HomeDiagramsDatabaseMapsForum About
     

Go Back   SkyscraperPage Forum > Regional Sections > Asia-Pacific > Taiwan


Reply

 
Thread Tools Display Modes
     
     
  #221  
Old Posted Apr 3, 2011, 2:31 AM
williamchung taiwan's Avatar
williamchung taiwan williamchung taiwan is offline
Registered User
 
Join Date: Feb 2008
Posts: 3,367

Kaohsiung City Library

taiwan-city forum
Reply With Quote
     
     
  #222  
Old Posted Apr 5, 2011, 9:05 AM
williamchung taiwan's Avatar
williamchung taiwan williamchung taiwan is offline
Registered User
 
Join Date: Feb 2008
Posts: 3,367
2011TRAA 台灣住宅建築獎 初選入圍名單

單棟住宅建築類(14件)

莊宅 House C
地點:台北市陽明山
設計單位:何侯設計






台北陳宅
地點:台北市陽明山
設計單位:竹間聯合建築師事務所、築工房設計、明室設計






水邊森 山林小屋
地點:新竹縣寶山鄉寶山水庫旁
設計單位:林淵源建築師事務所






A House with Wings
設計單位:考工記工程顧問有限公司 / 洪育成建築師






竹北–林宅
地點:新竹縣竹北市
設計單位:吳金泰建築師事務所






House Flora
地點:台中市
設計單位:behet bondzio lin 建築師事務所(林友寒) + 何東光建築師






光霽
地點:台中市大富街
設計單位:永續建築師事務所






嘉義王宅
地點:嘉義市吳鳳南路
設計單位:i2建築研究室 / 徐純一建築師






台南李宅
地點:台南市中西區文和路
設計單位:許錦榮建築師事務所






台南卓宅
地點:台南市安南區
設計單位:毛森江建築工作室






台南林宅
地點:台南市南區
設計單位:毛森江建築工作室






台南林公館
地點:台南市
設計單位:胡碩峰建築工作室





歸仁蔡宅
地點:台南縣歸仁鄉中山北路二段417號
設計單位:徐岩奇建築師事務所






宜蘭五結簡宅
地點:宜蘭縣五結鄉
設計單位:大藏聯合建築師事務所






集合住宅建築類(16件)

