HomeDiagramsDatabaseMapsForum About
     

Go Back   SkyscraperPage Forum > Discussion Forums > Buildings & Architecture > Completed Project Threads Archive


    Lotte World Tower in the SkyscraperPage Database

Building Data Page   • Comparison Diagram   • Seoul Skyscraper Diagram

Map Location

 

 
Thread Tools Display Modes
     
     
  #1  
Old Posted Mar 17, 2014, 6:01 AM
chris08876's Avatar
chris08876 chris08876 is offline
NYC/NJ/Miami-Dade
 
Join Date: Jul 2013
Location: Riverview Estates Fairway (PA)
Posts: 45,696
MIAMI | Biscayne Beach | 585 | 51 FLOORS




Quote:
The 399-unit residential project will be located on 29th street and Biscayne Bay, in a neighborhood that is exploding with new development.

Construction of the 51-floor tower is set to begin in the 1st quarter of 2014.
===============================
http://www.exmiami.org/index.php/a-f...iscayne-beach/

Last edited by Urbannizer; May 6, 2017 at 12:53 AM.
     
     
  #2  
Old Posted Mar 27, 2014, 9:40 AM
chris08876's Avatar
chris08876 chris08876 is offline
NYC/NJ/Miami-Dade
 
Join Date: Jul 2013
Location: Riverview Estates Fairway (PA)
Posts: 45,696
A very nice 26 page digital brochure full of images, tons of renderings, and information on the units and development. Very detailed.

-------------> http://www.biscaynebeachresidences.c...h_brochure.pdf

Last edited by chris08876; Mar 27, 2014 at 10:09 AM.
     
     
  #3  
Old Posted May 2, 2014, 1:38 AM
chris08876's Avatar
chris08876 chris08876 is offline
NYC/NJ/Miami-Dade
 
Join Date: Jul 2013
Location: Riverview Estates Fairway (PA)
Posts: 45,696
     
     
  #4  
Old Posted May 2, 2014, 1:47 PM
UrbanImpact's Avatar
UrbanImpact UrbanImpact is offline
Registered User
 
Join Date: Jul 2002
Location: Fort Lauderdale, FL
Posts: 1,356
I'm digging the hat on top.
     
     
  #5  
Old Posted Jun 27, 2014, 11:34 PM
bobdreamz's Avatar
bobdreamz bobdreamz is offline
Registered User
 
Join Date: Mar 2002
Location: Miami/Orlando, FL.
Posts: 8,123
Biscayne Beach is under construction

Miami's 6th. tower over 500 feet | 152 m is now officially under construction according to the CTBUH.

Facts:

Official Name : Biscayne Beach
Type : Residential building
Status : Under Construction
Address : 701 NE 29th Street , Miami, FL.
Neighborhood : Edgewater
Structural Material : Concrete
Start of Construction : May 2014
Completion: 2016

Figures:

Height: Architectural | 167.7 meter / 550 feet
Height: To Tip | 167.7 meter / 550 feet
Floors Above Ground 51 stories
# of Units : 399
Developers : Eastview Development; GTIS Partners
Architect : WHLC Architecture
Main Contractor : Moss & Associates LLC

Source : http://www.skyscrapercenter.com/miam...e-beach/17031/







pics by QuantumX



pic by miami1
__________________
Miami : 62 Skyscrapers over 500+ Ft.|150+ Meters | 14 Under Construction.
     
     
  #6  
Old Posted Jul 24, 2014, 11:25 AM
chris08876's Avatar
chris08876 chris08876 is offline
NYC/NJ/Miami-Dade
 
Join Date: Jul 2013
Location: Riverview Estates Fairway (PA)
Posts: 45,696

Credit: ExMiami
     
     
  #7  
Old Posted Aug 26, 2014, 12:36 AM
chris08876's Avatar
chris08876 chris08876 is offline
NYC/NJ/Miami-Dade
 
Join Date: Jul 2013
Location: Riverview Estates Fairway (PA)
Posts: 45,696
Biscayne Beach Gets $120M Construction Loan From Blackstone

Quote:
Developers building the 51-story Biscayne Beach condo tower have obtained a $120 million construction loan.

An affiliate of Blackstone Real Estate Debt Strategies provided the funding, which offers future draws that cap out at $240 million. Blackstone also recently provided a $290 million loan to the Four Seasons at the Surf Club in Surfside.

Construction on the 399-unit tower began in April. The developers are GTIS Partners and Eastview Development.
===============================
http://www.exmiami.org/index.php/bis...om-blackstone/
     
     
  #8  
Old Posted Nov 28, 2014, 2:47 AM
chris08876's Avatar
chris08876 chris08876 is offline
NYC/NJ/Miami-Dade
 
Join Date: Jul 2013
Location: Riverview Estates Fairway (PA)
Posts: 45,696
Foundation In Place, 51-Story Biscayne Beach Ready To Go Vertical

Quote:
On November 22, a convoy of trucks poured about 6500 tons of cement to create the foundation for the 51-story tower. The continuous pour lasted 12 hours, with about 300 cubic yards of cement poured per hour .

