  #10241  
Old Posted Aug 11, 2015, 2:29 PM
tennis1400 tennis1400 is offline
-
 
Join Date: Aug 2003
Posts: 7,474
OK I saw the Virgin Hotel was on the city council docket last Thursday. Does anyone know if it was voted on? I couldn't find the minutes of the meeting and didn't feel like watching the video. Reason I ask is because a new construction permit was filed for 550 Baronne last week as well. So would seem to indicate they were confident of getting approved.


550 Baronne St·New Construction ·Ref Code: U2GQRS
Download (1) Print Summary SubmitAdd to Watch List
Type:
New Construction
Applicant:
Todd James
Status:
Application Submitted
Date Filed:
8/4/2015 2:57:20 PM
Closed:
No
Description
Construct 146100 sq ft 14-story hotel as per plans
Reply With Quote
     
     
  #10242  
Old Posted Aug 11, 2015, 2:55 PM
Blitzen Blitzen is offline
Registered User
 
Join Date: Mar 2010
Posts: 719
Quote:
Originally Posted by tennis1400 View Post
OK I saw the Virgin Hotel was on the city council docket last Thursday. Does anyone know if it was voted on? I couldn't find the minutes of the meeting and didn't feel like watching the video. Reason I ask is because a new construction permit was filed for 550 Baronne last week as well. So would seem to indicate they were confident of getting approved.


550 Baronne St·New Construction ·Ref Code: U2GQRS
Download (1) Print Summary SubmitAdd to Watch List
Type:
New Construction
Applicant:
Todd James
Status:
Application Submitted
Date Filed:
8/4/2015 2:57:20 PM
Closed:
No
Description
Construct 146100 sq ft 14-story hotel as per plans
Deferred to August 20th.
Reply With Quote
     
     
  #10243  
Old Posted Aug 11, 2015, 3:07 PM
tennis1400 tennis1400 is offline
-
 
Join Date: Aug 2003
Posts: 7,474
Quote:
Originally Posted by Blitzen View Post
Deferred to August 20th.
Thanks I know it was first reading so didn't expect it to be voted on right away.Nonetheless, thought it interesting that they applied for a permit for new construction already.



BTW probably couldnt hurt for people to send letter of support to Cantrell if they have a minute.
Reply With Quote
     
     
  #10244  
Old Posted Aug 12, 2015, 4:14 AM
Blitzen Blitzen is offline
Registered User
 
Join Date: Mar 2010
Posts: 719
Updated Imagery

Want to know the status of a project from the air? This website updated their aerial imagery to today, literally.

http://www.terraserver.com/view.asp?...mpp=1&sdrt=jax

Things to note:
1. Weird to see cars in the parking lots at the new UMC Hospital.
2. SMD's The Beacon looks pretty good from the air.
3. Magnolia Marketplace looks tight.
4. Senior's building at Faubourg Lafitte has come a long way.
5. Iberville Projects coming along.
Reply With Quote
     
     
  #10245  
Old Posted Aug 12, 2015, 12:22 PM
tennis1400 tennis1400 is offline
-
 
Join Date: Aug 2003
Posts: 7,474
Quote:
Originally Posted by Blitzen View Post
Want to know the status of a project from the air? This website updated their aerial imagery to today, literally.

http://www.terraserver.com/view.asp?...mpp=1&sdrt=jax

Things to note:
1. Weird to see cars in the parking lots at the new UMC Hospital.
2. SMD's The Beacon looks pretty good from the air.
3. Magnolia Marketplace looks tight.
4. Senior's building at Faubourg Lafitte has come a long way.
5. Iberville Projects coming along.
Wow thanks for this . What's this company about ?
Reply With Quote
     
     
  #10246  
Old Posted Aug 12, 2015, 1:26 PM
Blitzen Blitzen is offline
Registered User
 
Join Date: Mar 2010
Posts: 719
Quote:
Originally Posted by tennis1400 View Post
Wow thanks for this . What's this company about ?
They sell aerial images, so you have to deal with their logo everywhere, but at least they update the images very often and post them even on the same day.
Reply With Quote
     
     
  #10247  
Old Posted Aug 13, 2015, 1:57 AM
Tchoupitoulas Tchoupitoulas is offline
Registered User
 
Join Date: May 2015
Location: New Orleans
Posts: 70
Not sure of the status of this project, but I stumbled upon this rendering of the Moxy Hotel at 744 St. Charles:

Reply With Quote
     
     
  #10248  
Old Posted Aug 13, 2015, 3:24 AM
Eightball's Avatar
Eightball Eightball is offline
life is good
 
