799 Southdale Road West - two 5s residential, one 6s retirement (Under Construction)

This is the link to the Urban Design Brief for this proposal.

This proposal is being discussed at the UDPRP this March.

Really interesting infill development that goes to great extents to create a complementary infill development within an existing growing subdivision.

Lots of growth coming to the southwest end.
Reply With Quote
     
     
  #2  
Old Posted Mar 10, 2020, 8:07 PM
jammer139 jammer139 is offline
Registered User
 
Join Date: Jun 2016
Location: London
Posts: 5,795
This is Vito's company and appears they are serious about getting into residential buildings. They built the 5s on Dundas near the Kellogg's plant. They had proposed the 25s on King St. but opposition to demolition wasn't going to be worth the effort when mother nature will do the job given time. Patience is on their side.



This looks like a very good proposal for the area. If only the city would get the dame road rebuilt and widen sooner rather then after all the development is already built.
Reply With Quote
     
     
  #3  
Old Posted Mar 13, 2020, 12:19 PM
MrSlippery519 MrSlippery519 is offline
Registered User
 
Join Date: Dec 2010
Posts: 1,081
They have been moving dirt the past few weeks so I figure that means he wants to get this started sooner than later.
Also agree about the road...especially if they do plan to put the roundabouts at Bostwick and Col Talbot it really needs to be done sooner than later.
Reply With Quote
     
     
  #4  
Old Posted May 15, 2020, 1:41 PM
jammer139 jammer139 is offline
Registered User
 
Join Date: Jun 2016
Location: London
Posts: 5,795
Reply With Quote
     
     
  #5  
Old Posted Sep 3, 2020, 11:34 AM
jammer139 jammer139 is offline
Registered User
 
Join Date: Jun 2016
Location: London
Posts: 5,795
Reply With Quote
     
     
  #6  
Old Posted May 26, 2022, 7:56 PM
jammer139 jammer139 is offline
Registered User
 
Join Date: Jun 2016
Location: London
Posts: 5,795
Construction fencing up around this site. Southside Construction trailers now on site as well. Since the 12s on Pond Mills is now topped out I could see them moving some of the structural folks over to this project. I also expect that Southside will be the general contractor on one or more of the SOHO affordable housing buildings once they start up on South street.
Reply With Quote
     
     
  #7  
Old Posted May 30, 2022, 4:17 PM
jammer139 jammer139 is offline
Registered User
 
Join Date: Jun 2016
Location: London
Posts: 5,795
Reply With Quote
     
     
  #8  
Old Posted Aug 25, 2022, 8:04 PM
jammer139 jammer139 is offline
Registered User
 
Join Date: Jun 2016
Location: London
Posts: 5,795
Heavy equipment on the site on the west side where the 6s building is planned. Looks like that will be the first phase.
Reply With Quote
     
     
  #9  
Old Posted Aug 25, 2022, 8:46 PM
CanadianTalk CanadianTalk is online now
Moderator
 
Join Date: Jun 2021
Location: London, Ontario
Posts: 693
Glad to see this development start to proceed.





Reply With Quote
     
     
  #10  
Old Posted Oct 7, 2022, 7:47 PM
jammer139 jammer139 is offline
Registered User
 
Join Date: Jun 2016
Location: London
Posts: 5,795
A tower crane is setup on the south end and concrete base for a 2nd tower crane on the north end for the 6s retirement building. Also Fieldgate Construction Management sign up on the fencing.


https://fieldgateconstruction.com/contact.php
Reply With Quote
     
     
  #11  
Old Posted Oct 15, 2022, 7:29 PM
jammer139 jammer139 is offline
Registered User
 
Join Date: Jun 2016
Location: London
Posts: 5,795
Footings being formed on the south end of the 6s building now. Still have not setup the north tower crane as of yet.
Reply With Quote
     
     
  #12  
Old Posted Oct 26, 2022, 7:22 PM
jammer139 jammer139 is offline
Registered User
 
Join Date: Jun 2016
Location: London
Posts: 5,795
2nd tower crane is now installed. Making some progress for the footings on the south end.
Reply With Quote
     
     
  #13  
Old Posted Nov 6, 2022, 7:52 PM
jammer139 jammer139 is offline
Registered User
 
Join Date: Jun 2016
Location: London
Posts: 5,795
Forming of the footings towards the north end progressing well. Have some of the L1 walls poured now at the south end.
Reply With Quote
     
     
  #14  
Old Posted Nov 24, 2022, 5:24 PM
jammer139 jammer139 is offline
Registered User
 
Join Date: Jun 2016
Location: London
Posts: 5,795
Have made alot of progress on the L1 walls and posts for the underground parking. Nearly 60% done I would say.
Reply With Quote
     
     
  #15  
Old Posted Dec 21, 2022, 6:52 PM
jammer139 jammer139 is offline
Registered User
 
Join Date: Jun 2016
Location: London
Posts: 5,795
They have completed nearly all the footings and L1 posts now. Still have some of the L1 perimeter walls left to form and pour in the north end. I expect they will complete that after the holiday break and get most of the L1 floor slab poured as well by end of January.
Reply With Quote
     
     
  #16  
Old Posted Jan 22, 2023, 3:33 PM
jammer139 jammer139 is offline
Registered User
 
Join Date: Jun 2016
Location: London
Posts: 5,795
Have poured around 50% of the L1 floor slab now. Have started forming for ground floor slab in the south end.
Reply With Quote
     
     
  #17  
Old Posted Feb 15, 2023, 3:56 PM
jammer139 jammer139 is offline
Registered User
 
Join Date: Jun 2016
Location: London
Posts: 5,795
Have now poured some of the ground floor slab in the south end. Forming for ground floor walls and posts now starting. The north end is still working on forming the L1 perimeter walls.
Reply With Quote
     
     
  #18  
Old Posted Mar 6, 2023, 9:20 PM
jammer139 jammer139 is offline
Registered User
 
Join Date: Jun 2016
Location: London
Posts: 5,795
Almost done pouring the L1 perimeter walls now on the north end. Have poured most of the ground floor slab on the southern half now and even have a few of the ground floor posts poured.
Reply With Quote
     
     
  #19  
Old Posted Apr 18, 2023, 6:23 PM
jammer139 jammer139 is offline
Registered User
 
Join Date: Jun 2016
Location: London
Posts: 5,795
Still have a section of L1 wall to form and pour on the north end to complete the L1 walls and posts. Have been working on a large section of ground floor slab forming for the NE corner. Still have not poured it yet. They have poured the 2nd floor slab and some of the 2nd floor walls and posts on the extreme south end of this building.
Reply With Quote
     
     
  #20  
Old Posted Apr 21, 2023, 8:25 PM
jammer139 jammer139 is offline
Registered User
 
Join Date: Jun 2016
Location: London
Posts: 5,795
Have now poured another section of ground floor slab and have nearly reached the NE corner. Forming for more of the north end ground floor slab continues. More of the 2nd floor walls and posts on the south end have now been poured.
Reply With Quote
     
     
This discussion thread continues

Use the page links to the lower-right to go to the next page for additional posts
 
 
Reply

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Ontario > London > Projects & Construction Updates
Forum Jump



Forum Jump


All times are GMT. The time now is 10:03 PM.

     
SkyscraperPage.com - Archive - Privacy Statement - Top

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2024, vBulletin Solutions, Inc.