光影露台
地點:新竹縣寶山鄉
設計單位:石間設計工作室
業主:王智力






THE HOUSE
地點:台北縣林口鄉東湖路56巷33號
設計單位:蕭家福建築師事務所、十月設計
建設公司:宏泰建設、怡和國際開發實業股份有限公司






三希堂
地點:台南市府平路386巷37、39、41號
設計單位:張景堯建築師事務所
建設公司:成昱開發股份有限公司






安平單伸手
地點:台南市安平區同平路176號
設計單位:凸透設計有限公司
建設公司:凸透設計有限公司






白鷺灣J系列
地點:台南市安北路白鷺灣社區
設計單位:張景堯建築師事務所+許錦榮建築師事務所
建設公司:府都建設、J2屋主






大業路住宅
地點:台中市西區大業路
設計單位:葉嘉建築師事務所






寬域Ⅱ
地點:台中市北屯區豐樂路二段
設計單位:雅門建築師事務所
建設公司:磐興建設






過院來
地點:台北市士林區中庸二路
設計單位:李天鐸建築師事務所
建設公司:璞磐建設、東家建設






菩方田
地點:台北市士林區菁山路72巷16號等
設計單位:黃宏輝建築師事務所
建設公司:震一建設股份有限公司






先得月
地點:台北市文山區政大三街109、120號
設計單位:金以容建築師事務所
建設公司:璞德建設股份有限公司、德悅建設股份有限公司






麗池會
地點:台北市內湖區民權東路六段206巷121〜135號
設計單位:金以容建築師事務所
建設公司:百詮建設股份有限公司、美德開發股份有限公司






微風建設–宅2平方
地點:台南市安平區文平路80號
設計單位:林添安建築師事務所
建設公司:微風建設股份有限公司





信義ME∕Modern East
地點:台北市信義路五段91巷
設計單位:陳柏壽建築師事務所
建設公司:森聯關係機構






東騰攬翠
地點:台北市文山區萬隆段
設計單位:李天鐸建築師事務所
建設公司:東騰開發股份有限公司






建築與詩
地點:台中市西屯區龍門路(新市政中心西側)
設計單位:許獻叡建築師事務所
建設公司:理和建設股份有限公司






白鷺灣二期
地點:台南市安北路
設計單位:張景堯建築師事務所+許錦榮建築師事務所
建設公司:府都建設股份有限公司






高層集合住宅類(12件)

僑果復興南路住宅
地點:台北市復興南路
設計單位:大元聯合建築師事務所
建設公司:僑果實業股份有限公司






述森林
地點:台中市文心路191號
設計單位:劉偉彥、許榮江建築師事務所
建設公司:宏銓建設股份有限公司






中山紀汎希住商大樓
地點:台北市中山北路一段101號
設計單位:吳明修建築師事務所
建設公司:興富發建設、保強建設






森之丘
地點:台北市南港區東新街122號等
設計單位:金以容建築師事務所
建設公司:太平洋建設股份有限公司






樸真 久.石.讓
地點:台北市松山區南京東路四段110號(寧安街口)
設計單位:黃模春、張矩墉、陳浩雲建築師事務所
建設公司:璞真建設股份有限公司






陸江A+
地點:新北市三重區集賢路117號
設計單位:金以容建築師事務所
建設公司:陸江建設機構–翰江建設股份有限公司






君悅
地點:桃園縣龜山鄉文化村15鄰文心路213號等
設計單位:黃宏輝建築師事務所
建設公司:福樺建設股份有限公司






惠宇科博觀邸
地點:台中市西區中興街
設計單位:技聯組工程顧問股份有限公司、莊永芳建築師事務所
建設公司:惠宇營建機構–惠昇建設股份有限公司






大觀文明
地點:台北縣林口鄉忠孝路
設計單位:黃宏輝建築師事務所
建設公司:福樺建設股份有限公司






似水年華
地點:台中市市政北五路66號
設計單位:黃永沃建築師事務所+廖明隆建築師事務所
建設公司:生產力建設






惠宇天青
地點:台中市市政北一路58號
設計單位:劉偉彥、許榮江建築師事務所
建設公司:惠宇建設






藍海
地點:新北市淡水鎮中正東路二段111號
設計單位:李祖原聯合建築師事務所
建設公司:大隱開發、藍海建設


Last edited by williamchung taiwan; Apr 5, 2011 at 11:38 AM.
Reply With Quote
     
     
  #223  
Old Posted Apr 27, 2011, 8:16 AM
williamchung taiwan's Avatar
williamchung taiwan williamchung taiwan is offline
Registered User
 
Join Date: Feb 2008
Posts: 3,367





Uncomfirmed information, a 36Fl redevelopment project near Xinyi District.
But I do know it will at least have 30fl.
Reply With Quote
     
     
  #224  
Old Posted May 26, 2011, 7:48 AM
williamchung taiwan's Avatar
williamchung taiwan williamchung taiwan is offline
Registered User
 
Join Date: Feb 2008
Posts: 3,367
Quote:
Originally Posted by williamchung taiwan View Post
Taipei Dome

Rendering


Height
北市大巨蛋開發案 環評有條件通過 【13:34】


〔記者林相美/台北報導〕歷經8年環評,台北市政府環評委員今天以8票有條件通過大巨蛋開發案,環評委員主要要求開發單位遠雄再縮減量體,附屬事業(商場、影城、旅館、辦公大樓)的建築樓地板面積應降為20萬平方公尺以下,降幅達17.4%,而停車空間的建築樓地板面積應恢復為18萬7965平方公尺。

