Peter George Centre for Living and Learning | ? | 12fl | Complete

From Daily Commercial News

McMaster U student building construction set to start

by PATRICIA WILLIAMS Oct 28, 2016
Hamilton’s McMaster University is poised to break ground on a new multi-purpose building that will house in part a student residence, classrooms and student activity and lounge space.
Ground is expected to be broken in November 2016 on the Living Learning Centre at McMaster University in Hamilton, Ont. The 12-storey, 359,000-square-foot building will house a student residence, classrooms and a student wellness centre. The $118-million project is being financed by the university. Architects are Diamond Schmitt.
Ground is expected to be broken in November 2016 on the Living Learning Centre at McMaster University in Hamilton, Ont. The 12-storey, 359,000-square-foot building will house a student residence, classrooms and a student wellness centre. The $118-million project is being financed by the university. Architects are Diamond Schmitt. - Photo: CICADA DESIGN INC.
Designed by Toronto's Diamond Schmitt Architects, the 12-storey, 359,000-square foot Living Learning Centre will provide residence accommodation for 500 students.

The estimated $118-million project is being financed by the university.

"The schedule calls for shovels in the ground by the end of the year," said Antra Roze, an associate in Diamond Schmitt.

The project is being undertaken by a team that includes structural engineers VanBoxmeer & Stranges Ltd. of London, Ont. and mechanical/electrical engineers WSP/MMM Group Ltd. of Thornhill, Ont. A construction manager is being retained.

Completion is scheduled for September, 2019.

Roze, whose firm is no stranger to McMaster, said the Living Learning Centre is the largest building to be constructed to date at the university campus and the first to combine residential and academic functions.

The facility will also house a student wellness centre and a children's daycare centre which was temporarily relocated to the west side of campus after construction began on L.R. Wilson Hall.

"Everyone enters the public atrium space of the building and then filters into the academic spaces, student health services, food services, and even the residential lobby," Roze said via email.

The childcare centre on Level 2 has a dedicated entrance and elevator directly adjacent to the building's main south entrance, bringing young children into the mix.

"This mix of functions and the security concerns that come with it has been an interesting challenge in the design and flow of the building," Roze said.

She said another design challenge has been to "express" the sloped walls of the drum that houses three, stacked auditoriums. This drum is visible on both the outside and inside and must be isolated from surrounding acoustic infiltration and vibration.

The drum is accessed by bridges on the inside that have been designed to maintain this isolation, Roze said.

The exterior drum wall and windows have been detailed with added acoustic separation to ensure that traffic noise from the adjacent parking lot and perimeter roads are not audible in the lecture halls.

"Durability, constructability and functionality all have to come together to make this feature element successful," Roze said.

Given that McMaster is a contemporary university, an "enormous" amount of Internet and power connectivity is required.

New construction details had to be developed to incorporate outlets along perimeter walls, in the open spaces and integrated into furniture and millwork, for example.

One of the three stacked auditoriums embraces a new teaching/learning mythology called Active Learning. This calls for the room to be ringed with wall-mounted monitors that can be linked to individual laptops as a way of interacting and sharing information among 400 students. "Along with the connectivity, there will be video monitors throughout the academic and residential areas to serve as information disseminators and to replace notice boards," Roze said.

"This of course requires a great deal of coordination between building systems, accessibility and special requirements for infrastructure."

LEED Silver is being targeted.

Two "Quonset hut" buildings on the site will be demolished to accommodate construction.

Roze said the Living Learning Centre is a combination of steel and concrete construction "because of the long spans required to accommodate the stacked auditoriums."

Structural engineers VanBoxmeer & Stranges designed a steel truss that is 26 metres long and over 4.5 metres high.

"This giant truss will have to be trucked through the campus and laid into place two storeys above grade."

Roze said the construction schedule will have to take into consideration the surrounding campus "and the necessity to work around activities and keep services running."

To the immediate west of the site is the main campus cafeteria and student services building with its "considerable" student and truck traffic.