Developers Eastview Development and GTIS Partners have submitted plans to the FAA to build to a height of 593 feet above ground. Those plans are still being reviewed by the agency.

A tower crane is also now in place at the construction site, located at 711 NE 29th Street (see photos below).

When complete, Biscayne Beach will include 399 units. Hamptons-based eatery Tutto Il Giorno will be a tenant in the beach club.


==============================
http://www.thenextmiami.com/index.ph...y-go-vertical/
     
     
  #9  
Old Posted Dec 15, 2014, 6:30 AM
chris08876's Avatar
chris08876 chris08876 is offline
NYC/NJ/Miami-Dade
 
Join Date: Jul 2013
Location: Riverview Estates Fairway (PA)
Posts: 45,696
     
     
  #10  
Old Posted Feb 21, 2015, 6:20 AM
chris08876's Avatar
chris08876 chris08876 is offline
NYC/NJ/Miami-Dade
 
Join Date: Jul 2013
Location: Riverview Estates Fairway (PA)
Posts: 45,696
Updated top rendering:


Credit: http://www.biscaynebeachcondo.com/ (Gallery Section)

Biscayne Beach with other developments: (Compared to older one couple posts above)


Credit: http://www.biscaynebeachcondo.com/ (Gallery Section)
     
     
  #11  
Old Posted Mar 6, 2015, 5:44 PM
chris08876's Avatar
chris08876 chris08876 is offline
NYC/NJ/Miami-Dade
 
Join Date: Jul 2013
Location: Riverview Estates Fairway (PA)
Posts: 45,696
     
     
  #12  
Old Posted Apr 7, 2015, 3:06 AM
chris08876's Avatar
chris08876 chris08876 is offline
NYC/NJ/Miami-Dade
 
Join Date: Jul 2013
Location: Riverview Estates Fairway (PA)
Posts: 45,696
     
     
  #13  
Old Posted May 4, 2015, 9:25 PM
chris08876's Avatar
chris08876 chris08876 is offline
NYC/NJ/Miami-Dade
 
Join Date: Jul 2013
Location: Riverview Estates Fairway (PA)
Posts: 45,696






Quote:
With Miami real estate prices on the rise and inbound investment pouring into the market at record pace, East Edgewater newest luxury condominium is moving onward and upward. Vertical construction at Biscayne Beach, a 51-story waterfront tower located at 711 NE 29th Street along Biscayne Bay, is well underway – with crews already surpassing the fifth-floor level. With one full level expected to be completed every week for the next 42 weeks, the 399-unit project is on track to top-off construction and deliver in 2016.

Biscayne Beach is being developed by a joint venture between South Florida-based real estate development firm Eastview Development and GTIS Partners, a global real estate investment firm headquartered in New York with more than $2.3 billion in assets throughout the U.S. and Brazil.

Biscayne Beach currently stands at approximately 95 percent sold, with only a limited selection of recently-released penthouses remaining for sale. Measuring up to approximately 12,000 square feet in size, the tower’s ultra-luxury penthouse residences feature 12 to 14-foot ceilings, expansive outdoor living spaces and sweeping views; exclusive two-story upper penthouses include private rooftop terraces with swimming pools and summer kitchens. Preconstruction prices for Biscayne Beach’s penthouse units range from $2 million and up.

Boasting a premier, waterfront location along Biscayne Bay, Biscayne Beach’s resort-style amenities will include a private members-only Beach Club on the bay with an elevated sandy beach, private cabanas, zero-entry pool, daytime concierge services, as well as a renowned restaurant and bar. All of these features will be set against the backdrop of sweeping Biscayne Bay views, with a public bay walk providing access to the water – complete with bay-side piers for swimming, kayaking, paddle boarding, and more.

World-renowned interior design star Thom Filicia – famously known for his role on the Emmy Award-winning show Queer Eye for the Straight Guy – is creating the sophisticated ‘beach chic’ designs for the project’s common area amenity spaces, Beach Club level, and exclusive residences.
=============================
http://www.thenextmiami.com/index.ph...ave-been-sold/
     
     
  #14  
Old Posted May 5, 2015, 1:18 AM
rothko's Avatar
rothko rothko is offline
Registered User
 
Join Date: Apr 2015
Posts: 13
I LOVE the part at the top and how it draws attention to the building's curved element.
     
