Antonie Predock Walks Away From Chiayi National Palace Museum Project

Architectural firm quits museum branch project

http://www.taipeitimes.com/News/taiw.../27/2003429646

STAFF WRITER, WITH CNA
Thursday, Nov 27, 2008, Page 4
The architectural firm that had been selected to design the National Palace Museum’s Southern Branch has withdrawn from the project.

Antoine Predock Architect PC said on Tuesday that it was quitting the design project with immediate effect and billed the museum headquarters in Taipei for NT$40 million (US$1.2 million) in compensation for losses incurred.

The firm had been selected by a competition jury four years ago from a field of six finalists to design the museum in Chiayi County.

Chiayi County officials in charge of cultural affairs said the firm’s unilateral decision to pull out may have been the result of a failure to reach an accommodation with the museum over serious construction delays, design methods and the quality of building materials.

The officials said that if the museum had agreed to the firm’s demands, it would have led to a 30 percent increase in construction costs.

The project could still proceed despite the firm’s withdrawal if the museum were to reopen international bidding for the design and the budget is approved, the officials said.

“The southern branch could still be built by 2011 as scheduled if the construction budget is passed by the Legislative Yuan in time,” they said.

The Executive Yuan approved the construction of the southern branch in 2003, estimating that the branch museum would be built on a 70 hectare site with a total budget of approximately NT$6 billion.

The budget for clearing the land, which included digging an artificial lake, planting trees and installing irrigation and water-drainage systems, is NT$450 million.

The project had been scheduled to be around 20 percent complete by Jan. 7, though the actual completion figure was listed as 11.9 percent. The government has also not approved the project’s annual budget allocation since 2003.

The 60m-tall building was to have been built in the shape of Yushan, and would have been visible to passengers on the high-speed railway.

Explaining the design concept in 2004, Antoine Predock said: “Our proposal brings into focus a synthesizing concept of the intimate, varied pan-Asian universe that the National Palace Museum Southern Branch intends to illuminate: ‘The need to know ourselves and other Asian regions as well.’”

“Like Lin Hwai-min (林懷民) and Cloud Gate Dance Theatre of Taiwan’s 2001 production Cursive, visitors move through space and atmosphere, ‘imitating the linear route of ink, full of lyrical flows and strong punctions, with rich variations in energy,’” he said.

Chiayi County Commissioner Chen Ming-wen (陳明文) gave an assurance earlier this year that the branch would open on schedule in 2011, despite serious construction delays.
Reply With Quote
     
     
  #2  
Old Posted Nov 29, 2008, 3:37 AM
williamchung taiwan's Avatar
williamchung taiwan williamchung taiwan is offline
Registered User
 
Join Date: Feb 2008
Posts: 3,356
Actually, I'm not surprised. Taiwan does not have any professional sector to run such a big project design by foriegn architect.
Reply With Quote
     
     
  #3  
Old Posted Nov 29, 2008, 6:25 AM
Coyett's Avatar
Coyett Coyett is offline
Bamboo Tiger
 
Join Date: Feb 2003
Posts: 2,278
Quote:
Originally Posted by williamchung taiwan View Post
Actually, I'm not surprised. Taiwan does not have any professional sector to run such a big project design by foriegn architect.
This is not the problem. Taiwan has quite a few professional project management firms that are more than capable of handling the construction of the museum - CECI, MAA, Taiwan Obayashi, etc.
Reply With Quote
     
     
  #4  
Old Posted Nov 29, 2008, 6:07 PM
Razqal Razqal is offline
Registered User
 
Join Date: Jun 2002
Posts: 1,263
i think the problem is that taiwanese are cheap - they are always looking for ways to cut corners to save an NT. they may have a grand vision for a project - their selection of a foreign architect proves so - but grand visions are not cheap and they're just not willing to pay for it.

another problem is that the museum is government owned and the govt. lacks capital. i think the npm should be privatized so that they can raise more funds for museum renovations via private investments and fundraising. look at the taipei npm renovation - they barely spent any money on it so it pretty much looks the same and from what i heard hasn't expanded the space that much. it really was just a basic renovation to update it and make it useable. compare that to other museum renovations around the world like the metropolitan and moma museums in ny, the louvre in paris and british museum which spent tons more money on quality architecture and significantly expanding museum size to make themselves truly world class museums.

when it said that "the firm’s unilateral decision to pull out may have been result of a failure to reach an accommodation with the museum over serious construction delays, design methods and the quality of building materials", i wouldn't be surprised if the taiwanese wanted to use cheap bathroom tiles to clad the museum with instead of quality marble or stone. it's just sad when even poorer china is churning out top-notch architectural projects by the day, taiwan cannot even build one friggin' museum in 4 years. this project would have been completed in other countries already. truly sad...

Last edited by Razqal; Nov 29, 2008 at 6:24 PM.
Reply With Quote
     
     
  #5  
Old Posted Nov 30, 2008, 9:20 AM
williamchung taiwan's Avatar
williamchung taiwan williamchung taiwan is offline
Registered User
 
Join Date: Feb 2008
Posts: 3,356
Quote:
Originally Posted by taiwan ren View Post
This is not the problem. Taiwan has quite a few professional project management firms that are more than capable of handling the construction of the museum - CECI, MAA, Taiwan Obayashi, etc.
Not for private, but for the public. The really thing I want to say is that problem is in the government.
Reply With Quote
     
     
  #6  
Old Posted Nov 30, 2008, 9:40 PM
Razqal Razqal is offline
Registered User
 
Join Date: Jun 2002
Posts: 1,263
Quote:
Originally Posted by williamchung taiwan View Post
Not for private, but for the public. The really thing I want to say is that problem is in the government.

that's why they should privatize the museum.
Reply With Quote
     
     
End
 
 
Reply

Go Back   SkyscraperPage Forum > Regional Sections > Asia-Pacific > Taiwan
Forum Jump


Thread Tools
Display Modes

Forum Jump


All times are GMT. The time now is 4:38 PM.

     
SkyscraperPage.com - Archive - Privacy Statement - Top

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2024, vBulletin Solutions, Inc.