HomeDiagramsDatabaseMapsForumSkyscraper Posters
     

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Alberta & British Columbia > Vancouver > Metro Vancouver & the Fraser Valley

Reply

 
Thread Tools Display Modes
     
     
  #2141  
Old Posted Today, 5:11 PM
donslade donslade is online now
Registered User
 
Join Date: Feb 2017
Posts: 9
Quote:
Originally Posted by GeeCee View Post
They're not really talking about the towers here so much as the retail components that the leasing site addresses. Turn over is when substantial construction of the building(s) are completed and the individual tenants can begin fitting out their leased space to suit their own needs.
Given that, when would residents move in? Original completion date for tower one is Dec 2017 with an outside date of Dec 2018.
Reply With Quote
     
     
End
 
 
Reply

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Alberta & British Columbia > Vancouver > Metro Vancouver & the Fraser Valley
Forum Jump


Thread Tools
Display Modes

Forum Jump


All times are GMT. The time now is 5:22 PM.

     

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2017, vBulletin Solutions, Inc.