HomeDiagramsDatabaseMapsForum About
     

Go Back   SkyscraperPage Forum > Discussion Forums > Buildings & Architecture > Never Built & Visionary Projects > Cancelled Project Threads Archive


The Falls in the SkyscraperPage Database

Building Data Page   • Comparison Diagram   • Melbourne Skyscraper Diagram

Map Location
Melbourne Projects & Construction Forum

 

 
Thread Tools Display Modes
     
     
  #1  
Old Posted Dec 8, 2007, 12:53 AM
Front_Range_Guy's Avatar
Front_Range_Guy Front_Range_Guy is offline
Registered User
 
Join Date: Aug 2005
Location: Colorado Springs, CO
Posts: 4,502
COLORADO SPRINGS | Cooper Tower | 260 FT / 79 M | 22 FLOORS | PRO

Renderings and information from the Colorado Springs Business Journal...






Reworked, redesigned, ready to go

Cooper Tower one step closer to being reality

Becky
Hurley
December 7, 2007

After more than three years of planning, scores of pro forma analysis and two different architects, a new landmark appears poised to join the city’s downtown fraternity of signature structures.

With planning commission and City Council final approval expected during the first quarter 2008 — and pending a few exterior architectural tweaks, the Cooper Tower hotel and mixed-use complex project is scheduled to begin demolition, residential pre-sales and site excavation next spring on North Nevada Avenue, between Pikes Peak Avenue and Kiowa Street.

Ray O’Sullivan, president of Realty Development Services and a partner in Cooper Holdings LLC, appeared before the Planning Commission this week to ask for final approval of the project.

City land review and development planner Steve Tuck said that with revisions to an upper-level cantilevered design feature, his department is prepared to recommend approval. The final step will be receiving approval from City Council during its first meeting in January.

The process to reach this point hasn’t been easy.

“We must have run 80 different pro formas to make the numbers work,” said Steve Boyette, vice president of Realty Development Services, adding that he has been able to bring costs in at under $100 million.

The biggest challenge, he said, was finding the proper mix of building uses, with the final result being a “stacked” 22-floor commercial, hotel and residential complex.

Included in the high-rise “condotel” will be 37,000 square feet of main level retail, restaurants and kitchen space; three levels of above-grade secured parking; two floors dedicated to meeting space, offices and ballrooms; plus amenities such as a swimming pool, outdoor patios, a spa and fitness center.

Plans also call for 240 hotel guest rooms and up to nine floors of residential living. Boyette said the estimated construction cost for Cooper Tower’s residential units will be about $400 per square foot.

“We are still doing the interior layout, but anticipate having anywhere from 40 to 60 units available for sale,” he said. “I’ve toured Denver condotels similar to what we’re doing — but their upper level spaces have sold for $750 per square foot.”

Boyette acknowledged that the process had been an “evolution.”

The parking structure, for example, was moved from underground to above-grade, and will extend south to land occupied by a small, owner-user building at 15 N. Nevada Ave.

“We also realized, that our market is really focused on two groups: one will be looking for luxury, views and a ‘penthouse’ feel, while the other is probably a local couple, young professional or seasonal buyer looking for a smaller well-appointed unit at a moderate price,” Boyette said.

He predicts condominium spaces will range in size from about 1,000 square feet to 10,000 square feet.

“Who knows? The 22nd floor may be purchased by a single buyer, and we’re prepared to discuss that kind of arrangement,” Boyette said.

He said that at least a dozen prospects have expressed interest in the residential units, and that early contracts will trigger the project’s construction kick-off and financing. A spring 2010 completion date is planned.

Architect Tucker-Sadler of San Diego designed the building, and a hotel management company will be hired to run the day-to-day operations.

Guman and Associates is the project’s land planning and landscape consultant.

Downtown the big winner

Downtown advocates have followed the Cooper Tower’s progress and see the 580,000-square-foot complex as a major economic driver that will bring increased numbers of visitors and locals to spend time and money downtown.

“Studies we’ve commissioned in the past show that downtown can support at least 450 rooms and more meeting space,” said Beth Kosley, executive director for the Downtown Partnership.

And there may be good reason for optimism.

According to Debbie Evercloud, a Yorktown University economics professor and owner of Aspenheart Economics, the construction project could generate as much as $112 million in direct economic stimulus to the local economy.

That figure is based on the purchase of construction materials as well as added consumption by those who are employed to work on the project.

Evercloud’s projections are based on a “regional impact multiplier” used by the U.S. Department of Commerce.

