Quote:
Originally Posted by buzzg
Donald in front of the Alt has been ripped up every summer since they've opened, three years in a row now. Two of those years the sidewalk has been completely torn apart. The city doesn't have a clue about managing these projects.
It doesn't affect the Alt much other than "this construction sucks" impressions, but it has been destroying Merchant Kitchen. Year 1 the brand-new sidewalk had to be ripped up as the water lines to the whole development were installed wrong. Year two there was more sidewalk and road construction, they weren't able to get a patio til almost Labour Day, and this year the west side of Donald (and again, brand new sidewalks) have been ripped up and there's been so much construction they haven't even bothered to set the patio up most days as you can't breathe.
|
Not to be too nit-picky, but... Year 1's water line issues was construction debris in the lines which caused a whole 4 panels of brand new sidewalk to be replaced and affected Merchant Kitchen for less than a week (it happens). Year 2 there was watermain renewal, sidewalk and roadwork pretty much all year, agreed but they actually saved most of the brand new sidewalk that was placed when the hotel was built so I'll take that as a win. This year they're finishing up the second (east)half of the road reconstruction and yes that includes replacing the sidewalk, but it was hardly "brand new", more like 10 years old when the Mountain Co-op was built. Sometimes you have to replace stuff that's still in good condition because grade changes / new elevations force it.
Regardless, I agree Merchant Kitchen has been pretty screwed over for the better part of the last 2 summers, but no need to exaggerate to make the point. At least once this stretch of roadwork is done in the next week or two they should be golden for a long time with new infrastructure that will be the envy of most of Winnipeg (what a sad statement).
Getting back to True North Square, if Sutton Place and their restaurant eventually get the same treatment as Alt / Merchant Kitchen regarding road construction it will be the same short term pain for long term gain and they should be happy.