 遠雄公共事務室副總經理蔡宗易表示,將再開會討論修正內容,但BOT的精神總不能讓民間虧損50年,若持續虧損,政府自己做就好了。

 環團抗議,環評審查、表決都不符合程序正義,將尋求司法途徑提告,並爭取台北市議員支持,尋求議會翻案空間。

 環保局舉行大巨蛋替代方案環評會議,經過近4小時討論,13位出席委員不計名投票表決,8票有條件通過,2票為應進入二階環評,3票為不予開發。

 有條件通過的條件除降低量體外,另包括建案應取得銀級以上候選綠建築證書及綠建築標章;忠孝東路側內退縮增加一車道,訂定施工期間及營運期間交通計畫,避免體育園區車流進入忠孝東路四段553巷,計畫應提送交通局審核後才可執行。



People, Taipei Dome has pass environmental impact assessment process, it definitely will be built.

However, the bad news is the commercial capacity has to reduce another 17.4% and the development has to set back further for another road lane for Chung Hsiao East Road.
Reply With Quote
     
     
  #225  
Old Posted Jun 20, 2011, 7:22 AM
williamchung taiwan's Avatar
williamchung taiwan williamchung taiwan is offline
Registered User
 
Join Date: Feb 2008
Posts: 3,367
Quote:
Originally Posted by williamchung taiwan View Post
北市大巨蛋開發案 環評有條件通過 【13:34】


〔記者林相美/台北報導〕歷經8年環評,台北市政府環評委員今天以8票有條件通過大巨蛋開發案,環評委員主要要求開發單位遠雄再縮減量體,附屬事業(商場、影城、旅館、辦公大樓)的建築樓地板面積應降為20萬平方公尺以下,降幅達17.4%,而停車空間的建築樓地板面積應恢復為18萬7965平方公尺。

 遠雄公共事務室副總經理蔡宗易表示,將再開會討論修正內容,但BOT的精神總不能讓民間虧損50年,若持續虧損,政府自己做就好了。

 環團抗議,環評審查、表決都不符合程序正義,將尋求司法途徑提告,並爭取台北市議員支持,尋求議會翻案空間。

 環保局舉行大巨蛋替代方案環評會議,經過近4小時討論,13位出席委員不計名投票表決,8票有條件通過,2票為應進入二階環評,3票為不予開發。

 有條件通過的條件除降低量體外,另包括建案應取得銀級以上候選綠建築證書及綠建築標章;忠孝東路側內退縮增加一車道,訂定施工期間及營運期間交通計畫,避免體育園區車流進入忠孝東路四段553巷,計畫應提送交通局審核後才可執行。



People, Taipei Dome has pass environmental impact assessment process, it definitely will be built.

However, the bad news is the commercial capacity has to reduce another 17.4% and the development has to set back further for another road lane for Chung Hsiao East Road.

Farglory group get construction certificate, the construction work will start in October.
Reply With Quote
     
     
  #226  
Old Posted Jul 1, 2011, 2:36 PM
duabi duabi is offline
ROF
 
Join Date: Aug 2002
Posts: 570
The new hotel in Tamsui:
http://fishermen-wharf.fullon-hotels.com.tw/?Psn=6205
click: 美圖分享 to see more photos
Reply With Quote
     
     
  #227  
Old Posted Jul 5, 2011, 6:22 AM
williamchung taiwan's Avatar
williamchung taiwan williamchung taiwan is offline
Registered User
 
Join Date: Feb 2008
Posts: 3,367


Taipei Information Park (臺北資訊園區-光華特區)

taiwan-city forum hitpopvicto
Reply With Quote
     
     
  #228  
Old Posted Jul 5, 2011, 2:01 PM
kalifese kalifese is offline
Registered User
 
Join Date: Apr 2011
Posts: 378
i like the tower. but the base design is super ugly and doesnt match the tower design.
Reply With Quote
     
