  #961  
Old Posted Aug 16, 2015, 7:18 AM
pseudolus pseudolus is offline
Registered User
 
Join Date: Jul 2006
Location: Mission Terrace, SF
Posts: 706
Quote:
Originally Posted by fflint View Post
For the zillionth time, Salesforce Tower is being built on landfill and that means extra work underground. Some random Chinese tower not being built on landfill? Off topic.
You have a remarkable ability to miss the point entirely. (see below)

Last edited by pseudolus; Aug 16, 2015 at 9:32 PM.
Reply With Quote
     
     
  #962  
Old Posted Aug 16, 2015, 7:31 AM
tech12's Avatar
tech12 tech12 is online now
Registered User
 
Join Date: Sep 2005
Location: Oakland
Posts: 3,339
^I though he was replying to wakamesalad, not you.

Quote:
Originally Posted by wakamesalad View Post
Meanwhile, in China, where earthquakes are no stranger, they are constructing a 1,740 ft. tower. In 1 ½ years they have gone from this:

to this:
Wow, it's almost like China is a completely different country, with different politics at play, a different government, lower prices for construction, and different rules and regulations. And it's almost like the ground the Salesforce tower is being built on has a deep layer of unstable landfill and silt on top of the bedrock, in an area that used to be part of a bay, and is in an earthquake zone, unlike the sites of so many other skyscrapers that get built faster.

Go smoke some weed or something, and stop getting angry about skyscrapers for a while
Reply With Quote
     
     
  #963  
Old Posted Aug 16, 2015, 3:13 PM
mt_climber13 mt_climber13 is offline
Registered User
 
Join Date: Jan 2012
Location: San Diego
Posts: 1,287
so touchy in San Fran these days. I am just pointing out observations and I get bombarded with personal attacks. Maybe you should get out on a Sat. Night and you wouldn't be so uptight at 12:30 am, lol.

I do have my doubts this will be built within the next 10 years. Another year at least to ground level, and a lot can happen in a year. Look what is happening in China and Greece/ Eurozone. not to mention that tech is certainly inflated right now, and once Feds raise interest rates, all of this will cause a ripple effect. So what if the tower is pre- leased, means nothing if the lending dries up and there is no more money for construction, and SalesForce loses its valuation. They have the most to lose, as they are interconnected in the tech industry in a huge way, and they just finished building a new tower across the street.

Place yer bets!

Last edited by mt_climber13; Aug 16, 2015 at 3:38 PM.
Reply With Quote
     
     
  #964  
Old Posted Aug 16, 2015, 4:43 PM
PEORIA PEORIA is offline
Registered User
 
Join Date: Jan 2009
Posts: 158
Quote:
Originally Posted by pseudolus View Post
Are we talking about the same China that built this?



http://i.kinja-img.com/gawker-media/...nbj33x7jpg.jpg
Reply With Quote
     
     
  #965  
Old Posted Aug 16, 2015, 5:00 PM
mt_climber13 mt_climber13 is offline
Registered User
 
Join Date: Jan 2012
Location: San Diego
Posts: 1,287
^You've heard of Chinese checkers? Well, that's Chinese dominoes.

The odds are pretty high on that game, though.
Reply With Quote
     
     
  #966  
Old Posted Aug 16, 2015, 6:27 PM
SFView SFView is offline
Registered User
 
Join Date: Jun 2006
Posts: 1,071
As previously pointed out, the actual site was once near a shoreline. Add the fact the the tower foundation is located adjacent to an enormous train box, where a supertall building must meet some of the toughest seismic codes on earth, one may begin to understand the extra length of time for construction of the foundation.
Reply With Quote
     
     
  #967  
Old Posted Aug 16, 2015, 6:42 PM
pseudolus pseudolus is offline
Registered User
 
Join Date: Jul 2006
Location: Mission Terrace, SF
Posts: 706
Quote:
Originally Posted by tech12 View Post
^I though he was replying to wakamesalad, not you.


Oh, I think you're right. My apologies to fflint.
Reply With Quote
     
     
  #968  
Old Posted Aug 16, 2015, 6:51 PM
fflint's Avatar
fflint fflint is offline
Triptastic Gen X Snoozer
 
Join Date: Jul 2001
Location: San Francisco
Posts: 22,207
edit: nm
__________________
"You need both a public and a private position." --Hillary Clinton, speaking behind closed doors to the National Multi-Family Housing Council, 2013
Reply With Quote
     
     
  #969  
Old Posted Aug 17, 2015, 6:04 AM
botoxic botoxic is offline
Registered User
 
Join Date: Dec 2006
Location: The Mission
Posts: 690
I work for one of the top five largest construction companies in the United States, and a major aspect of my job consists of analysis of construction funding sources - both pre-bid and during the construction of our projects. My company is not associated with the construction of the Salesforce Tower, but currently I see absolutely no indication that as a whole, there are any major concerns about the financing of major construction in San Francisco (now and immediate future).

The costs of halting large-scale construction projects are extremely prohibitive, and in the case of Salesforce Tower, could accumulate to as much as 5% of the total construction cost. In my 20 years in the industry, my company has only had one project stopped in Northern California (Sacramento), and I know of only a handful in the United States. For large-scale construction, I would guess that less than 2% of projects experience a stoppage due to project financing. And from what I know of the Salesforce Tower financing and lease terms, I would surmise that this project is one of the least likely in San Francisco to be affected by a downturn in the economy.

