building on the NW corner has also been making progress with pouring the L1 walls and posts.
|