     
  #229  
Old Posted Jul 26, 2011, 9:03 AM
williamchung taiwan's Avatar
williamchung taiwan williamchung taiwan is offline
Registered User
 
Join Date: Feb 2008
Posts: 3,367
ShongShan Train Station (New Design)

taiwan-city forum
by eason



Reply With Quote
     
     
  #230  
Old Posted Jul 26, 2011, 10:36 PM
metroXpress's Avatar
metroXpress metroXpress is offline
(||||||-||||-||||||)
 
Join Date: Jan 2009
Location: Vancouver B.C.
Posts: 2,220
all the new train stations are mixed use development projects; i like the green space in this one
__________________
"Think simple…reduce the whole
of its parts into the simplest terms,
Getting back to first principles"


~ FRANK LLOYD WRIGHT
Reply With Quote
     
     
  #231  
Old Posted Aug 25, 2011, 2:47 PM
williamchung taiwan's Avatar
williamchung taiwan williamchung taiwan is offline
Registered User
 
Join Date: Feb 2008
Posts: 3,367
http://www.npm.gov.tw/UserFiles/File...0E-I52-149.pdf

The Grand Palace Museum Project
The Museum’s advisory committee suggested in session 2
of its 3rd meeting that “the Grand Palace Museum Project
should include the Culture and Creative Park as part of its
plan. A well-laid proposal and an efficient integration of
human and financial resources are necessary for the Project
to succeed.” On January 1, 2010, President Ma Ying-jeou
attended the briefing at the Museum and instructed that “the
priority is to expand the exhibition area and improve the
environment to cope with the growth of visitors and relieve
the crowdedness. Director Chou and all the Museum staff
should evaluate the feasibility and necessity of the Project and
invite experts to provide professional opinions on security,
legal requirements and other issues.”
Infrastructure
Museum expansion.
Cultural and Creative Industry Center (Main Facilities):
(1) Cultural and Creative Administrative Center (including
offices and classrooms), (2) Chinese Character, Water and
Ink Museum, and (3) Culture and Creative Exhibition
Space.
Cultural and Creative Industry Park (Ancillary Facilities):
(1) International Convention Center, (2)Cultural and
Creative Shop(s), (3) Cafés and Restaurants.
Renovation and surveillance of the rear hill slope for
extreme weather (General budget): The Museum entrusted
Prof. Liu Kofei of the National Taiwan University to do a
regression analysis (of 2,000 years) and predict the possible
scope of disaster (such as landslide and flood) along the
rear hill slope under extreme downpour.
Planning for the Infrastructure
On March 10, 2010, the Project Planning Committee
held its 1st meeting and reached a conclusion that the
total budget should be around 10 to 12 billion NT dollars
and the Museum should ask for the Executive Yuan’s
permission to cover the expanse using the budget for the
Cultural and Creative Park (“The 2nd-Stage Plan for
Developing Cultural and Creative Industries: Turning the
National Palace Museum into a Global Center of Cultural
and Creative Industries”).
On March 24, “The Guidelines for the Establishment of
the Planning Commission for the Grand Palace Museum”
was approved.
On April 7, the Project Planning Committee held its 3rd
meeting and decided that the bidding of the Project proposal
and the bidding of the BOT part of the Cultural and
Creative Park should be combined so that the potential
bidders will understand the whole Project better and make
feasible proposals. Therefore, the evaluation of the BOT
project should be submitted to the Museum until the bid
winners are chosen.
The bidders for “The Development of the Cultural and
Creative Park and the Related Urban Planning Modification”
were evaluated and the winner was chosen on April
29, followed by the price negotiation and the signing of
the contract.
The proposals for “The Grand Palace Museum Project”
were evaluated and the bid winner was selected on May
17. Following the price negotiation and the signing of the
contract, the Green Field International Group submitted a
revised proposal to the Museum. It was approved and sent
to the Planning Commission on July 13 for evaluation.
Later in September, the Green Field submitted a “Final
Report” to the Commission.
On July 15, Deputy Director Fung Mingchu and the
Museum representatives attended the proposal-reviewing
meeting hosted by the Council for Economic Planning
and Development. The meeting concluded by suggesting
the Executive Yuan to approve a budget of 16 million NT
dollars next year for the preliminary planning and the feasibility
assessment of the Project so that the Museum can
submit a complete proposal as well as mid-term and longterm
plans by 2011.
The Museum is located at the center of the Wai-shuan-xi
area. The urban planning of this region is outdated because
it has not been reviewed since 1987. In response to the
Project of Grand Palace Museum and Cultural and Creative
Park, the Taipei city government proposed a thorough
review of the urban planning of the Wai-shuan-xi area and
announced on August 27, 2010, a 30-day open proposal
request period. The Museum has requested the designated
site for the Cultural and Creative Industry Park to be included
in this review and will submit its plan to the Taipei
city government for reference.