Join Date: Jun 2013
Location: all over
Posts: 2,301
that fits the streetscape well. love the first floor and balconies, not sure about the rest tho
Reply With Quote
     
     
  #10249  
Old Posted Aug 13, 2015, 3:33 AM
alon504's Avatar
alon504 alon504 is offline
Registered User
 
Join Date: Mar 2005
Location: New Orleans, LA
Posts: 1,039
Quote:
Originally Posted by prokowave View Post
The 365 Canal/One Canal Place permit caught my eye. I wonder if they're considering a residential project for the long-rumored third phase expansion. I assume that lot is zoned for a high-rise building?

It's good to see that a grocery is still part of the Jung project. That will be good for the area. I've got my fingers crossed for Trader Joe's.
I'm intrigued by the 365 Canal permit, as well. So much to watch right now, but, with this location, I'm going to be looking to see what comes out of this permit...that is one serious location.
Reply With Quote
     
     
  #10250  
Old Posted Aug 13, 2015, 2:32 PM
tennis1400 tennis1400 is offline
-
 
Join Date: Aug 2003
Posts: 7,474
Quote:
Originally Posted by Tchoupitoulas View Post
Not sure of the status of this project, but I stumbled upon this rendering of the Moxy Hotel at 744 St. Charles:

Permit was applied for last week to build.
Reply With Quote
     
     
  #10251  
Old Posted Aug 13, 2015, 3:08 PM
WesternSon WesternSon is offline
Registered User
 
Join Date: Oct 2010
Posts: 294
Two Moxys?

Quote:
Originally Posted by tennis1400 View Post
Permit was applied for last week to build.
I thought they were putting a Moxy hotel in that old Quality Inn at O'Keefe and Common?
Reply With Quote
     
     
  #10252  
Old Posted Aug 13, 2015, 4:24 PM
prokowave prokowave is offline
Registered User
 
Join Date: Jun 2010
Posts: 526
It was my understanding that they planned to build hotels at both locations. I remembered there being some opposition to the St. Charles location, however it's nice to see it moving forward.

Small update: demolition on the former Home Depot on Carrollton is now moving forward
Reply With Quote
     
     
  #10253  
Old Posted Aug 13, 2015, 5:59 PM
tennis1400 tennis1400 is offline
-
 
Join Date: Aug 2003
Posts: 7,474
[/IMG]
Quote:
Originally Posted by WesternSon View Post
I thought they were putting a Moxy hotel in that old Quality Inn at O'Keefe and Common?


Yes, They are building two Moxys in the New Orleans market. I'm not sure if you remember the original press release from Moxy about coming to the U.S. But they mentioned two in Nola and Nyc markets.

Btw whoever did the rendering of that Moxy did a first class job. That's one of the better ones that I have seen!



Opening Report: Shake Sugary Reopens in Bywater, La Mansion Hits Riverbend





http://nola.eater.com/2015/8/13/9147...a-mansion-hits




Bar Frances wine bar plans April opening on Freret from owners of Tujague’s, Bin 428



http://uptownmessenger.com/2015/08/b...agues-bin-428/



Lafitte Greenway receiving final touches — signs and high-tech crosswalks — with outdoor fitness park planned


http://midcitymessenger.com/2015/08/...-park-planned/



South Market CVS Now Open:





Once Decaying LGD Home of Late Talent Agent Asks $1.55M




http://nola.curbed.com/archives/2015...reet-house.php


Initial phases of Iberville rebuild now taking tenants

Read more: http://neworleanscitybusiness.com/bl...#ixzz3ijDhx8RT




Permits:



1800 Iberville St, Unit 1. 2 & 3·New Construction ·Ref Code: 8DHDYR
Download (5)
Print Summary
Add to Watch List

progress

Type:
New Construction

Applicant:
Jabbar Rodney

Status:
Application Review

Date Filed:
8/11/2015 10:40:50 AM

Closed:
No

Description

New construction of a 2110 s.f. ( 3 ) unit strip mall as per plans,BZA and CPC Approval.











11960 Hayne Blvd·New Construction ·Ref Code: W0YK1W
Download (5)
Print Summary
Add to Watch List

progress

Type:
New Construction

Applicant:
Charles Neyrey

Status:
Application Submitted

Date Filed:
8/11/2015 10:46:58 AM

Closed:
No

Description

new construction 8 unit residential facility






1432 3Rd St·New Construction ·Ref Code: M3Z10G
Print Summary
Add to Watch List

progress

Type:
New Construction

Applicant:
Gene Guidry

Status:
Application Submitted

Date Filed:
8/11/2015 1:42:56 PM

Closed:
No

Description

Construct 3-story 10884 sq ft single-family dwelling and 2 detached accessory structures as per plans.