Recent Diamond Schmitt projects at McMaster include the Gerald Hatch Engineering Centre for Experiential Learning, the Centre for Biomedical Engineering & Advanced Manufacturing and the CANMET Materials Technology Laboratory at the McMaster Innovation Park.
Reply With Quote
     
     
  #2  
Old Posted Nov 1, 2016, 11:50 PM
Dr Awesomesauce's Avatar
Dr Awesomesauce Dr Awesomesauce is offline
Registered User
 
Join Date: Jan 2010
Location: BEYOND THE OUTER RIM
Posts: 5,889

Source

I can see why there was resistance from those living on Sterling. Not sure I'd be happy about that staring me in the face either.
Reply With Quote
     
     
  #3  
Old Posted Nov 2, 2016, 12:47 AM
eatboots eatboots is offline
Registered User
 
Join Date: Jan 2016
Posts: 243
Between Sterling, Longwood and Traymore, Westdale is going to look very different soon.
Reply With Quote
     
     
  #4  
Old Posted Nov 2, 2016, 1:15 AM
king10 king10 is offline
Registered User
 
Join Date: Feb 2009
Location: Hamilton
Posts: 2,764
Quote:
Originally Posted by Dr Awesomesauce View Post

Source

I can see why there was resistance from those living on Sterling. Not sure I'd be happy about that staring me in the face either.
huh? this won't even be in view of those on Sterling. this building is on campus on the other side of the stadium by the residences

are people getting confused with the proposed private development on main and forsyth? this isn't that
Reply With Quote
     
     
  #5  
Old Posted Nov 2, 2016, 1:41 AM
King&James's Avatar
King&James King&James is offline
Registered User
 
Join Date: Mar 2013
Location: Hamilton
Posts: 1,263
Quote:
Originally Posted by king10 View Post
huh? this won't even be in view of those on Sterling. this building is on campus on the other side of the stadium by the residences

are people getting confused with the proposed private development on main and forsyth? this isn't that
replaces

http://dailynews.mcmaster.ca/wp-cont.../t28-large.jpg

I will go with improvement!
Reply With Quote
     
     
  #6  
Old Posted Nov 2, 2016, 11:50 AM
Dr Awesomesauce's Avatar
Dr Awesomesauce Dr Awesomesauce is offline
Registered User
 
Join Date: Jan 2010
Location: BEYOND THE OUTER RIM
Posts: 5,889
Yep - I got a little mixed up there. Thought I was looking at Sterling and Forsyth.
Reply With Quote
     
     
  #7  
Old Posted Mar 30, 2017, 6:04 PM
SteelTown's Avatar
SteelTown SteelTown is online now
It's Hammer Time
 
Join Date: Mar 2004
Location: Hamilton
Posts: 19,881
Looks like a crane will be installed very soon.

https://twitter.com/McMasterU/status/847102255782416384
Reply With Quote
     
     
  #8  
Old Posted Mar 30, 2017, 11:41 PM
Rg2016 Rg2016 is offline
Registered User
 
Join Date: Dec 2016
Posts: 80
Quote:
Originally Posted by SteelTown View Post
Looks like a crane will be installed very soon.

https://twitter.com/McMasterU/status/847102255782416384
That's the same machine I saw at the Queen st. 23 floor condo site...
Reply With Quote
     
     
  #9  
Old Posted Mar 31, 2017, 7:50 PM
SteelTown's Avatar
SteelTown SteelTown is online now
It's Hammer Time
 
Join Date: Mar 2004
Location: Hamilton
Posts: 19,881
Reply With Quote
     
     
  #10  
Old Posted Apr 27, 2017, 10:14 PM
LikeHamilton's Avatar
LikeHamilton LikeHamilton is offline
Registered User
 
Join Date: Apr 2006
Location: Hamilton, Ontario
Posts: 2,704
Former McMaster University President Peter George dies at age 75

here is sad news out of McMaster University.

Peter George, who served three terms as president and vice-chancellor before retiring in 2010, has died at age 75.

A release from the university, notes that George oversaw a period of major growth for McMaster, in terms of size, reach and reputation.

Current president Patrick Deane, who succeeded George, says “McMaster University is very fortunate to have had such a champion as Peter George.”

Deane adds that his predecessor’s legacy “is most apparent in the achievements of our students and researchers, to whose success he was always so dedicated.”

George had been part of the McMaster community since 1965, when he first started as a lecturer in economics. He become the university’s sixth president and vice-chancellor in 1995.