大故宮計畫10月出爐 未來場館面積擴增5倍
http://news.rti.org.tw]更新日期:2011/08/25 17:36江昭倫

國立故宮博物院院長周功鑫今天(25日)表示,目前正在規劃「大故宮計畫」,預計10月由總統正式向外界宣布。擴建後的故宮總場館面積規模將擴增5倍,這也是故宮自1964年建址以來第六次擴建,備受矚目。


位於台北市外雙溪的國立故宮博物院,正館自1964年開始興建,至今一共有過5次擴建計畫。今年3月,故宮院長周功鑫提出「大故宮計畫」,希望進行第六次擴建,擴建後整個展館面積將從原有的9,500平方公尺,增加至6萬4,900平方公尺,增加5倍之多,屆時可以同步展出的文物將從現有的3千件一口氣增加為1萬5,000件。


為了讓大故宮計畫更周延,故宮9月中旬將召開國際研討會,邀請全世界各地對於博物館擴建相當有經驗的專家、建築師齊聚台北,針對大故宮計畫內容進行更謹慎的評估,確認可行性,然後由馬總統於10月正式向外界宣布。周功鑫說:『(原音)我們會在9月初辦這個研討會,9月20日以後跟總統作報告,10月有正式公布,我們每個步驟大概都安排好了,這樣的討論對我們來說是個謹慎的做法。』


依照故宮初步規劃,大故宮擴建範圍包括在正館前的廣場新建一個地下2層、地上4層的展覽場館,但不會影響到現有正館的視野;另外,故宮對面的停車場將規劃成文化園區,並結合文建會未來將成立的「文創院」,打造成為台灣文創發展重地!


The Grand National Palace Museum will be 5 times bigger than current capacity from 9500m2 to 64900 m2.
Reply With Quote
     
     
  #232  
Old Posted Aug 26, 2011, 9:02 PM
kalifese kalifese is offline
Registered User
 
Join Date: Apr 2011
Posts: 378
they should've just expanded it when they renovated the museum several years ago. that renovation was so modest and it barely added any space to the museum.
Reply With Quote
     
     
  #233  
Old Posted Aug 27, 2011, 10:55 AM
Coyett's Avatar
Coyett Coyett is offline
Bamboo Tiger
 
Join Date: Feb 2003
Posts: 2,278
I don't get why they don't build a downtown branch. The Songshan cigarette factory site is the perfect location for a such an institution.
Reply With Quote
     
     
  #234  
Old Posted Aug 27, 2011, 5:49 PM
khojiho khojiho is offline
Registered User
 
Join Date: Jun 2011
Posts: 12

Last edited by khojiho; Aug 27, 2011 at 5:50 PM. Reason: picture
Reply With Quote
     
     
  #235  
Old Posted Aug 28, 2011, 1:48 AM
williamchung taiwan's Avatar
williamchung taiwan williamchung taiwan is offline
Registered User
 