201 Nashville Ave·New Construction ·Ref Code: 8M0EFM
Download (4)
Print Summary
Add to Watch List

progress

Type:
New Construction

Applicant:
Brinance Investments LLC

Status:
Application Submitted

Date Filed:
8/11/2015 2:27:01 PM

Closed:
No

Description

New construction of a small animal veterinary hospital perr plans.






2126 Port St·New Construction ·Ref Code: C1Z1YQ
Download (3)
Print Summary
Add to Watch List

progress

Type:
New Construction

Applicant:
Roofless, LLC

Status:
Application Submitted

Date Filed:
8/11/2015 4:37:05 PM

Closed:
No

Description

New construction of a bar per plans.










16001 Hayne Blvd, 16035 Hayne Blvd.·New Construction ·Ref Code: UAK7L2
Print Summary
Add to Watch List

progress

Type:
New Construction

Applicant:
John Bowes

Status:
Application Submitted

Date Filed:
8/11/2015 5:43:36 PM

Closed:
No

Description

Lakehouse/Boathouse on Lake pontchatrain in Littlewoods






5101 Canal Blvd·New Construction ·Ref Code: RJF8CD
Download (2)
Print Summary
Add to Watch List

progress

Type:
New Construction

Applicant:
Michael Riviere

Status:
Application Submitted

Date Filed:
8/11/2015 6:04:42 PM

Closed:
No

Description

New construction of an RTA bus and street car stop to include new covered waiting areas.


















1700 Moss St·New Construction ·Ref Code: Y5LYYD
Download (1)
Print Summary
Add to Watch List

progress

Type:
New Construction

Applicant:
Todd James

Status:
Application Submitted

Date Filed:
8/11/2015 9:34:35 PM

Closed:
No

Description

THIS BUILDING IS A NEW 2-STORY ASSEMBLY AND EVENT HALL ON A SITE WITH EXTENSIVE EXISTING CONCRETE PADS AND A GROVE OF MATURE LIVE OAKS. THE BUILDING INCLUDES A MAIN ASSEMBLY SPACE AND A CLASSROOM AREA (EACH OF WHICH MAY BE DIVIDED INTO TWO SEPARATE ROOMS BY A FOLDING PARTITION), TWO BARS, A COMMERCIAL KITCHEN, AN OFFICE, AND INCIDENTAL USE. THE BUILDING HAS TERRACES AT GROUND LEVEL, BALCONIES AT THE SECOND LEVEL, AND ADJOINS AN OUTDOOR RECREATIONAL AREA DESIGNED AS A BEER GARDEN.








2500 Canal St·New Construction ·Ref Code: RKPM15
Print Summary
Add to Watch List

progress

Type:
New Construction

Applicant:
Bob Pence

Status:
Application Submitted

Date Filed:
8/12/2015 2:52:05 PM

Closed:
No

Description

Waffle House restaurant





1559 Iberville St·New Construction ·Ref Code: SLSX87
Print Summary
Add to Watch List

progress

Type:
New Construction

Applicant:
Michelle Burkart

Status:
Application Submitted

Date Filed:
8/13/2015 1:57:11 PM

Closed:
No

Description

New construction of four (4) story multi-family residential apartments. M-5





4934 Magazine St·Change of Use ·Ref Code: HHUPYP
Download (3)
Print Summary
Add to Watch List

progress

Type:
Change of Use

Applicant:
Leonard Torre

Status:
Application Submitted

Date Filed:
8/10/2015 9:02:03 AM

Closed:
No

Description

Convert a vacant office into a restaurant as per plans.






233 N Peters St·Renovation (Structural) ·Ref Code: 61TMAW
Download (5)
Print Summary
Add to Watch List

progress

Type:
Renovation (Structural)

Applicant:
John C. Williams

Status:
Application Submitted

Date Filed:
8/11/2015 9:21:11 AM

Closed:
No

Description

Renovation of three floors existing vacant building to provide ground floor commercial white box and 7 residential units on the two floors above as per plans.

Wonder if this will be the future home of Maragaritaville?


