Aside from the hiccups to be expected anytime you are building a massive "once in a lifetime" construction project, Salesforce Tower is very close to meeting its planned schedule. I am 100% sure that the goal of absolutely everyone associated with the project is to get it finished as quickly as humanly possible.

So until someone has some concrete evidence to the contrary, I don't see the value or necessity of Chicken Little posts every two weeks.
Reply With Quote
     
     
  #970  
Old Posted Aug 17, 2015, 1:16 PM
mt_climber13 mt_climber13 is offline
Registered User
 
Join Date: Jan 2012
Location: San Diego
Posts: 1,287
I just want to say, thank you for that mature, professional, educated response. It's a breath of fresh air around here, and I feel schooled after reading it. After years of what appears to be them pushing dirt around, it gets very frustrating and you lose hope. Good to have an insider around here.
Reply With Quote
     
     
  #971  
Old Posted Aug 25, 2015, 7:18 AM
SoCal Alan SoCal Alan is offline
Registered User
 
Join Date: Sep 2006
Posts: 242
Quote:
Originally Posted by rocketman_95046 View Post
Rumor is that some of the footings need to be redone. concrete strength did not pass tests.

Not good news, may be some delay/rework.

Trying to get confirmation on this.
I talked to a construction worker today. I asked him about the piles and he told me that two of the piles did not pass the concrete test, so they have to be redone. That's why they are digging, and it will be a six month delay.
Reply With Quote
     
     
  #972  
Old Posted Aug 25, 2015, 7:12 PM
SoCal Alan SoCal Alan is offline
Registered User
 
Join Date: Sep 2006
Posts: 242
Taken yesterday afternoon:







Reply With Quote
     
     
  #973  
Old Posted Aug 25, 2015, 7:43 PM
BrownTown BrownTown is offline
BANNED
 
Join Date: Apr 2008
Posts: 1,884
Quote:
Originally Posted by SoCal Alan View Post
I talked to a construction worker today. I asked him about the piles and he told me that two of the piles did not pass the concrete test, so they have to be redone. That's why they are digging, and it will be a six month delay.
Only in America.
Reply With Quote
     
     
  #974  
Old Posted Aug 25, 2015, 8:13 PM
Plokoon11 Plokoon11 is offline
Registered User
 
Join Date: Jun 2007
Posts: 1,698
So topping out by 2020 at this point?
Reply With Quote
     
     
  #975  
Old Posted Aug 25, 2015, 8:34 PM
a very long weekend's Avatar
a very long weekend a very long weekend is offline
dazzle me
 
Join Date: Jan 2014
Location: 94109
Posts: 824
damn. still, with such a long schedule, it's possible during the building process to make some of that time up, though obviously in our "just in time" age. what sort of insurance would a mega developer like hines/bp have on something like that? surely a project of this magnitude would hedge against delays and potential lost revenues?
Reply With Quote
     
     
  #976  
Old Posted Aug 25, 2015, 10:16 PM
pseudolus pseudolus is offline
Registered User
 
Join Date: Jul 2006
Location: Mission Terrace, SF
Posts: 706
Quote:
Originally Posted by a very long weekend View Post
damn. still, with such a long schedule, it's possible during the building process to make some of that time up, though obviously in our "just in time" age. what sort of insurance would a mega developer like hines/bp have on something like that? surely a project of this magnitude would hedge against delays and potential lost revenues?
I wonder if their contract with Salesforce has a delivery-by date.
Reply With Quote
     
     
  #977  
Old Posted Aug 26, 2015, 12:08 AM
rocketman_95046's Avatar
rocketman_95046 rocketman_95046 is offline
Registered User
 
Join Date: Aug 2002
Location: SD/SJ, CA, USA
Posts: 1,879
Quote:
Originally Posted by SoCal Alan View Post
I talked to a construction worker today. I asked him about the piles and he told me that two of the piles did not pass the concrete test, so they have to be redone. That's why they are digging, and it will be a six month delay.
thanks SoCal for the confirmation...
__________________
1,000 posts and still going...
Reply With Quote
     
     
  #978  
Old Posted Aug 26, 2015, 5:12 AM
SFView SFView is offline
Registered User
 
Join Date: Jun 2006
Posts: 1,071
Wow, that sounds like a rather costly delay, but a correct foundation that meets all performance standards is still essential over cost before anything is built above it.
Reply With Quote
     
     
  #979  
Old Posted Aug 26, 2015, 3:19 PM
rocketman_95046's Avatar
rocketman_95046 rocketman_95046 is offline
Registered User
 
Join Date: Aug 2002
Location: SD/SJ, CA, USA
Posts: 1,879
Well some good news... Looks like the tower is in line to get a few more tenants.

http://www.bizjournals.com/sanfranci...francisco.html
__________________
1,000 posts and still going...
Reply With Quote
     
     
  #980  
Old Posted Aug 26, 2015, 4:53 PM
mt_climber13 mt_climber13 is offline
Registered User
 
Join Date: Jan 2012
Location: San Diego
Posts: 1,287
April 2017 delivery?! What are they smoking. This thing won't even get to ground level until late winter/ early spring 2016 at earliest. They think that a 1000'+ supertower is going to be fully built, exterior and interior, in 1 year? In San Francisco??
Reply With Quote
     
     
This discussion thread continues

Use the page links to the lower-right to go to the next page for additional posts
 
 
Reply

Go Back   SkyscraperPage Forum > Discussion Forums > Buildings & Architecture
Forum Jump



Forum Jump


All times are GMT. The time now is 7:30 PM.

     
SkyscraperPage.com - Archive - Privacy Statement - Top

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2024, vBulletin Solutions, Inc.