Join Date: Feb 2008
Posts: 3,367
Who is developer for this project?
Nangang Office Tower
Reply With Quote
     
     
  #236  
Old Posted Aug 28, 2011, 8:32 PM
khojiho khojiho is offline
Registered User
 
Join Date: Jun 2011
Posts: 12
I'm not sure...but the article says that the architects are from Aedas
Reply With Quote
     
     
  #237  
Old Posted Aug 29, 2011, 6:36 AM
williamchung taiwan's Avatar
williamchung taiwan williamchung taiwan is offline
Registered User
 
Join Date: Feb 2008
Posts: 3,367
http://tw.nextmedia.com/applenews/ar...sueID/20110312




「了解需求再建」南港商辦客制化
2011年 03月12日 【柯玥寧╱台北報導】隨著台灣與國際經貿往來更頻繁,商辦需求不僅增加,也朝向客制化設計。目前在南港軟體園區內、誠意開發持有的700坪商業地,不像多數建商蓋了再找買方,反而先找建築師與未來承租方,朝客制化設計,目前已拍板確定由國際建築師事務所Aedas設計總監溫子先操刀,有意向Google探詢,擬規劃為Google在台總部。


避免建好後養蚊
誠意開發所持有的商業地,位於園區街、重陽路口,目前由洗車業者租用,距捷運南港軟體園區站步行約10分鐘。
牽起誠意開發與Aedas(凱達環球公司)合作契機的是首席資產管理公司總經理陳敦厚,他分析,因為誠意開發不屬掛牌建商,沒有每年推案壓力,因此可慢慢規劃,為了避免建好後變成養蚊商辦,誠意開發決定從規劃時,就確定好承租方的需求再建。
據悉,Aedas是目前全球第2大跨國建築師事務所,在亞洲有多個設計案,包括澳門威尼斯人飯店、新加坡市政中心等,因為設計總監溫子先是美國成長的台灣人,因此在今年決定返台,陸續承包住宅、飯店及商辦案。


月租1坪1300元
第一太平戴維斯董事長朱幸兒說,國內目前有客制化的商用不動產多僅有商場,例如1~3樓高的商場,若1樓確定未來是國際精品進駐,則室內設計取向會符合該品牌需求,至於整棟辦公大樓朝客制化設計較少見。目前南港軟體園區的商辦行情,每月每坪租金1000~1300元,每坪售價30~35萬元。

Google Map



Should be this one......
Reply With Quote
     
     
  #238  
Old Posted Aug 30, 2011, 7:03 AM
williamchung taiwan's Avatar
williamchung taiwan williamchung taiwan is offline
Registered User
 
Join Date: Feb 2008
Posts: 3,367
I can confirm now, the developer is 誠意開發. The design director is Andy Wen, in chinese his name is 溫子先, same name in the news.
Reply With Quote
     
     
  #239  
Old Posted Aug 30, 2011, 7:06 AM
williamchung taiwan's Avatar
williamchung taiwan williamchung taiwan is offline
Registered User
 
Join Date: Feb 2008
Posts: 3,367
New Taipei City Museum of Art Conceptual Design International Competition


Three qualifiers and you can log in and vote. I think it is pretty much for New Taipei City citizens.

http://60.249.19.206/vote/index.php?page=vote





Reply With Quote
     
     
  #240  
Old Posted Sep 11, 2011, 4:36 PM
khojiho khojiho is offline
Registered User
 
Join Date: Jun 2011
Posts: 12
Reply With Quote
     
     
This discussion thread continues

Use the page links to the lower-right to go to the next page for additional posts
 
 
Reply

Go Back   SkyscraperPage Forum > Regional Sections > Asia-Pacific > Taiwan
Forum Jump



Forum Jump


All times are GMT. The time now is 12:14 PM.

     
SkyscraperPage.com - Archive - Privacy Statement - Top

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2024, vBulletin Solutions, Inc.