George became a member of the Order of Canada in 1999, and the Order of Ontario in 2007.

http://globalnews.ca/news/3410212/fo...ies-at-age-75/
Reply With Quote
     
     
  #11  
Old Posted Apr 29, 2017, 6:44 AM
ScreamingViking's Avatar
ScreamingViking ScreamingViking is online now
Ham-burgher
 
Join Date: Jun 2013
Location: Hamilton
Posts: 6,521
George took the presidency as I was finishing my grad studies, but I feel he was such a difference maker compared to his predecessors. His contributions to the growth of McMaster have been acknowledged, but I think any acknowledgement is still incapable of capturing the eventual breadth of George's long term legacy.

In a large part because of him, McMaster is firmly placed among Canada's top research/educational institutions, and a star on the map of globally significant universities.

Thank you Peter George.
Reply With Quote
     
     
  #12  
Old Posted Apr 30, 2017, 1:38 AM
Dr Awesomesauce's Avatar
Dr Awesomesauce Dr Awesomesauce is offline
Registered User
 
Join Date: Jan 2010
Location: BEYOND THE OUTER RIM
Posts: 5,889
The role of president or chancellor of a university really started to change around the time he took over - less about academics and more about business.

As a quasi-academic myself, I'm far more concerned with what's happening in the classroom and there are certainly issues there. But on the other end of things, he done good for Mac.
Reply With Quote
     
     
  #13  
Old Posted Jun 7, 2017, 12:41 AM
thomax's Avatar
thomax thomax is offline
Registered User
 
Join Date: May 2012
Location: Toronto
Posts: 5,380
Reply With Quote
     
     
  #14  
Old Posted Jul 23, 2017, 3:57 PM
thomax's Avatar
thomax thomax is offline
Registered User
 
Join Date: May 2012
Location: Toronto
Posts: 5,380
Reply With Quote
     
     
  #15  
Old Posted Jul 23, 2017, 10:07 PM
ScreamingViking's Avatar
ScreamingViking ScreamingViking is online now
Ham-burgher
 
Join Date: Jun 2013
Location: Hamilton
Posts: 6,521
Really going to change that view from the stadium stands in a huge way.
Reply With Quote
     
     
  #16  
Old Posted Mar 19, 2018, 1:52 AM
thomax's Avatar
thomax thomax is offline
Registered User
 
Join Date: May 2012
Location: Toronto
Posts: 5,380
Reply With Quote
     
     
  #17  
Old Posted Jun 9, 2018, 11:06 PM
thomax's Avatar
thomax thomax is offline
Registered User
 
Join Date: May 2012
Location: Toronto
Posts: 5,380
Reply With Quote
     
     
  #18  
Old Posted Aug 16, 2018, 1:08 PM
SteelTown's Avatar
SteelTown SteelTown is online now
It's Hammer Time
 
Join Date: Mar 2004
Location: Hamilton
Posts: 19,881

Sean Van Koughnett
https://twitter.com/Sean_VK
Reply With Quote
     
     
  #19  
Old Posted Aug 16, 2018, 5:59 PM
Chronamut's Avatar
Chronamut Chronamut is offline
Hamilton Historian
 
Join Date: Sep 2013
Location: Hamilton
Posts: 3,145
wow that is QUITE the imposing structure..
Reply With Quote
     
     
  #20  
Old Posted Aug 21, 2018, 10:07 PM
GeneralLeeTPHLS's Avatar
GeneralLeeTPHLS GeneralLeeTPHLS is offline
Midtowner since 2K
 
Join Date: Aug 2015
Location: Midtown Toronto
Posts: 5,410
Two days ago, off the freeway near the Mountain:
[IMG]DSC_8296 by Josh Kenn Photographics, on Flickr[/IMG]
__________________
"Living life on the edge"
Reply With Quote
     
     
This discussion thread continues

Use the page links to the lower-right to go to the next page for additional posts
 
 
Reply

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Ontario > Hamilton > Downtown & City of Hamilton
Forum Jump



Forum Jump


All times are GMT. The time now is 10:33 PM.

     
SkyscraperPage.com - Archive - Privacy Statement - Top

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2024, vBulletin Solutions, Inc.