111 Iberville St·Renovation (Structural) ·Ref Code: TL5FUQ
Download (1)
Print Summary
Add to Watch List

progress

Type:
Renovation (Structural)

Applicant:
John C. Williams

Status:
Application Submitted

Date Filed:
8/11/2015 9:01:35 AM

Closed:
No

Description

Renovation of an existing historic 7 story structure to an 8 story structure. The work generally includes new finishes, new pool deck at the first level, new kitchen, new ADA toilets facilities. The work includes new MEP work as well as sprinkler system modifications and new fire alarm.







1000 N Rampart St·Renovation (Structural) ·Ref Code: TANB3N
Download (3)
Print Summary
Add to Watch List

progress

Type:
Renovation (Structural)

Applicant:
Morris Kahn

Status:
Application Submitted

Date Filed:
8/13/2015 10:42:42 AM

Closed:
No

Description

Renovate and construct addition of a 64 sq ft bathroom to1st floor office (1000 N Rampart St) and renovate 2nd and 3rd floors as 1-dwelling as per plans. No exterior work allowed under this permit. (2-Residential, 2-Commercial)





1511 Bienville St·Renovation (Structural) ·Ref Code: J4ETVU
Print Summary
Add to Watch List

progress

Type:
Renovation (Structural)

Applicant:
Michelle Burkart

Status:
Application Submitted

Date Filed:
8/13/2015 4:21:34 PM

Closed:
No

Description

Historic rehabilitation of existing three (3) story residential structures into new multi-family residential apartments. (H-12) (E)





3913 Magazine St·Renovation (Non-Structural) ·Ref Code: 35PANS
Download (3)
Print Summary
Add to Watch List

progress

Type:
Renovation (Non-Structural)

Applicant:
Ted Reeds Architecture

Status:
Application Submitted

Date Filed:
8/12/2015 3:09:28 PM

Closed:
No

Description

Interior renovation to 1st floor commercial space inside of a mixed use building as per plans.













3308 Tulane Ave, 1st Floor·Renovation (Non-Structural) ·Ref Code: V8X0V2
Download (1)
Print Summary
Add to Watch List

progress

Type:
Renovation (Non-Structural)

Applicant:
Jill Shingledecker

Status:
Application Submitted

Date Filed:
8/12/2015 3:11:48 PM

Closed:
No

Description

The Work includes the build-out of a portion of the 1st floor for tenant occupied space. New finishes will be installed throughout the area of Work. No Work will be done to the existing fire alarm system. Electrical Work includes installing new light fixtures and minor power and data alterations (under $15,000). Mechanical Work includes minor alterations to the existing ducts and grills locations. Plumbing work includes only the addition of one sink.





4536 Dryades St·Renovation (Non-Structural) ·Ref Code: UNZBTJ
Print Summary
Add to Watch List

progress

Type:
Renovation (Non-Structural)

Applicant:
Ben Jacobson

Status:
Application Submitted

Date Filed:
8/13/2015 7:41:28 AM

Closed:
No

Description

Change of use to commercial.





614 Gravier St [Atelier Napoli]·Renovation (Non-Structural) · Permit #15-24058-RNVN ·Ref Code: HJ83A2
Download (4)
Print Summary
Add to Watch List

progress

Type:
Renovation (Non-Structural)

Applicant:
Courtney Williams

Status:
Permit Approved

Date Filed:
8/11/2015 11:12:20 AM

Closed:
No

Description

Interiro exploratory demolition (removal of outdated mechanical, plumbing and electrical, damaged finishes) and removal of modern storefront, board up storefront . Plans to follow. No use and Occupancy under this permit.


djsnola
7834 Earhart Blvd, 7834 Earhart Blvd·Renovation (Non-Structural) ·Ref Code: 1RGGW4
Download (1)
Print Summary
Add to Watch List

progress

Type:
Renovation (Non-Structural)

Applicant:
Freddie Baker

Status:
Application Review

Date Filed:
8/11/2015 2:24:52 PM

Closed:
No

Description

Tenant renovations for a full service restaurant as per plans.


djsnola
1683 N Claiborne Ave·Renovation (Non-Structural) · Permit #15-24279-RNVN ·Ref Code: KM3YYR
Download (3)
Print Summary
Add to Watch List

progress

Type:
Renovation (Non-Structural)

Applicant:
Walter Lewis

Status:
Permit Issued

Date Filed:
8/12/2015 3:09:14 PM

Closed:
No

Description

Non-structural cosmetic repairs to vacant commercial structure. Repairs include HVAC, electrical, plumbing, replace ceiling tile, sheetrock, repair store front (tempered glass), painting, and floors. No use & occupancy. Plans to follow. White box only.