     
  #15  
Old Posted May 28, 2015, 2:23 AM
chris08876's Avatar
chris08876 chris08876 is offline
NYC/NJ/Miami-Dade
 
Join Date: Jul 2013
Location: Riverview Estates Fairway (PA)
Posts: 45,696
     
     
  #16  
Old Posted Sep 3, 2015, 9:42 PM
chris08876's Avatar
chris08876 chris08876 is offline
NYC/NJ/Miami-Dade
 
Join Date: Jul 2013
Location: Riverview Estates Fairway (PA)
Posts: 45,696




Quote:
Miami’s Biscayne Beach Condominium is Rising Fast; Construction Reaches 25th Floor

The 399-unit waterfront tower is on track for completion in late 2016.

MIAMI, FL – September 3, 2015 – Construction is moving along at a rapid pace at Biscayne Beach, a new 52-story luxury condominium project underway in Miami’s East Edgewater neighborhood. Crews have already surpassed the building’s 25th floor, with one full level being completed every five days. With nearly all of its 399 units already sold, the waterfront tower is on track to top-off construction in March of 2016 and deliver later in the year.

On the heels of Biscayne Beach’s success, the project’s development team recently launched sales for its newest condominium project, Elysee Residences. The 57-story boutique tower will feature only 100 luxury residences, with preconstruction prices starting at $1.65 million. The project is expected to break ground in the first quarter of 2016, with completion slated for the second quarter of 2018.

Boasting a premier, waterfront location along Biscayne Bay, Biscayne Beach’s resort-style amenities will include a private members-only Beach Club on the bay with an elevated sandy beach, private cabanas, zero-entry pool, daytime concierge services, as well as a renowned restaurant and bar. All of these features will be set against the backdrop of sweeping Biscayne Bay views, with a public bay walk providing access to the water – complete with bay-side piers for swimming, kayaking, paddle boarding, and more.

World-renowned interior design star Thom Filicia – famously known for his role on the Emmy Award-winning show Queer Eye for the Straight Guy – is creating the sophisticated ‘beach chic’ designs for the project’s common area amenity spaces, Beach Club level, and exclusive residences.
============
tnm
     
     
  #17  
Old Posted Oct 10, 2015, 11:02 PM
chris08876's Avatar
chris08876 chris08876 is offline
NYC/NJ/Miami-Dade
 
Join Date: Jul 2013
Location: Riverview Estates Fairway (PA)
Posts: 45,696
     
     
  #18  
Old Posted Oct 25, 2015, 4:15 AM
chris08876's Avatar
chris08876 chris08876 is offline
NYC/NJ/Miami-Dade
 
Join Date: Jul 2013
Location: Riverview Estates Fairway (PA)
Posts: 45,696



NXT
     
     
  #19  
Old Posted Dec 3, 2015, 2:49 AM
chris08876's Avatar
chris08876 chris08876 is offline
NYC/NJ/Miami-Dade
 
Join Date: Jul 2013
Location: Riverview Estates Fairway (PA)
Posts: 45,696
Crews Respond to Construction Site Accident in Miami


Quote:
Miami Fire-Rescue responded to a fatal construction accident Wednesday afternoon.

It happened at the Biscayne Beach condos located at 711 Northeast 29th Street.

According to MFR, a piece of equipment hoisted in the air from a crane somehow came loose and struck the worker, who was on the 37th floor.
Officials said the man, who was in his 30s, died on the scene from his injuries.

Authorities said other construction workers witnessed the incident and tried to help. They said they'll now have to bring in a Technical Rescue Team to bring the body down from the top of the building.

"Some of the areas are not accessible by elevator, so as a result, you have to take them down by stairs. But sometimes that's not the case. Sometimes we have to use the cranes to lower them down to the ground," said Capt. Ignatius Carroll with MFR.

Authorities are still investigating the cause, and looking into whether this was an accident or a faulty piece of machinery.
=====================
http://www.nbcmiami.com/news/local/C...360123361.html
     
     
  #20  
Old Posted Jan 23, 2016, 4:09 AM
dave8721 dave8721 is offline
Registered User
 
Join Date: Jul 2005
Location: Miami
Posts: 4,036
Just another forgotten 50+ story tower going up in Miami. Another batch (the Paraiso mega-project going on the right), one of the Midtown towers going up in the background and some smaller Edgewater infill projects as well
https://www.flickr.com/photos/97706129@N05/24116446229
     
     
This discussion thread continues

Use the page links to the lower-right to go to the next page for additional posts
 
 
 

Go Back   SkyscraperPage Forum > Discussion Forums > Buildings & Architecture > Completed Project Threads Archive
Forum Jump


Thread Tools
Display Modes

Forum Jump


All times are GMT. The time now is 4:42 AM.

     
SkyscraperPage.com - Archive - Privacy Statement - Top

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2024, vBulletin Solutions, Inc.