Posted Jun 1, 2023, 5:33 PM
|
Registered User
|
|
Join Date: Jun 2016
Location: London
Posts: 5,795
|
|
Nearly done with the 10th floor walls and posts pours now. Also have window modules installed up to the 4th floor. Large delivery of drywall and steel studs today as they are likely already underway installing the interior wall partitions on the lower floors now.
|