For now, however, Sullivan, Boyette and the other partners in Cooper Holdings are focused on getting construction under way — well aware that a 220-unit downtown Embassy Suites Hotel has been proposed by national hotel developer John Q. Hammons.
     
     
  #2  
Old Posted Dec 8, 2007, 2:13 AM
Dream'n's Avatar
Dream'n Dream'n is offline
Registered User
 
Join Date: Aug 2002
Location: Twin Cities
Posts: 626
That's a whole lot of building...maybe not so tall but you've basically got 2 buildings there bisected.
__________________
I ain't got time to BREED
     
     
  #3  
Old Posted Dec 8, 2007, 2:48 AM
Front_Range_Guy's Avatar
Front_Range_Guy Front_Range_Guy is offline
Registered User
 
Join Date: Aug 2005
Location: Colorado Springs, CO
Posts: 4,502
Right. I believe the design is a result of outdated planning policies dictating how far back from the street you have to be in relation to how high you can go, if that makes sense. I don't work in the industry, in case you can't tell. There are efforts to change the rules, but the developer wasn't interested in waiting. Unofficially, a document called "The Downtown Action Plan" from the early 1990's set's a height limit downtown at 207 feet. It seems easy enough for developers to get variances to go higher. Our current tallest is 247 feet. There's been some backlash from people who are worried about blocking mountain views. Apparently a 207 foot building doesn't block the view, but a 208 foot building does?

Anyway, because of the dated rules, a similar project coming down the line is probably going to have an equally odd/bulky design.
     
     
  #4  
Old Posted Dec 10, 2007, 1:22 AM
GreatMuta's Avatar
GreatMuta GreatMuta is offline
Registered User
 
Join Date: Jan 2007
Location: Colorado Springs
Posts: 76
This is a huge deal for downtown Colorado Springs Hope they can start construction in spring sometime.
     
     
  #5  
Old Posted Dec 10, 2007, 5:36 AM
FrancoRey's Avatar
FrancoRey FrancoRey is offline
Stay Thirsty.
 
Join Date: Sep 2006
Location: Denver, CO
Posts: 2,835
About time the Springs got a tower over 20 floors! I'm sorry, you guys are behind for a city of over 600k people!

Here's to more in the near future.
     
     
  #6  
Old Posted Jan 9, 2008, 1:30 PM
Front_Range_Guy's Avatar
Front_Range_Guy Front_Range_Guy is offline
Registered User
 
Join Date: Aug 2005
Location: Colorado Springs, CO
Posts: 4,502
     
     
  #7  
Old Posted Jan 10, 2008, 12:20 AM
The Dirt The Dirt is offline
Registered User
 
Join Date: Dec 2007
Posts: 3,212
"If built, it will be downtown’s tallest structure, at 257 feet, a distinction now held by Wells Fargo Bank at Palmer Center, at Cascade and Colorado avenues, whose 15 stories stand 247 feet high." -- from the aforementioned article

I guess they took it down a bit from 260 feet. That's still a big deal for Colorado Springs. I wonder if the neighbors had anything to do with the scaled-back height?
     
     
  #8  
Old Posted Jan 10, 2008, 1:41 AM
FrancoRey's Avatar
FrancoRey FrancoRey is offline
Stay Thirsty.
 
Join Date: Sep 2006
Location: Denver, CO
Posts: 2,835
If they took the height down THREE feet? If that's the case, no reason to be proud of themselves.
     
     
  #9  
Old Posted Jan 10, 2008, 2:05 AM
GreatMuta's Avatar
GreatMuta GreatMuta is offline
Registered User
 
Join Date: Jan 2007
Location: Colorado Springs
Posts: 76
     
     
  #10  
Old Posted Aug 13, 2015, 12:24 AM
Urbannizer's Avatar
Urbannizer Urbannizer is offline
Moderator
 
Join Date: Jan 2009
Location: 360, St. Edwards
Posts: 12,381
Cancelled



http://www.csindy.com/coloradospring...nt?oid=1146175

Quote:
Waiting, however, is a luxury not everyone can afford. Ray O'Sullivan's Cooper Tower would have been downtown's tallest building. But the plan was scrapped when O'Sullivan found himself buried in debt in a down economy.
__________________
HAIF
     
     
End
 
 
 

Go Back   SkyscraperPage Forum > Discussion Forums > Buildings & Architecture > Never Built & Visionary Projects > Cancelled Project Threads Archive
Forum Jump



Forum Jump


All times are GMT. The time now is 10:55 PM.

     
SkyscraperPage.com - Archive - Privacy Statement - Top

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2024, vBulletin Solutions, Inc.