Quote:
Originally Posted by SkydivePilot
I heard from a friend during the summer of '13 that there were cracks in the structure due-to-the-fact that there was not enough curing time for the concrete. I didn't want to say anything on here before without corroboration.
|
There was proper hoarding. It's the actual structure / design that is the issue. Some of the supports were not to code for a structure it's size but this is what the design called for and they insisted it was done this way. Also there were some ( I won't mention ) city folks involved that pushed things along do to the mess from the start with another ( I won't mention ) party
.
It's a great venue. It's was a venue designed improperly though. They pretty much hashed together the original design which would have had an enclosed roof system with another and threw it in a blender and you got this.
Inspectors were ( cough ) helping a certain group also in getting it fast tracked as it was so late to start with.
I'd tell you more but I do not need any law suits either lol
As for Regina's. I hope they take their time. 2016 seems to soon for an opening. Our springs and summers and winters are so unpredictable. They have the same time line as we hoped to have. It's when they fall behind that short cuts happen.
I am assuming the old field will be left standing till it is finished 1oo% and tested !
I really like the green shaded glass though. Hope they stick with it.