Last edited by tennis1400; Aug 13, 2015 at 10:19 PM.
Reply With Quote
     
     
  #10254  
Old Posted Aug 14, 2015, 4:42 PM
SlidellWx's Avatar
SlidellWx SlidellWx is offline
Registered User
 
Join Date: Nov 2005
Location: New Orleans
Posts: 1,551
The T-P has some more details posted in a series of articles about the proposals to redevelop the old Charity Campus. Right now, I like the HRI proposal best as it sets aside a large amount of space for medical research companies.

Matthews Southwest Proposal

HRI Proposal

CHR Partners Proposal

Glad to see that the Canal Blvd. transit center is moving forward. That has been needed for a long time.
__________________
Slidell, LA...The Camellia City
Reply With Quote
     
     
  #10255  
Old Posted Aug 14, 2015, 6:38 PM
tennis1400 tennis1400 is offline
-
 
Join Date: Aug 2003
Posts: 7,474
Orpheum Theatre Almost Ready!






Some pics of South Market from today:

































The Jung Hotel and The California Building today:








Finally started construction on my house too !!!!














I really like how this proposal shows a park on top of my house! lol

Inside plans for Charity Hospital: Dallas developer pitches $232 million renovation



Also weird how city hall isnt shown but everything else is. Do they know something we dont?


http://www.nola.com/business/index.s...ospital_3.html





New Orleans airport gets new non-stop to Las Vegas


http://www.nola.com/news/index.ssf/2...siness_article

Last edited by tennis1400; Aug 14, 2015 at 10:23 PM.
Reply With Quote
     
     
  #10256  
Old Posted Aug 15, 2015, 1:08 AM
prokowave prokowave is offline
Registered User
 
Join Date: Jun 2010
Posts: 526
HRI and CHR both look pretty solid. HRI has a strong track record in the area, so I'm sure they would do a good job. Of course selling the building outright might not be a bad idea. Perhaps there could be an arrangement to ensure that the sale only goes through once the development proceeds? It would be a nice boost to the city's property tax rolls as well as the state budget. It looks like the Matthews group want to be paid to develop the property - pretty unbelievable!
Reply With Quote
     
     
  #10257  
Old Posted Aug 16, 2015, 5:43 PM
polemic polemic is offline
Registered User
 
Join Date: Apr 2011
Posts: 125
Congrats on breaking ground, Tennis! Probably the first single family home to be built within 5 blocks in any direction of that location in the last 50 years. Don't know if that means you're crazy or a visionary! =)
Reply With Quote
     
     
  #10258  
Old Posted Aug 16, 2015, 6:54 PM
tennis1400 tennis1400 is offline
-
 
Join Date: Aug 2003
Posts: 7,474
Quote:
Originally Posted by polemic View Post
Congrats on breaking ground, Tennis! Probably the first single family home to be built within 5 blocks in any direction of that location in the last 50 years. Don't know if that means you're crazy or a visionary! =)
I dont know if im crazy or not either lol That said the zoning in the area doesnt allow for single or two family homes (this is the new CZO). So I guess i will forever be the only one.

Last edited by tennis1400; Aug 16, 2015 at 7:08 PM.
Reply With Quote
     
     
  #10259  
Old Posted Aug 17, 2015, 5:04 PM
Eightball's Avatar
Eightball Eightball is offline
life is good
 
Join Date: Jun 2013
Location: all over
Posts: 2,301
Reply With Quote
     
     
  #10260  
Old Posted Aug 17, 2015, 5:18 PM
tennis1400 tennis1400 is offline
-
 
Join Date: Aug 2003
Posts: 7,474
Quote:
Originally Posted by Eightball View Post
Its really amazing how far freret has come since the 70s, has really become a neat street. Also, Interesting to see they are doing a Froyo type shop. Thought that trend came and went already!


Some pics from projects Woodward Design Build has recently finished:


Xavier Student Athletic Center:




The Giani Building:


















The Old No. 77 Hotel



















NOCCA Forum Building:




Ace Hotel Pool Installation:




St Annas Apartments:








Last edited by tennis1400; Aug 17, 2015 at 6:01 PM.
Reply With Quote
     
     
This discussion thread continues

Use the page links to the lower-right to go to the next page for additional posts
 
 
Reply

Go Back   SkyscraperPage Forum > Global Projects & Construction > City Compilations
Forum Jump



Forum Jump


All times are GMT. The time now is 8:24 AM.

     
SkyscraperPage.com - Archive - Privacy Statement - Top

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2024, vBulletin Solutions, Inc.