Quote:
Originally Posted by Atlanta3000
Why wasn't this enforced at the property across from the High Museum and the Proton Therapy site. They sat empty with crappy fences for years.
|
First of all, both of those projects are under a separate SPI purview for Mditown.
Quote:
Sec. 16-18P.008. - Redevelopment requirements.
Property shall be redeveloped in accordance with the requirements of this chapter when 60 percent or greater of the principal building on the property is removed or destroyed by any means. This shall be construed as follows:
1. Any paving or other accessory structural elements within any required transitional yard shall be removed and buffers provided as required herein, notwithstanding any other provisions in part 16 to the contrary. 2. If no development is proposed concurrent with proposed demolition, all adjacent rights-of ways shall be repaired to provide ADA accessible public sidewalks within 180 days of completion of demolition. Further, within 18 months of the issuance of an SAP for such demolition, full streetscaping in accordance with section 16-18P.012 (including sidewalks and street trees) shall be installed.
( Ord. No. 2017-56(17-O-1401), § 1(Exh. 1), 10-2-17 )
|
Both of those properties had proposals put forth when they demolished the previous buildings, but the Great Recession stalled them- then the market forces pos-recession greatly altered these plans afterward.
SPI-16 only requires property owners to repair sidewalks within 180 days of demolition and to provide full streetscaping within 18 months if no concurrent development is proposed after demolition.