Quote:
Originally Posted by Jamaican-Phoenix
I would actually have it be Montreal-Ottawa-Toronto with connection to all three airports. This way, you actually connect via HSR three of the four largest cities in Canada...
|
Just a standard speed rail connection (not shared with freight) with good frequency, would be enough to tie in, no reason to pay so much when there would be a forced transfer in Montreal anyways (don't think their would be enough O'D to justify direct Ottawa-Toronto trains at the frequency needed to make it viable).
You could make the same justification to extending to Hamilton using highspeed, but what is the point really, it is better to build in phases, and build up good feeder networks, which takes alot of time. Plus, it would likely make more sense to not run through Hamilton at all, but roughly follow the 401 and hit the surrounding cities. Especially since the infrastructure is already planned to feed Hamilton into the Union hub.